ST9801-CS010104 (3) MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
January 4, 2001
Walk-thru Coppell Rd. Project ST98-01
Utilities
1. Valve bad or stub out not holding at first stub out north of Sandy Lake Rd.
2. Air valve too low; raise to ground level one air valve north of Sandy Lake Rd.
3. Valve bad or stub out plug not holding on 2"d stub out north of Sandy Lake Rd.
4. Paint F.H. lid red.
5. Paint MLV lid blue.
6. Paint on curb in blue (MLV) on 16" valve on Parkway.
7. Mark in blue on curb (B.O.) at meter can on Parkway.
8. B.O. valve needs extension to raise to 4' from ground at bridge.
9. F.H. north of bridge leaking-- needs repair.
10. Mark on curb (W.S.) 2 water services north of bridge in blue.
11. Mark in red manholes north and south of Canyon.
12. Clean out meter can at air valve and repair.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONFIRMATION
01~0~/01 Og:~l
ID=CITY OF COPPELL
DATE
01/0~
S,R-TIME DISTANT STATION ID MODE PAGES
88~40" CITY OF COPPELL CALLING 02
RESULT
OK 8808