Loading...
Copperstone-CS 960816~ CO ERSTONE, LTD. ,,-95 2590 8300 DOUGLAS AVE,, NO. 800 214-706-9190 ~<i DALLAS. TX ,,,,, ~ ,< PAY - ~ .19e~ 3 ~Z - ' Address. ' Dollars Coppertone TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAls. Water Impact Fee $64,800.00 $64,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee ( ~,. ',~¢,)fa/~o.- ,.,-.rico, s) ~ -0- (100% due at Issuance of Water Meter) '~OO .00 Wastewater Impact Fee $58,050.00 $58,050.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $12,900.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $6,450.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $2,870.25 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) $3,870.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $387.15 -0-- (100% due at Issuance of Water Meters) Irrigation Meter Deposit $105.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee $22,869.95 $22,869.95 Street Escrow -0- -0- (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 185,502.35 $145,719.95 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. Utility Final ~nspoctlon Fee (~11 Development) ~ lots ~ ~$ $0,00/1Q~ . ~ 100% due prior to issuance of building permit. W~ter Meter Fee (Domestic) ~ -..$/8" x 3/4,, Domestic Meters 100% due prior to ismuance of building ~rmit for residential only. Ail other development fesm are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Firelins) '"~ 3 -. 1 1/2" Irrigation Meter/s ~ ~ m_~L~_~L~_ - - .... Fireline Meter/s @ $., e~ ~ . $ Total 100% due pri~r to issuance of water meter/s. Water Meter Deposit (mUlti-F~mily or Non-Residential) ~129 Meters 100% due prior to issuance of water meters. Irrigation Meter Deposit 3 Meters ~ .$35,Q0 ea = ~ 100% due prior to issuance of water meters. Park Fee For those developments having preliminary plat epproval prior to June 23, 1992 the following assessme;~t is determined: Residential Lots at $1SO,o0 each - $ Units (Multi family) at $75.00 each ~ $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. TO: RE: September 11, 1995 Mike Martin, E.I.T. Howard pafford, utilities Superintendent Development Fees for copperstone Estates Third Revi~ion The foll~wing fees referenced project. Water Impact Fee: ~ _ ~ Domestic Meter/s - _ 1 112" Total ~ 100% due prior to Council should be assessed and collected on the above = I_!i~ESU'e Irrigation Meter/s - 15_ESU'a Fireline Meter/s ~ __ ESU's ESU'S ~ $450.00 oa ~ ~64.800.0~ approval of the final plat. Wastewater Impact ~ - _ 5/~" X 3/4" Domestic Meter/s ~ 129_ ESU's Total _12~ ESU's ~ $450.00 ea= ~ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee $oO93~-_~__ Connections @ $10o.00 each - ~ 100% due prior to issuance of building permit for residential. (or in the case of multi-family, commercial, retail, industrial, fee is due pri~r t~ ~ssuance of meter). Sewer Tap Inspection Fee _~ Connections ~ $1oO.OO each - $/F~_~ 100% due prior to issuance of building permit. (Residential only)