Loading...
ST9302-LR 991007ALPHA TESTING, INC. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (972) 620-8911 Client: City,of Coppell, Coppell, Texas Project Name: Sandy Lake Road Project, Coppell, Texas 98881-88 10/07/99 Our Report No.: Date: LIGHT BROWN LIME STABILIZED CLAY Soil Classification: I I I I I I i~, SoilI.D. Number: 8 Test Method:_ I II I I I I ~ ~'~ 94.7 I I I I II Ii I I I I ~, ~,~, Maximum Dry Unit Weight: 22.2 I I I I I [ I ~ ~ ~ OptimumMoistumCont~nt: I III [ II Illll[I I I I I I I I ~ ~ S~LELOCATION: S~YL~RO~ AT STA3 Illllll ~ ~ ~ , REPORT OF MOISTURE D IIII I IIIlll IIIIIII IIII1~1 I I I I ~ I I ~ IIIIIII I I I I I I I ~ ~, ~ I IIlll IIItll n ~1~11}1 I~11111 n, ~ltlll~ IIIIII , [ II I [ ~_~ , ~ N SPECIFIC GR, I I ~ I / ~, ~ kN ~2.~ Ill IIIIIII / x IIIIIII IlllllI ~ ~ III ~ IIII II ~ ~ Ill n l Ill I I I I I I 0 5 10 15 20 25 30 35 40 ASTM D-698 pcf % #20+00 IENSITY )IL CURVES TIES OF MOISTURE CONTENT - % CG01083-20 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DALLY FIELD REPORT TESTED FOR: CITY OF COPPELL COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS DATE: 10/07/99 OUR REPORT NO: 98881-87 TECHNICIAN: P.M. WEATHER: CLEAR TEMPERATURE RANGE: 80TO 85 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SANDY LAKE ROAD AT STATION #20+00 WEST BOUND WHILE ON S TE THE TECHNICIAN PERFORMED 5 FIELD GRADATION TESTS ON LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Respectfully Submitted, ~NC. Geotechnical Engineedng · Construction Materiels Testing · Environmental Engineering · Consulting T 'T ''I' T' 1T I ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 MECHANICAL STABILIZATION / MODIFICATION FINAL MIX TESTED FOR: CITY OF COPPELL COPPELL, TEXAS DATE: 10/07/99 PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORTNO: 98881-87 AREA OF WORK: SANDY LAKE ROAD WEST BOUND DATE CEMENT [ ] LIME [ Xi INITIALLY APPLIED 10/04/99 AVERAGE FINAL COMPA{~ED DEPTH: 8 INCHES DATE OF FINAL MIXING: 10/07/99 SAMPLE LOCATIONS: 1. ' SANDY LAKE ROAD WEST BOUND AT STATION #8+00 2. SANDY LAKE ROAD WEST BOUND AT STATION #11+00 3. SANDY LAKE ROAD WEST BOUND AT STATION #14+00 4. SANDY LAKE ROAD WEST BOUND AT STATION #17+00 5. SANDY LAKE ROAD WEST BOUND AT STATION #20+00 100% PASSING 60% PASSING 1 3/4" SIEVE # 4 SIEVE 100% 69.5% 100% 63.5% 100% 66.5% 100% 72.5% 100% 67.25% REMARKS: Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting T I "~' ~ I