Loading...
ST9801-CS010104 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS From: Date: RE: Paving 1. 2. 3. 4. 5. 6. 7. Larry Davis, Construction lnnpector Engineering Larry Morton, Sign/Signal/Streets Division Public Works January 4, 2001 Walk-thru Coppell Rd. Project 1/3/01 Seal joints where asphalt meets concrete paving on both ends of Coppall Rd. Cut out and repair bad spots in asphalt marked with white paint. Cut out and repair broken concrete in expannion joints marked white. Rout and seal all random cracks painted white. Level up valve stacks and the boxed out area at them. Repair broken curbs painted white. Replace minsing 30mph signs halfway between Eastwick and Minyard on both sides of Coppeli Rd. 8. Clean and f'dl joints all the way to the top. 9. Seal curb joints. 10. Replace reflector buttons miasing from centerline of road. 11. Move Adopt-A-Location signs across Coppell Rd. facing south bound. 12. Make sure all signs are in concrete base 2' deep with break-aways. 13. Cut out and replace low area south bound at Parkway painted white. 14. Fix broken areas where new paving meets old paving in all intersection. 15. Storm sewer manhole at Westminater Dr. needs to be boxed in like the other one is. 16. Clean up concrete spill at The Man~ons. 17. Clean and repair mud ball holes between 90 deg. Turn and Hwy. 121. 18. Pour concrete pads at traffic signal boxes at Parkway Blvd. 19. Install Right Turn Only (30" X 36") sign for Parkway. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector Eo~neering Larry Morton, Sign/Signal/Streets Division Public Works January 4, 2001 Walk-thru Coppell Rd. Project 1/3/01 Pavin_e 2. 3. 4. 5. 6. 7. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Seal joints where asphalt meets concrete paving on both ends of Coppell Rd. Cut out and repair bad spats in asphalt marked with white paint. Cut out and repair broken concrete in expansion joints marked white. Rout and seal all random cracks painted white. Level up valve stacks and the boxed out area at them. Repair broken curbs painted white. Replace missing 30mph signs halfway between Eastwick and Minyard on both sides of Coppell Rd. Clean and ~l joints all the way to the top. Seal curb joints. Replace reflector buttons mi~ing from centerline of road. Move Adopt-A-Location signs across CoppeH Rd. facing south bound. Make sure all signs are in concrete base 2' deep with break-aways. Cut out and replace low area south bound at Parkway painted white. Fix broken areas where new paving meets old paving in aH intersection. Storm sewer manhole at Westmln~ter Dr. needs to be boxed in like the other one is. Clean up concrete spill at The Mansions. Clean and repair mud ball holes between 90 deg. Turn and Hwy. 121. Pour concrete pads at traffic signal boxes at Parkway Blvd. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 01~/01 15:40 ID--CITY OF COPPELL DATE S,R-TIME DISTANT STATION ID MODE P~GES 00'25" CITY OF COPPELL CALLING 01 RESULT OK 0000