Loading...
YMCA-CS 980611The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972-462~3022 Bill Anderson, P.E. Dowdey Anderson & Associates 5225 Village Creek Drive Piano, TX 75093 Coppell Family Y.M.C.A. Development Fee Assessment Dear M Anderson: June 11, 1998 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the am $9,450.00 and forward to the Finance Depa~iment along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Coppell Family Y.M.C.A. Date: 6/11/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $142.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation/Fireline) $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100 % due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $10,049.95 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,450.00 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Family Y.M.C.A. DATE: 6/11/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1-2in~ = 8 ESU's 1-11~inch = 5 ESU's = ESU's = ESU~ Total #: 13 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total 0: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 0 Metar(s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation/Fire): Total #: 1 Meter(s) ~} $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 8 $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 1 Lots @ $50.50 ea. (100% due prior to issuance of building permit) $5,850.00 $100.00 $192.15 $142.80 $0.00 $0.00 $35.00 $30.00 $3,600.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot Multi-family ~ $350.00 / Unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family ~ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A N/A N/A N/A N/A N/A $0.0o Information not available at this time lnformation not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts P~o2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Family Y.M.C.A. 6/11/98 ROADWAY IMPACT FEE: Service Area * 2 Category ** Institutional Land Use ** Others/Not Specified Building Size (Sq. Ft.) 35,000 Development Units ** 35 Vehicle Miles per Development Unit ** 0.56 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $5,880.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd.. Therefore no Roadway Impact Fee will be collected on this project