Project:
Date:
DEVELOPMENT FEE TABLE
Coppell Tennis Center
10/17/02
· TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,1 gO.O0
(100% due at Tssuance of Building Permit)
Water Tap Inspection Fee $150.00
(l 00% due at Issuance of Water Meter)
~Vater Meter Fee (Domestic) $205.28
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigatiOn/Fireline) $2,297.72
(100% due at Issuance ~f,Wa~? Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irfigationffireline Meter Deposit $60.00
(100% due st Issuance of Water Meter)
Wastewater ImpaCt Fee $2,240.00
( 100% clue at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at issuance ol'.B..ui]din8 Permit) .....
Utility Final Inspection Fee $50.00
(I 00% One at lssuzmce of Building Permit) ....
Park Fee $0.00 $0.00
(I00% due prior to Council Approval)
Roadway Impact Fee $0.00 $0,00
'0 00% due prior to Council Approval)
Street Light Fee Information not Available
,(100% due prior to Acceptance of Pro, iect) [[
S~rcet Sign Fcc Information not Available
(100% duc prior :o Acceptance of Project) il
Construction Inspection Fee information not Available
( 100% clue prior to Start or' Construction)
,'OTAL $10,263.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
lO×17×2002 11:58 CiTY OF COPPELL ENGR. DEPT. + SRU CTR NU.~D ~0
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppvll Tennis Comer
DATE: ]0/i 7/02
Wa~r Impact Fee:
Oomestic Meter(s)
Irrigation Meter(s):
Fireline Meter(s):
;1 - 2 inch = 8
i · 2 inch 8 [SU's
O = 0 ESU's
! * 8 inch = 2.5 [SU's
Total ~t: ]8,5 ESU's
(Due prior to issuance of Duilcling permit)
Water Tap Inspection Fca:
Total #:
3 Connections ~ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other Oevelopments due prior to issuance of meter)
Domestic Water Meter Fee:
Tota~ #:
Domestic Meter(s) {~ ~205.28
(Single family clue prior lo issuance of building permit)
(All other developments clue prior to issuance of meter)
lrrigatleufEIrellne Water Meter Fee:
Total t~: 1 irrigation Meter(s) ~
Total #: 0 Additiopal irrigation Meter(s) ~
Total #: I Fireline Meter(s) ~
(100% clue prior to issuance of water meters)
$205.28
$0,00
~;2~092.44
Domestic Water Meier Deposit ]Fcc:
Total #: ! Meter,s) @ $30.00 ea
(]00% due prior to issuance of w~ter meters)
lrrlgatioa/Flre Meter Deposit Fee:
Total #: 2 Meterls) ~ $30.00 ea.
(100% due prior to issuance of wa[er maters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8
(Due prior to issuance of building permit)
$280.00 ea.
Wasiewater Tap Iospectio. lee:
Total #: 1 Connections ~ $50.00 ea
(100% due prior to issuance of building permit)
]Final inspection Fee (All development~):
Total #: 1 LOtS ~ $50.00 ea.
(100% due prior [o issuance of building permit)
~;5,180.00
$150.00
$205.28
.... ~205 28
$0.00
$2.092.44
$30.00
$60,00
$2,240.00
$50.00
$50,00
$0.00
o.oo
Park Fee (For Residential Developments Only): * erelintiaary plat approved:
0
0
Single-family ~ $0,00 per lot
Multi.family ~ $0.00 per unit
(50% paid prior to Council approval o! final plat)
Page
11:38 CITY OF COPPELL ENGR. DEPT. a SRU CTR N0.085 Q04
DEVELOPMENT FEE WORKSHEET
(50% paicl at issuance of building permit)
Roadway Impact Fee:
(See attached ~ee calculations)
Sa'eel Lighltng Fees:
Assessed for lighting iN the City's dgnt.0Lway,
This tee cannot be assessed until ~fter T.U. Electric submits
the lighting plan for the proposed development,
Once the plans are submitted, $292.60 per Ii~h~ will be assessed,
('100% due prior to tinal acceptance pt development)
}0,00
Information not Available
$~eet $iga ~'ees:
Assessed for signaga in the City's right.of.way.
(See attached fee calculations if applicable)
Information not Available
Coastractloa I[espe¢tioa Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by ~he Engineering Department.
(2% of development cost required 1'or private improvements)
(4% of development cost requireO for public improvements)
Information not Available