ST9801-CS010104 (2) MF, MORANDUM
FROM THF
DEPARTMENT OF PUBLIC WORKS
To.'
From:
Date:
RE:
Larry Davis, Construction lnnpector Engineering
Larry Morton, Sign/Signal/Streets Division Public Works
January 4, 2001
Walk-thru Coppeli Rd. Project 1/3/01
1. Seal joints where asphalt meets concrete paving on both ends of Coppeli Rd.
2. Cut out and repair bad spots in asphalt marked with white paint.
3. Cut out and repair broken concrete in expansion joints marked white.
4. Rout and seal all random cracks painted white.
5. Level up valve stacks and the boxed out area at them.
6. Repair broken curbs painted white.
7. Replace missing 30mph signs halfway between Fastwick and Minyard on both sides
of Coppell Rd.
8. Clean and f'dl joints all the way to the top.
9. Seal curb joints.
10. Replace reflector buttons missing from eenterline of road.
11. Move Adopt-A-Location signs across Coppell Rd. facing south bound.
12. Make sure all si~t,n,~ are in concrete base 2' deep with break-aways.
13. Cut out and replace low area south bound at Parkway painted white.
14. Fix broken areas where new paving meets old paving in all intersection.
15. Storm sewer manhole at Westmin~er Dr. needs to be boxed in like the other one is.
16. Clean up concrete spill at The Man~ions.
17. Clean and repair mud ball holes between 90 deg. Turn and Hwy. 121.
18. Pour concrete pads at traffic signal boxes at Parkway Blvd.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
/'-?-o I
MESSAGE
CONF I RMAT I ON
01~01 12:27
ID=CITY DF COPPELL
DATE
01/84
S,R-TIME DISTANT STATION ID MODE PAGES
00'~5" CITY OF COPPELL CPi. LING 01
RESULT
OK 0000