Loading...
ST9801-CS 900109COPPELL PUBLIC WORKS I~I~ORANDU~ January 9, 1990 TO: FROM: RE: Per Birdsall, Street Superintendent Steve Goram, Director of Public Works Coppell Road Asphalt Overlay Fiscal Year 89-90 Per, please use this to follow up with me tickler dated January 26, 1990. I have broken each project out separately as with you. Please provide me a status for the remainder to the above reference. Thank you. on your outstanding previously discussed of work as it relates SGG/sm DATE: CITY: REQUESTED BY: ROADWAY(S): ROAD TYPE: CITY SHARE(0-100): MAPSCO: LIMITS FROM- TO- LENGTH (Mi): LENGTH (Mi): MATERIALS: YELLOW PAINT WHITE PAINT BEADS OTHER MAT'L SUBTOTAL PAVEMENT MARKING ESTIMATE 12-14-89 COPPELL MIKE SHARP COPPELL RD. B 50 % SOUTHWE STERN SANDY LAKE ].3 BR YEL SOL YEL BR WHT SOL WHT 1.3 0.4 0.0 2.6 UNIT QUANT. UNIF PRICE GAL. 17.1 S6.69 GAL. 52.0 6.73 LBS. 552.8 0.17 621.9 COST S114.40 349.96 93.98 0.00 558.34 LABOR: CREW-PERSONS HOURS 12.9 OTHER HOURS FRINGE BENEFITS % CPH S 21% LABOR SUBTOTAL 7.64 98.56 0.00 20.70 119.25 EQUIPMENT: STRIPER HOURS 4.3 PICKUP HOURS 4.3 OTHER HOURS EQUIPMENT SUBTOTAL 20.00 5.00 86.00 21.50 0.00 107.50 TOTAL DIRECT COST ADMIN. COSTS TOTAL COST COST TO CITY COST TO COUNTY % TDC S 22.6% % TC 50% % TC 50% 785.09 177.43 S962.52 S481.26 S481.26 Sandy Lake COPPELL $1MAC OVERLAY ESTIMATE Road from Denton Tap Road to Length 3900' @ 2" HMAC Type "B" Road' Coppel] Road 3900 X City's Share 50% Total Cost 24/9 = 10400 X .Il 1144 Tons 2" overlay 229 Tons Level Up 1373 Tons Total X 16 Mil. es 21968 Ton Mile Haul Shonlder Work, Labor, Equipment, Materials & Administrative Fees = 3199.20 HMAC t373 Tons Furnished & Laid @ 20.92 Ton MiNe Haul 21968 X . II = 2416.48 Pavement Marking = 852.31 28,723.16 $ 3,199.20 28,723.16 2,416.48 852.31 $35,191.15 Total cost Total cost Labor, Equipment, Administrattve ItMAC Ton Mile Haul Pavement Marking Total Cost to City of Coppell to Dallas County Materials & Fees $17,595.58 $17,595.58 Exhibit