Loading...
ST9801-CS010131 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To; Larry Davis, Construction Inspector Engineering Avery Rodgers, Streets Division Public Works January 31, 2001 Follow-up Walk-thru Coppeil Road Project D AGE Note: This walk-thru b~gau at the south end of Coppell Rd. 1. 1~r Inlet box just south of Fa~twick, pipe separation and ~oncrete obstruction of RCP. 2. 2~ Inlet box west side of Coppell Rd. coming in from south, last joint before connectln~ to main is bad. 3~ Inlet box RCP holds water; flow line bad, mud in RCP. 4. Junction box south of Parkway lid is stuck. 5. 4a Inlet box: all pipes leading to junction box need to be sealed. 6. 5~ Inlet box RCP broken north of Canyon Drive on west side of street. 7. 6~ Inlet box grout all joints (gap open). 8. 7a Inlet box grout 2"~ joints. 9. On the east side of Coppell Rd. about 20' into the pipe, the 21" RCP dumping into the 6' X 9' barrel needs to have concrete removed from joint and grouted. 10. On west side of Coppell Rd. approximately 42' into the pipe, the 21" RCP dumping into the 6' x 9' barrel is obstructed by concrete and joint needs grouted. CITY OF COPPELL PUBLIC P?ORK~ DEPARTMENT MESSAGE CONF I RMAT I ON 01~31/01 16:34 ID--CITY OF COPPELL DATE 01/31 S,R-TIME DISTANT STATION ID MODE PAGES 00'23" CITY OF COPPELL CALLING 01 RESULT OK 0000