Loading...
ST9801-CS010104 (3) MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS From: Date: RE: Larry Davis, Construction Inspector Engineering Danny Hightower, Utilities Division Public Works January 4, 2001 Walk-thru Coppell Rd. Project ST98-01 Utilities 1. Valve bad or stub out not holding at first stub out north of Sandy Lake Rd. 2. Air valve too low; raise to ground level one air valve north of Sandy Lake Rd. 3. Valve bad or stub out plug not holding on 2"d stub out north of Sandy Lake Rd. 4. Paint F.H. lid red. 5. Paint MLV lid blue. 6. Paint on curb in blue (MLV) on 16" valve on Parkway. 7. Mark in blue on curb (B.O.) at meter can on Parkway. 8. B.O. valve needs extension to raise to 4' from ground at bridge. 9. F.H. north of bridge leaking-- needs repair. 10. Mark on curb (W.S.) 2 water services north of bridge in blue. 11. Mark in red manholes north and south of Canyon. 12. Clean out meter can at air valve and repair. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONFIRMATION 01~0~/01 Og:~l ID=CITY OF COPPELL DATE 01/0~ S,R-TIME DISTANT STATION ID MODE PAGES 88~40" CITY OF COPPELL CALLING 02 RESULT OK 8808