Copperstone-CS 96082008/20/96 11:08 CITY OF COPPELL EHGIHEERIHG * SERUICE CENTER H0.722 D02
DEVELOPMENT FEES TABLE
Projoct: Copperstone
Dat~e: 8/20/96
· TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Wate, r Impact Fee $2.250.00 $2,250.00
(100% due prior to ,Council Approval)
'~,~i~r Tap Inspection Fee $50,00
(100% duc at Iss,3~nc-c of Water Meter)
$o.oo
Water Meter Fee (Domestic) ~
,(100% due at Iss-anee of Water Meter)
n/Fi
Wa~r M,~tcr Fee (Irrigatio reline) $134,93
(100% due at Iss,,~acc of Water Met, er)
"~;~t~r Meter Deposit (Domestic) $0.00 ,
(100% due at IssuanCe of Water Meter)
Ir~igation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wa~tewater Impact Fee $0.00 $0.00
(100% due prior, to Council A. pproval) --
'~l~tewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Perm!0
-----, $o.oo
Utility Final Inspection Fee
(100% due at Iss,!snee Of Buildin~ Permit)
Park Fee #N/A #N/A
, .(100% due prior to Council Approval).
~:~lwaY Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Information not ~
Sixe~t Light Fee
(100% du~ prior to Accep..~.ce of Pro'~c_,~ available at this tim_.~._e ~
~ Information not
S~ct Sign Fee
(100 % due prior to Ace~tance of P[oject available at this time
'~mstruction Inspection Fee Need submittal of
i de.v_elopment contracts ~
~ ~$2,469.9
.~ , " $2,250.00
..~OTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
08/20/96 11:08 CITY OF COPPELL ENGINEERING ~ SERUICE ~ENTER N0.722 D03
DEVELOPMENT FEE WORKSHEET
PROJ~!CT: Copperstone
DATE!: 8/20/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s}:
Fireline Meter(s}:
0 FALSE
1 -1 112 inch
0 - N/A =
Total #: 5 ESU's @ $450.00 es.
(100% due prier to Council approval of the finsl plat}
Wate~ Tap Inspection Fee:
Total #: 1 Connections ~ $50.00 ea.
ISingle family due prior to issuance of building permit)
(AIl other developments due prior to issuance of meter)
Watec Meter Fee (Domestic):
ToTal #: 0 Domestic Meter(s} @
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #; 1 Irrigation Meter(s} @
Total 8: 0 Additional Irrigation Meter{s) ~
Total #: - 0 Firel[ne Metsr(s) @
(100% due prior to issuance of water meters}
Meter Deposit Fee (Domestic):
Tota~ #: 0 Meter(s) @ 930.00 ea.
{100% due prior to issuance of water meters}
Irrigation/Fire Meter Deposit Fee:
Total #: I Meter(s) ~) $35.00
(100% due prior to issuance of water meters)
ESU's
ESU's
ESU's
ESU's
9134.93
92,250.00
90.00
9134.93 ._
$0,00
90,00
$0.00
935.00
Wastewater Impact Fee:
Total Domestic Meters ESU'__ ,
@$450.00 ea.
W:~ewater Tap [uspection Feet
Total #: 0 Connections @ $50.00 ea.
{100% due prior'to issuance of building permit}
Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 es.
(100% due pr[or to issuance of building permit)
$0.OO
90.00
90.00
Page 1
08/20×96 11:08 CITY OF COPPELL ENGINEERING ~ SERUICE CENTER N0.722
DEVELOPMENT FEE WORKSHEET
Park ]Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
#N/A
#NIA
Single-family ~ $150,00 / Lot
Multi-famiiy @ $75,00 i Unit
(50% paid prior to Council approval of final plat)
1'50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
#NIA
#N/A
Single-family @ $350,00 / Lot
Mu)ti-family @ $$50.00 I Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
#NIA
#N/A
Single-family @ $1285.00 / Lot
, Mu)ti-family @ $1285,00 / Unit
1100% paid prior to Council approval of final platl
Roadway Impact Fee:
(See attached fee calculations)
Stree! Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292,~0 per light will be assessed.
{100% due prior to final acceptance of development)
#NIA
#NIA
#N/A
#N/A
#NIA
#NtA
$0.00
I~formatioe not
available at this time
Str~ Sign Fees:
Assessed for signage in the City's right-of-way.
(Sea attached fee calculations if applicable)
Information not
available at this time
Cox~itruction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that ara inspected by the Engineering Department. ~
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submits[ of
~evelopmenI conuacts
Page 2
2593
COPPERSTONE, LTD. 11-95
8300 DOUGLAS AVE,, NO. 800 214-706-9190
Received
Address
~a,e '~- -~° .,9 _~..¢~, 0031235
L-TO :
Dollars
214 304 35?0
08×2~×96 11:07 CIT~OF COPPELL ENGINEERING ~ SERUICF ~NTER N0.722 D01
ENGINEERING DEPARTMENT
FAX CO VER SHEET
80X 478
PARKWAY BLVD.
¢OPP~J., TX
FIRM:
FAX NO:
TRANSMITTED BY:
NUMBER OF PAOES
{
REMARKS:
PHONE NO,:,,
DA~i~:
COVER SHEET)
IF YOU
PAGES,
DO NOT RECEIVE ALL OF' THE
PLEASE: CALL (214.) 504.-5679.