Loading...
Country Estates-CS 920518 NATHAN D. MAIER CONSULTING ENGINEERS, INC. Mr. ICen Ortmn: P.E. aP/of Coppell 255 Putk~ay Blvd. Coppell, TX 7~019 Engineering Attached are two sets of revised plans, your mark ups and a copy of your comment letter dated Iviny 12, 1992. The following relates to the comment numbers from your letter:. Item 6 Thc side slopes are not gr~_~: They arc concrete rip-rap. Item 11 We have been p _roce~___ing based on the belief that we had raft's acceptance of out open channel design con~cpt. If we are mistaken, please let us know as soon as possible. Note that we have ad]nsted the headwall for I Jmo"~. Items 14. 16 and 20 Note that the elevations shown on our grading plan are for Finished Pad, not Finished Floor. Item 15 We agree that a retaining wall will be required. It is our intent to leave the construction of this wall up to the builder and his architect. Item 22 We ate proceeding with our effor~ to have this wall designed. We request that this not be a part of the subdlvision's construction plans for public improvements, but be treated as a separate issue. The reason for thiK request is that public improvements for County Estates need to be done in an integral runner with Omutauqua and Bethel School/Harris Street which are already under construction. We hope to not bold up consmtction, awaiting a resolution of the wall issue. Please let me know if we need to discuss any of these issues. Sincerely, NATHAN D MAIER CONSULTIN[G ENGINEERS, INC.. Three NorthPark/8800 N. Central Expwy./Suite 300/Dali&s, Texas 75231/(214) 739-4741