ST9801-CS010131 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To;
Larry Davis, Construction Inspector Engineering
Avery Rodgers, Streets Division Public Works
January 31, 2001
Follow-up Walk-thru Coppeil Road Project
D AGE
Note: This walk-thru b~gau at the south end of Coppell Rd.
1. 1~r Inlet box just south of Fa~twick, pipe separation and ~oncrete obstruction of RCP.
2. 2~ Inlet box west side of Coppell Rd. coming in from south, last joint before
connectln~ to main is bad.
3~ Inlet box RCP holds water; flow line bad, mud in RCP.
4. Junction box south of Parkway lid is stuck.
5. 4a Inlet box: all pipes leading to junction box need to be sealed.
6. 5~ Inlet box RCP broken north of Canyon Drive on west side of street.
7. 6~ Inlet box grout all joints (gap open).
8. 7a Inlet box grout 2"~ joints.
9. On the east side of Coppell Rd. about 20' into the pipe, the 21" RCP dumping into
the 6' X 9' barrel needs to have concrete removed from joint and grouted.
10. On west side of Coppell Rd. approximately 42' into the pipe, the 21" RCP dumping
into the 6' x 9' barrel is obstructed by concrete and joint needs grouted.
CITY OF COPPELL PUBLIC P?ORK~ DEPARTMENT
MESSAGE
CONF I RMAT I ON
01~31/01 16:34
ID--CITY OF COPPELL
DATE
01/31
S,R-TIME DISTANT STATION ID MODE PAGES
00'23" CITY OF COPPELL CALLING 01
RESULT
OK 0000