Loading...
PA9901-CS02101710/17/20D2 11:58 CITY OF COPPELL ENGR~ DEPT. a SRU CTR N0.085 Project: Date: DEVELOPMENT FEE TABLE Coppell Tennis Center 10/17/02 · TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,1 gO.O0 (100% due at Tssuance of Building Permit) Water Tap Inspection Fee $150.00 (l 00% due at Issuance of Water Meter) ~Vater Meter Fee (Domestic) $205.28 (100% due at Issuance of Water Meter) Water Meter Fee (IrrigatiOn/Fireline) $2,297.72 (100% due at Issuance ~f,Wa~? Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irfigationffireline Meter Deposit $60.00 (100% due st Issuance of Water Meter) Wastewater ImpaCt Fee $2,240.00 ( 100% clue at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at issuance ol'.B..ui]din8 Permit) ..... Utility Final Inspection Fee $50.00 (I 00% One at lssuzmce of Building Permit) .... Park Fee $0.00 $0.00 (I00% due prior to Council Approval) Roadway Impact Fee $0.00 $0,00 '0 00% due prior to Council Approval) Street Light Fee Information not Available ,(100% due prior to Acceptance of Pro, iect) [[ S~rcet Sign Fcc Information not Available (100% duc prior :o Acceptance of Project) il Construction Inspection Fee information not Available ( 100% clue prior to Start or' Construction) ,'OTAL $10,263.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 lO×17×2002 11:58 CiTY OF COPPELL ENGR. DEPT. + SRU CTR NU.~D ~0 DEVELOPMENT FEE WORKSHEET PROJECT: Coppvll Tennis Comer DATE: ]0/i 7/02 Wa~r Impact Fee: Oomestic Meter(s) Irrigation Meter(s): Fireline Meter(s): ;1 - 2 inch = 8 i · 2 inch 8 [SU's O = 0 ESU's ! * 8 inch = 2.5 [SU's Total ~t: ]8,5 ESU's (Due prior to issuance of Duilcling permit) Water Tap Inspection Fca: Total #: 3 Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (All other Oevelopments due prior to issuance of meter) Domestic Water Meter Fee: Tota~ #: Domestic Meter(s) {~ ~205.28 (Single family clue prior lo issuance of building permit) (All other developments clue prior to issuance of meter) lrrigatleufEIrellne Water Meter Fee: Total t~: 1 irrigation Meter(s) ~ Total #: 0 Additiopal irrigation Meter(s) ~ Total #: I Fireline Meter(s) ~ (100% clue prior to issuance of water meters) $205.28 $0,00 ~;2~092.44 Domestic Water Meier Deposit ]Fcc: Total #: ! Meter,s) @ $30.00 ea (]00% due prior to issuance of w~ter meters) lrrlgatioa/Flre Meter Deposit Fee: Total #: 2 Meterls) ~ $30.00 ea. (100% due prior to issuance of wa[er maters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 (Due prior to issuance of building permit) $280.00 ea. Wasiewater Tap Iospectio. lee: Total #: 1 Connections ~ $50.00 ea (100% due prior to issuance of building permit) ]Final inspection Fee (All development~): Total #: 1 LOtS ~ $50.00 ea. (100% due prior [o issuance of building permit) ~;5,180.00 $150.00 $205.28 .... ~205 28 $0.00 $2.092.44 $30.00 $60,00 $2,240.00 $50.00 $50,00 $0.00 o.oo Park Fee (For Residential Developments Only): * erelintiaary plat approved: 0 0 Single-family ~ $0,00 per lot Multi.family ~ $0.00 per unit (50% paid prior to Council approval o! final plat) Page 11:38 CITY OF COPPELL ENGR. DEPT. a SRU CTR N0.085 Q04 DEVELOPMENT FEE WORKSHEET (50% paicl at issuance of building permit) Roadway Impact Fee: (See attached ~ee calculations) Sa'eel Lighltng Fees: Assessed for lighting iN the City's dgnt.0Lway, This tee cannot be assessed until ~fter T.U. Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per Ii~h~ will be assessed, ('100% due prior to tinal acceptance pt development) }0,00 Information not Available $~eet $iga ~'ees: Assessed for signaga in the City's right.of.way. (See attached fee calculations if applicable) Information not Available Coastractloa I[espe¢tioa Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by ~he Engineering Department. (2% of development cost required 1'or private improvements) (4% of development cost requireO for public improvements) Information not Available Page 2