Creekview E21P-CS 940714 COPPELL PUBLIC WORKS FROM, Howard L. Pafford, Utilit~p~t~' Utilities personnel performed a follow-up wa~rough on the above referenced project and the following items remain deficient: 1) Lot 1 - Meter can was run over and needs to be replaced. If setter is damaged, replace it too. 2) 3) Manhole sta. 2+73.12 - Unable to locate. Rainpans need to meet city standard & chimney manhole not located, may need to be installed. seal in 4) Have sewer lines been cleaned & videoed? Please ensure these items get completed prior to any final acceptance or any release getting approved. HLP/dm cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building official WALKTHRU.HLP\CREKVIEW.II 0/' ooe£ -~ COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: March 4, 1994 ~ Larry Davis, Construction Inspector ~\ N Howard L. Pafford, Utilities Superintendent Final Walk-Through of Creek-view II Subdivisio Staff performed a final walk-through of the above referenced subdivision yesterday morning. The following is a list of deficiencies found on this project: 1.q~YMeter can run over and crushed at Lot 1. Replace meter can and repair or replace _oetter and copper if damaged. 11 meter services a testable double check device in a separate meter can as required mmercial development. ~(~~- There is no water service, end valve, or 2" blow off. Has water line been / ~ installed? 4. 8" sewer tie in at Sra. 0+0.0 - Pipe needs to be grouted and invert fixed to allow proper drainage of line into existing sewer line. Manhole connection should have .~been core drillerl,~Due to the fact that the manhole was broken out, a concrete sealer ~e interior ~ thc connect~u, ~f'YManhole at Sra. 2+73.12 - Unable to locate. installed manholes need rainpans according to City specifications. lines need to be videoed and cleaned. side of Bethel Road - Water service and sewer service need uncovered and sewer service needs to show proof of installation (meter with separate /ouble check). ~.~ Fire hydrant street indicator or blne dot placed on street. L'~ c"~:~( ~ lO.~J C/~l~manholes, meter can valves need to be staked to mark their locations. /L Based/on staff's findings, this walk-through should have been conducted at a much earlier date; however, no formal notice of a scheduled walk-through was received by this division. I will also mention that based on the procedures used to perform these installations, the construction inspection process of this project should have been monitored more closely. Please notify the utility contractor of the deficiencies and notify this division when a follow- up walk-through is necessary. I would expect these deficiencies to be corrected in a timely manner due to the fact that construction is already taking place on one of these lots. HLP/dm WALKTHRU.HLP/CREEKVU