Loading...
Copperstone-CS 96082008/20/96 11:08 CITY OF COPPELL EHGIHEERIHG * SERUICE CENTER H0.722 D02 DEVELOPMENT FEES TABLE Projoct: Copperstone Dat~e: 8/20/96 · TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Wate, r Impact Fee $2.250.00 $2,250.00 (100% due prior to ,Council Approval) '~,~i~r Tap Inspection Fee $50,00 (100% duc at Iss,3~nc-c of Water Meter) $o.oo Water Meter Fee (Domestic) ~ ,(100% due at Iss-anee of Water Meter) n/Fi Wa~r M,~tcr Fee (Irrigatio reline) $134,93 (100% due at Iss,,~acc of Water Met, er) "~;~t~r Meter Deposit (Domestic) $0.00 , (100% due at IssuanCe of Water Meter) Ir~igation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wa~tewater Impact Fee $0.00 $0.00 (100% due prior, to Council A. pproval) -- '~l~tewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Perm!0 -----, $o.oo Utility Final Inspection Fee (100% due at Iss,!snee Of Buildin~ Permit) Park Fee #N/A #N/A , .(100% due prior to Council Approval). ~:~lwaY Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Information not ~ Sixe~t Light Fee (100% du~ prior to Accep..~.ce of Pro'~c_,~ available at this tim_.~._e ~ ~ Information not S~ct Sign Fee (100 % due prior to Ace~tance of P[oject available at this time '~mstruction Inspection Fee Need submittal of i de.v_elopment contracts ~ ~ ~$2,469.9 .~ , " $2,250.00 ..~OTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL 08/20/96 11:08 CITY OF COPPELL ENGINEERING ~ SERUICE ~ENTER N0.722 D03 DEVELOPMENT FEE WORKSHEET PROJ~!CT: Copperstone DATE!: 8/20/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s}: Fireline Meter(s}: 0 FALSE 1 -1 112 inch 0 - N/A = Total #: 5 ESU's @ $450.00 es. (100% due prier to Council approval of the finsl plat} Wate~ Tap Inspection Fee: Total #: 1 Connections ~ $50.00 ea. ISingle family due prior to issuance of building permit) (AIl other developments due prior to issuance of meter) Watec Meter Fee (Domestic): ToTal #: 0 Domestic Meter(s} @ (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #; 1 Irrigation Meter(s} @ Total 8: 0 Additional Irrigation Meter{s) ~ Total #: - 0 Firel[ne Metsr(s) @ (100% due prior to issuance of water meters} Meter Deposit Fee (Domestic): Tota~ #: 0 Meter(s) @ 930.00 ea. {100% due prior to issuance of water meters} Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) ~) $35.00 (100% due prior to issuance of water meters) ESU's ESU's ESU's ESU's 9134.93 92,250.00 90.00 9134.93 ._ $0,00 90,00 $0.00 935.00 Wastewater Impact Fee: Total Domestic Meters ESU'__ , @$450.00 ea. W:~ewater Tap [uspection Feet Total #: 0 Connections @ $50.00 ea. {100% due prior'to issuance of building permit} Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 es. (100% due pr[or to issuance of building permit) $0.OO 90.00 90.00 Page 1 08/20×96 11:08 CITY OF COPPELL ENGINEERING ~ SERUICE CENTER N0.722 DEVELOPMENT FEE WORKSHEET Park ]Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: #N/A #NIA Single-family ~ $150,00 / Lot Multi-famiiy @ $75,00 i Unit (50% paid prior to Council approval of final plat) 1'50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: #NIA #N/A Single-family @ $350,00 / Lot Mu)ti-family @ $$50.00 I Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: #NIA #N/A Single-family @ $1285.00 / Lot , Mu)ti-family @ $1285,00 / Unit 1100% paid prior to Council approval of final platl Roadway Impact Fee: (See attached fee calculations) Stree! Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292,~0 per light will be assessed. {100% due prior to final acceptance of development) #NIA #NIA #N/A #N/A #NIA #NtA $0.00 I~formatioe not available at this time Str~ Sign Fees: Assessed for signage in the City's right-of-way. (Sea attached fee calculations if applicable) Information not available at this time Cox~itruction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that ara inspected by the Engineering Department. ~ (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submits[ of ~evelopmenI conuacts Page 2 2593 COPPERSTONE, LTD. 11-95 8300 DOUGLAS AVE,, NO. 800 214-706-9190 Received Address ~a,e '~- -~° .,9 _~..¢~, 0031235 L-TO : Dollars 214 304 35?0 08×2~×96 11:07 CIT~OF COPPELL ENGINEERING ~ SERUICF ~NTER N0.722 D01 ENGINEERING DEPARTMENT FAX CO VER SHEET 80X 478 PARKWAY BLVD. ¢OPP~J., TX FIRM: FAX NO: TRANSMITTED BY: NUMBER OF PAOES { REMARKS: PHONE NO,:,, DA~i~: COVER SHEET) IF YOU PAGES, DO NOT RECEIVE ALL OF' THE PLEASE: CALL (214.) 504.-5679.