ST9801-CS 900109COPPELL PUBLIC WORKS
I~I~ORANDU~
January 9, 1990
TO:
FROM:
RE:
Per Birdsall, Street Superintendent
Steve Goram, Director of Public Works
Coppell Road Asphalt Overlay
Fiscal Year 89-90
Per, please use this to follow up with me
tickler dated January 26, 1990.
I have broken each project out separately as
with you.
Please provide me a status for the remainder
to the above reference. Thank you.
on your outstanding
previously discussed
of work as it relates
SGG/sm
DATE:
CITY:
REQUESTED BY:
ROADWAY(S):
ROAD TYPE:
CITY SHARE(0-100):
MAPSCO:
LIMITS
FROM-
TO-
LENGTH (Mi):
LENGTH (Mi):
MATERIALS:
YELLOW PAINT
WHITE PAINT
BEADS
OTHER
MAT'L SUBTOTAL
PAVEMENT MARKING ESTIMATE
12-14-89
COPPELL
MIKE SHARP
COPPELL RD.
B
50 %
SOUTHWE STERN
SANDY LAKE
].3
BR YEL SOL YEL BR WHT SOL WHT
1.3 0.4 0.0 2.6
UNIT QUANT.
UNIF
PRICE
GAL. 17.1 S6.69
GAL. 52.0 6.73
LBS. 552.8 0.17
621.9
COST
S114.40
349.96
93.98
0.00
558.34
LABOR:
CREW-PERSONS HOURS 12.9
OTHER HOURS
FRINGE BENEFITS % CPH S 21%
LABOR SUBTOTAL
7.64
98.56
0.00
20.70
119.25
EQUIPMENT:
STRIPER HOURS 4.3
PICKUP HOURS 4.3
OTHER HOURS
EQUIPMENT SUBTOTAL
20.00
5.00
86.00
21.50
0.00
107.50
TOTAL DIRECT COST
ADMIN. COSTS
TOTAL COST
COST TO CITY
COST TO COUNTY
% TDC S 22.6%
% TC 50%
% TC 50%
785.09
177.43
S962.52
S481.26
S481.26
Sandy Lake
COPPELL
$1MAC OVERLAY ESTIMATE
Road from Denton Tap Road to
Length 3900' @ 2" HMAC
Type "B" Road'
Coppel] Road
3900 X
City's Share 50% Total Cost
24/9 = 10400 X .Il 1144 Tons 2" overlay
229 Tons Level Up
1373 Tons Total
X 16 Mil. es
21968 Ton Mile Haul
Shonlder Work, Labor, Equipment, Materials
& Administrative Fees = 3199.20
HMAC t373 Tons Furnished & Laid @ 20.92
Ton MiNe Haul 21968 X . II = 2416.48
Pavement Marking = 852.31
28,723.16
$ 3,199.20
28,723.16
2,416.48
852.31
$35,191.15
Total cost
Total cost
Labor, Equipment,
Administrattve
ItMAC
Ton Mile Haul
Pavement Marking
Total Cost
to City of Coppell
to Dallas County
Materials &
Fees
$17,595.58
$17,595.58
Exhibit