Loading...
Denton Tap 1A-LR051020~ ECS- Texas LLP 4950 Keller Springs Road, Suite Addison, TX 75001 (972) 392-3222 ~ - _ (FAX) 392-0102 October 20, 2005 Little Diversified Arch. Consulting 5001 Spring Valley Road, Suite 282-W Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse LETTER OF TRANSMITT AL RE: Wachovia - CoppeH ECS Job # 19:4236-A 'ermits: ~ocation: 131 N. Denton Tapp Road Coppeli, TX We are enclosing: X Materials Engineering Division Reports X For your use X . As requested CC: Centex Construction Co. - Claud Boiton Centex Construction Co. - Robert Boe Wachovla Corporate Real Estate - Ken Clausen Little Dive,ired Arch. ConsuRants - Philip F. Ritehie City of Coppell - Lee Stone City of Coppell - Larry Davis ENCL: Field Report # 12 10/19/2005 Daniel Franklin, P.E. President/Principal ENgineer J~h~Al[e~, SET ~Construction Services Manager ECS - Texas, LLP 4950 Keller Sprlng~ Road, Sull~ 480 Addison, TX 75001 (972) 392.~222 (FAX) 3924)102 Projec~ Wachovia - Coppell Locatio~ Coppeli, TX Client Little Diversified Arch. Consulting - Y~thryn E. Rabuse Contractor Centex Construction Co. - Claud BoRon Remarks Tdp Charges* Cha~geable Items Toils/Parking* Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 12 Day & Date Wednesday 10/19/2005 Weather 85°/Sunny On-Site Time 9.50 Lab Time 0.25 Travel Time* 1.00 Tota~ 10.75 Re Obs.'Rme 0.00 Time of Arrival Departure 07:00A 04:30P * Travel time and mileage will be billed in accordance with the contract. g,. ;..rr, i6d (field test data, Iocalons, eie.&~'.oaa & depths am e.;.;,,,.;,,&} & Indlvlduala C,...~,~.~d. Drilled Pier Observation: The undersigned arrived on site, as requested, to observe the drilled pier operation. The drilled pier excavations observed on this date appeared to be in accordance with project drawings and specifications with regard to plumbness, diameter, required depth and required penetration. The piers were cased due to the infiltration of water. The reinforcing steel for the drilled shales was verified on this date, and appeared to be placed in accordance with project drawing and specifications. Concrete observed on this date appeared to be in compliance with project specifications with regard to slump, temperature, batch to placement time, and placement method. I set of 4 cylinders was cast for compressive strength testing in our laboratory. 1700 By Louis DeRossi 70717 REPORT OF STRAIGHT SHAFT PIER OBSERVATIONS Project: Waehovia - Coppell Report ii: Contractor: Allied Drilling Project #: Technician: L. DeRossi Date: Page: 12 4236-A 10/19/05 1 ofl Building #: Beating Strata: Gray Limestone Shaft Required Actual Depth to Final Depth Pier ID Diameter 'enetration Penetration Beating Depth of Remarks (Location) (in.) (ft.) (ft.) (ft.) (ft.) Casing F_JI0 18 4 4.4 22.4 26.8 22.0 F/10 18 4 5.3 21.5 26.8 21.0 C.7/7.6 18 4 4.0 21.0 25.0 20.2 C.7/6.7 18 4 5.1 20.5 25.6 20.0 D/9 18 4 4.4 20.9 25.3 20.5 D/6 18 4 4.6 21.0 25.6 20.9 D.5/7.6 18 4 4.7 21.5 26.2 21.0 D.5/6.7 18 4 4.4 21.0 25.4 20.5 O/$ 18 4 4.4 22.0 26.4 21.5 H/7 18 4 4.3 20.1 24.4 20.0 B/5 30 4 5.9 15.7 21.6 15.0 NOTE: Reinforcing was in compliance with spe , REPORT OF STRAIGHT SHAFT PIER OBSERVATIONS Project: Wachovia - Coppell Report #: 13 Contractor: Allied Drilling Project #: 4236-A Technician: L. DeRossi Date: 10/20/05 Page: 1 of 1 Building #: Bearing Strata: Gray Shale Shaft Required Actual Depth to Final Depth Pier ID Diameter Penetration Penetration Bearing Depth of Remarks (Location) (in.) (ft.) (ft.) (ft.) (ft.) Casing 3/3 30 4 4.6 18.4 23.0 16.5 B/3 30 4 4.2 18.7 22.9 16.5 A/5 30 4 4.8 17.2 22.0 16.0 J/7 18 4 4.5 22.4 26.9 21.5 NOTE: Reinforcing was in compliance with specifications, unless otherwise noted. ECS - Texas, LLP 4950 Keller Sprlng~ Road, Suite 480 Addison. TX 75001 (972) 392~222 (FAX) 392-0102 Project Wachovia - Coppell Locatio~ Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Chargeable Items Tolls/Parking* Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 1,3 Day & Date Thursday 10/20/2005 WeaNer 75°/Sunny On-Site Time 6.50 Lab Time 0.25 Travel Time* 1.00 Total 7.75 Re Obs.'~me 0.00 Time of Arrival Departure 07:00A 01:30P * Travel time and mileage will be billed in accordance with the contract. Summary of Servicua Performed (field test data, Iocalons, ele~afions & depths am uatlmak)s) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the straight-sided drilled shaR construction operations at A3, A/5, B/3 and J/7. Please see the attached drilled shaft records for details. The drilled shaft excavations observed on this date appeared to be in accordance with project drawings and specifications with regard to plumbness, location (by others), diameter, required depth and required strata penetration. The shafts were cased due to water infiltration. The reinforcing steel for the drilled shafts was observed on this date, and appeared to be placed in accordance with the project drawing and specifications with respect to size, number, length, and circular ties. Concrete observed on this date appeared to be in compliance with project specifications with regard to slump, temperature, batch to placement time, and placement method. 1 set of 4 cylinders was cast for compressive strength testing in our laboratory. By Louis DeRossi 1700 70718