Loading...
Creekview E21P-CS 930823 (2)COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROW : RE: The following project. August 23, 1993 Mike Martin, Graduate Engineer ~..,-~eFen G'~/ Goram, Diector of Public Works {f~evelopment Fees for Creekview Estates II fees should be assessed on the above referenced Water Impact Fee: 3 %" x ~" 1 - %" x ~" Domestic Meter/s = 3 ESU's Irrigation Meter/s = ~ ESU's Total 4 ESU's @ $650.00 ea = $2.600.00 100% due prior to Council approval of final plat. Wastewater Impact {city) 3 - %" x ~" Residential meters = 3 ESU's Total 3 ESU's ~ $450.00 ea = S1.350.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $ 400.00 100% due prior to issuance of building permit. (or in the case of the irrigation meter-prior to issuance of meter). 100% due prior to issuance of building permit. Utility Final Inspection Fee 3 lots @ $50.00/lot = $150.00 100% due prior issuance of building permit. Water Meter Fee - %" x %" Development Fees Page 2 (Lots) Domestic Meters @ ._~ = $66.75 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) ~" x ~" Irrigation Meters ~ $22.25 ea = S22.25 1" Irrigation Meter ~ 562.10 ea = 562.10 Total = $84.35 100% due prior to issuance of water meters. Water Meter Deposit Commercial Residential - meters ~ 535.00 ea = 5105.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 1 - ~" meters @ 535.00 ea = $ Total = $ 100% due prior to issuance of water meters. CREEKVII .HLP