ST9801-CS010103 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To'-
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Avery Rodgers, Crewleader Streets Division Public Works
January 3, 2001
Walk-thru Coppell Road Project ST98-01 1/3/01
Drainaee: In]et Boxes Be~innino on South End West Sid~
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Box wouldn't open.
Coppell south of Eastwick east side of road: concrete has been poured through the
joints in the R.C.P. and is obstructing the flow line (picture).
Box north of Eastwick east side of road: joints in R.C.P. leading to box are not
driven home or are no good.
No access into first junction box.
Box on west side adjacent to the other box was frozen shut.
Box north of Minyard east side of street: grout the R.C.P. at the box; joints in
R.C.P. leading to the box are bad.
Box adjacent on the east side needs grout at the throat and'the joints leading to the
box are bad (picture).
Box just south of Parkway Blvd. east side of street: R.C.P.'s leading to junction box
are in bad shape.
West side grout joints.
Remove silt/mud; 6 X 9 box culvert on the southwest end has an R.C.P. joint about
60 feet up that is in bad shape (something obstructing flow line).
Big 90" R.C.P. on north Coppell Rd. under the big turn, small R.C.P. on south end
first joint up is bad.
Same big pipe small R.C.P. midway in first joint had water running in through
bottom of joint.
Poor job done on the outflow of big pipe. Re-grout wall and rip-rap (bottom looks
like it will have a short life).
CITY OF COPPELL PUBLIC WORKS DEP~.RTMENT