Creekview E21P-CS 930823 (2)COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROW :
RE:
The following
project.
August 23, 1993
Mike Martin, Graduate Engineer
~..,-~eFen G'~/ Goram, Diector of Public Works
{f~evelopment Fees for Creekview Estates II
fees should be assessed on the above
referenced
Water Impact Fee:
3 %" x ~"
1 - %" x ~"
Domestic Meter/s = 3 ESU's
Irrigation Meter/s = ~ ESU's
Total 4 ESU's @ $650.00 ea = $2.600.00
100% due prior to Council approval of final plat.
Wastewater Impact {city)
3 - %" x ~" Residential meters = 3 ESU's
Total 3 ESU's ~ $450.00 ea = S1.350.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections @ $100.00 each = $ 400.00
100% due prior to issuance of building permit. (or in the case of
the irrigation meter-prior to issuance of meter).
100% due prior to issuance of building permit.
Utility Final Inspection Fee
3 lots @ $50.00/lot = $150.00
100% due prior issuance of building permit.
Water Meter Fee
- %" x %"
Development Fees
Page 2
(Lots)
Domestic Meters @ ._~ = $66.75
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
~" x ~" Irrigation Meters ~ $22.25 ea = S22.25
1" Irrigation Meter ~ 562.10 ea = 562.10
Total = $84.35
100% due prior to issuance of water meters.
Water Meter Deposit Commercial
Residential - meters ~ 535.00 ea = 5105.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
1 - ~" meters @ 535.00 ea = $
Total = $
100% due prior to issuance of water meters.
CREEKVII .HLP