Loading...
ST9302-LR 991013ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 ~q- q'% 07__ REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 10/1319cj PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-90A TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDE PTH'"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 231 10/13/99 FG 1L 22.2 94.7 17.8 112 118 3-BC 232 10/13/99 FG 1 L 22.2 94.7 17.0 116 122 3-BC 233 10/13/99 FG 1L 22.2 94.7 25.0 102 108 3-B 234 10/13/99 FG 1L 22.2 94.7 17.9 109 115 3-BC 235 10/13/99 FG 1L 22.2 94.7 19.7 120 127 3-BC 236 10/13/99 FG 1 L 22.2 94.7 17.5 116 122 3-BC 237 10/13/99 FG 1 L 22.2 94.7 23.2 108 114 3-B TEST LOCATION: 231 SANDY LAKE ROAD WEST BOUND AT STATION #19+00 NORTH CURB LINE 232 SANDY LAKE ROAD WEST BOUND AT STATION #19+50 CENTERLINE 233 SANDY LAKE ROAD WEST BOUND AT STATION #20+75 SOUTH CURB LINE 234 SANDY LAKE ROAD WEST BOUND AT STATION #23+00 NORTH CURB LINE 235 SANDY LAKE ROAD WEST BOUND AT STATION #23+50 CENTER LINE 236 SANDY LAKE ROAD WEST BOUND AT STATION #24+00 SOUTH CURB LINE 237 SANDY LAKE ROAD WEST BOUND AT STATION #29+00 NORTH CURB LINE ~ A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 1. FILL 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Resp~ 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENTTREATED D. RETEST G, INC. Geotechnical E~ · C~ Matedals Testing · Environmental Engineeflng · Consultk~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 MECHANICAL STABILIZATION / MODIFICATION FINAL MIX TESTED FOR: CITY OF COPPELL COPPELL, TEXAS DATE: 10/13/99 PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO: 98881-90C AREA OF WORK: DATE CEMENT [ ] LIME [ XI INITIALLY APPLIED 10/10/99 DATE OF FINAL MIXING: 10/12/99 SAMPLE LOCATIONS: SANDY LAKE ROAD WEST BOUND AVERAGE FINAL COMPA(~ED DEPTH: 8 INCHES 1. SANDY LAKE ROAD WEST BOUND AT STATION #31+50 2. SANDY LAKE ROAD WEST BOUND AT STATION #35+00 3. SANDY LAKE ROAD WEST BOUND AT STATION #37+50 4. SANDY LAKE ROAD WEST BOUND AT STATION g41+50 100% PASSING 60% PASSING 1 3/4" SIEVE # 4 SIEVE 100% 60% 100% 61% ' 100% 61% 100% 63% REMARKS: Geotechnical Engineering · Construction Materials Te~ng · Environmental Engineering · Consu#1ng ALPHA TESTING, INC. 2209 Wisconsin St., Suite t00 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 10/13/99 PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-90B TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 238 10/13~99 FG 1L 22.2 94.7 22.9 106 112 3-B 239 10/13/99 FG 1L 22.2 94.7 21.4 107 113 3-BC 240 10/13/99 FG 1 L 22.2 94.7 20.1 99 104 3-BC 241 10/13/99 FG 1L 22.2 94.7 27.7 104 110 3-BC 242 10/13/99 FG 1L 22.2 94.7 25.2 102 107 3-B 243 10/13/99 FG 1L 22.2 94.7 26.0 104 110 3-B TEST LOCATION: 238 SANDY LAKE ROAD WEST BOUND AT STATION #29+50 CENTER LINE 239 SANDY LAKE ROAD WEST BOUND AT STATION #30+00 SOUTH CURB LINE 240 SANDY LAKE ROAD WEST BOUND AT STATION #32+00 NORTH CURB LINE 241 SANDY LAKE ROAD WEST BOUND AT STATION #33+00 CENTER LINE 242 SANDY LAKE ROAD WEST BOUND AT STATION #34+00 SOUTH CURB LINE 243 SANDY LAKE ROAD WEST BOUND AT STATION #35+00 NORTH CURB LINE 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: CITY OF COPPELL COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS DATE: 10/13/99 OUR REPORT NO: 98881-90 TECHNICIAN: P.M. WEATHER: CLEAR TEMPERATURE RANGE: 60 TO 75 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SANDY LAKE ROAD AT STATION #32+00 WEST BOUND A TOTAL OF 13 FIELD DENSITY TESTS WERE PERFORMED ON STABILIZED SOIL FOR PAVING. SEE ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING. WHILE ON SITE THE TECHNICIAN PERFORMED 4 FIELD GRADATION TESTS ON LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS. ~BORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. GARRETH CAMPBELL WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Respectfully Submitted, Geotechnical Eng~3eefing · Construction Materials Testing · Environmental Engineering · Consulting