YMCA-CS 980611The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 75019
RO. Box 478
Coppell, Texas 75019
972-462~3022
Bill Anderson, P.E.
Dowdey Anderson & Associates
5225 Village Creek Drive
Piano, TX 75093
Coppell Family Y.M.C.A.
Development Fee Assessment
Dear M Anderson:
June 11, 1998
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the am $9,450.00 and forward to the
Finance Depa~iment along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Coppell Family Y.M.C.A.
Date: 6/11/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,850.00 $5,850.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $192.15
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $142.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation/Fireline) $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100 % due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $10,049.95
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,450.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Family Y.M.C.A.
DATE: 6/11/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1-2in~ = 8 ESU's
1-11~inch = 5 ESU's
= ESU's
= ESU~
Total #: 13 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections ~ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $192.15
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total 0: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 0 Metar(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Irrigation/Fire):
Total #: 1 Meter(s) ~} $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ES
8
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: 1 Lots @ $50.50 ea.
(100% due prior to issuance of building permit)
$5,850.00
$100.00
$192.15
$142.80
$0.00
$0.00
$35.00
$30.00
$3,600.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid pdor to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
Single-family @ $350.00 / Lot
Multi-family ~ $350.00 / Unit
(50% paid pdor to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family ~ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
N/A
N/A
N/A
N/A
N/A
N/A
$0.0o
Information not
available at this time
lnformation not
available at this time
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
P~o2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Coppell Family Y.M.C.A.
6/11/98
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Institutional
Land Use ** Others/Not Specified
Building Size (Sq. Ft.) 35,000
Development Units ** 35
Vehicle Miles per Development Unit ** 0.56
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $5,880.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd.
& Sandy Lake Rd.. Therefore no Roadway Impact Fee will be collected on this project