Loading...
ST9302-LR 991016ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9?2/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 10/16/99 PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-93 TEST DATA: TEST "'"~. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 277 10/16/99 FG 1L 22.2 94.7 23.0 91 96 3-AD 278 10/16/99 FG 1L 22.2 94.7 22.5 91 96 3-AD 279 10/16/99 FG 1L 22.2 94.7 23.5 95 101 3-AD 280 10/16/99 FG 1L 22.2 94.7 23.4 93 98 3-AD 281 10/16/99 FG 1L 22.2 94.7 22.9 93 99 3-AD 282 10/16/99 FG 1L 22.2 94.7 23.1 91 96 3-AD 283 10/16/99 FG 1L 22,2 94.7 22.2 95 100 3-AD TEST LOCATION: 277 RETEST OF TEST #267 PERFORMED ON 10/14/99 278 RETEST OF TEST #268 PERFORMED ON 10/14/99 279 RETEST OF TEST #269 PERFORMED ON 10/14/99 280 RETEST OF TEST #271 PERFORMED ON 10114/99 281 RETEST OF TEST #273 PERFORMED ON 10/14/99 282 RETEST OF TEST #270 PERFORMED ON 10/14/99 283 RETEST OF TEST #274 PERFORMED ON 10/14/99 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Respq_ctfully Submittec[, ALPHA TEST'IN~, INC. Geotechnical Engineering · Construction Materials Teslfng · Environmental Engineedng · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 10/16/99 PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-93A TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,.~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 284 10/16/99 FG 1L 22.2 94.7 21.3 92 97 3-AD 285 10/16/99 FG 1L 22.2 94.7 20.5 94 99 3-AD 286 10/16/99 FG 1L 22.2 94.7 22.2 92 98 3-AD 287 10/16/99 FG 1L 22.2 94.7 23.2 96 101 3-AD 288 10/16/99 FG 1L 22.2 94.7 21.8 95 100 3-AD 289 10/16/99 FG 1L 22.2 94.7 23.5 95 100 3-AD ' 290 10/16/99 FG 1L 22.2 94.7 22.4 94 100 3-AD TEST LOCATION: 284 RETEST OF TEST #272 PERFORMED ON 10/14/99 285 RETEST OF TEST #275 PERFORMED ON 10/14/99 286 RETEST OF TEST #231 PERFORMED ON 10/13/99 287 RETEST OF TEST #232 PERFORMED ON 10/13/99 288 RETEST OF TEST #233 PERFORMED ON 10/13/99 289 RETEST OF TEST #234 PERFORMED ON 10/13/99 290 RETEST OF TEST #235 PERFORMED ON 10/13/99 1. FILL 2. NATURALSUBGRADE 3. LIME STABIL~ED CEMENTTREATED A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS S. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C, PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS RETEST R ~'~.ect fully S u,b .mit~ ALPHA TESTING, Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consutlfng ~ ~ ~ i !' ~ I' ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 10/16/99 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-93B PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 291 10/16/99 FG 1L 22.2 94.7 22.9 94 99 3-AD 292 10/16/99 FG 1L 22.2 94.7 23.0 90. 95 3-AD 293 10/16/99 FG 1L 22.2 94.7 24.5 93' 98 3-AD 294 10/16/99 FG 1L 22.2 94.7 26.5 91 96 3-AD 295 10/16/99 FG 1L 22.2 94.7 21.5 96' 102 3-AD 296 10/16/99 FG 1L 22.2 94.7 23.6 91 96 3-AD 297 10/16/99 FG 1L 22.2 94.7 22.5 94 99 3-AD TEST LOCATION: 291 RETEST OF TEST #236 PERFORMED ON 10/13/99 292 RETEST OF TEST #237 PERFORMED ON 10/13/99 293 RETEST OF TEST #238 PERFORMED ON 10/13/99' 294 RETEST OF TEST #239 PERFORMED ON 10/13/99 295 RETEST OF TEST #240 PERFORMED ON 10/13/99 296 RETEST OF TEST #241 PERFORMED ON 10/13/99 297 RETEST OF TEST #242 PERFORMED ON 10/13/99 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4, CEMENTTREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D, RETEST Re~spectfully Submitte~ ~ ' '. J / ',.. ~\ '.? ALPHA TESTING,TNC/¢-¢- Geotechnical Engineering · Construction Materials Testing · En~ronmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 10/16/99 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-93C PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST '",~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 298 10/16/99 FG 1L 22.2 94.7 23.1 91 96 3-AD TEST LOCATION: 298 RETEST OF TEST #243 PERFORMED ON 10/13/99 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED ~ A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C, PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Res~te~,tfully Sub. mitred/ /./,, ../,.,.~- ? , Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting