Copperstone-CS 960816~ CO ERSTONE, LTD. ,,-95 2590
8300 DOUGLAS AVE,, NO. 800 214-706-9190
~<i DALLAS. TX ,,,,,
~ ,< PAY - ~ .19e~ 3
~Z - '
Address.
' Dollars
Coppertone
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAls.
Water Impact Fee $64,800.00 $64,800.00
(100% due prior to Council Approval)
Water Tap Inspection Fee ( ~,. ',~¢,)fa/~o.- ,.,-.rico, s) ~ -0-
(100% due at Issuance of Water Meter) '~OO .00
Wastewater Impact Fee $58,050.00 $58,050.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $12,900.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $6,450.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $2,870.25 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) $3,870.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) $387.15 -0--
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit $105.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee $22,869.95 $22,869.95
Street Escrow -0- -0-
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $ 185,502.35
$145,719.95
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
Utility Final ~nspoctlon Fee (~11 Development)
~ lots ~ ~$ $0,00/1Q~ . ~
100% due prior to issuance of building permit.
W~ter Meter Fee (Domestic)
~ -..$/8" x 3/4,, Domestic Meters
100% due prior to ismuance of building ~rmit for residential only.
Ail other development fesm are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Firelins)
'"~ 3 -. 1 1/2" Irrigation Meter/s ~ ~ m_~L~_~L~_
- - .... Fireline Meter/s @ $., e~ ~ . $
Total
100% due pri~r to issuance of water meter/s.
Water Meter Deposit (mUlti-F~mily or Non-Residential)
~129 Meters
100% due prior to issuance of water meters.
Irrigation Meter Deposit
3 Meters ~ .$35,Q0 ea = ~
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat epproval prior to June
23, 1992 the following assessme;~t is determined:
Residential Lots at $1SO,o0 each - $
Units (Multi family) at $75.00 each ~ $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
TO:
RE:
September 11, 1995
Mike Martin, E.I.T.
Howard pafford, utilities Superintendent
Development Fees for copperstone Estates Third Revi~ion
The foll~wing fees
referenced project.
Water Impact Fee:
~ _ ~ Domestic Meter/s
- _ 1 112"
Total ~
100% due prior to Council
should be assessed and collected on the above
= I_!i~ESU'e
Irrigation Meter/s - 15_ESU'a
Fireline Meter/s ~ __ ESU's
ESU'S ~ $450.00 oa ~ ~64.800.0~
approval of the final plat.
Wastewater Impact
~ - _ 5/~" X 3/4" Domestic Meter/s ~ 129_ ESU's
Total _12~ ESU's ~ $450.00 ea= ~
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
$oO93~-_~__ Connections @ $10o.00 each - ~
100% due prior to issuance of building permit for residential. (or in
the case of multi-family, commercial, retail, industrial, fee is due
pri~r t~ ~ssuance of meter).
Sewer Tap Inspection Fee
_~ Connections ~ $1oO.OO each - $/F~_~
100% due prior to issuance of building permit. (Residential only)