Attached are two sets of revised plans, your mark ups and a copy of your comment letter dated Iviny 12, 1992.
The following relates to the comment numbers from your letter:.
Item 6
Thc side slopes are not gr~_~: They arc concrete rip-rap.
Item 11
We have been p _roce~___ing based on the belief that we had raft's acceptance of out open channel design
con~cpt. If we are mistaken, please let us know as soon as possible. Note that we have ad]nsted the headwall
for I Jmo"~.
Items 14. 16 and 20
Note that the elevations shown on our grading plan are for Finished Pad, not Finished Floor.
Item 15
We agree that a retaining wall will be required. It is our intent to leave the construction of this wall up to the
builder and his architect.
Item 22
We ate proceeding with our effor~ to have this wall designed. We request that this not be a part of the
subdlvision's construction plans for public improvements, but be treated as a separate issue. The reason for
thiK request is that public improvements for County Estates need to be done in an integral runner with
Omutauqua and Bethel School/Harris Street which are already under construction. We hope to not bold up
consmtction, awaiting a resolution of the wall issue.
Please let me know if we need to discuss any of these issues.
Sincerely,
NATHAN D MAIER