Loading...
Copperstone-CS 951114 (2) Coppell, Texas 75019 PUBLIC WORKS November 14, 1995 Jim Briscoe ~ Briscoe Clark Company / / [ Ih ) 8300 Douglas Ave., Suite 800 ~ ,'~.' ~J"-..~// ~,%q~fpment Fee Assessment Dear Mr. Briscoe: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Copperstone. Please make payment to the City of Coppell in the amount of $145,719.95 and forward it to Jennifer Armstrong, Interim Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc: Jennifer Armstrong, Interim Finance Director Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Interim Street Superintendent Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVELOPMENT FEES Date: Project: November 14, 1995 Copperstone TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $64,800.00 $64,800.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $13,200.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee $58,050.00 $58,050.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $12,900.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $6,450.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $2,870.25 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) $3,870.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $387.15 -0- (100 % due at Issuance of Water Meters) Irrigation Meter Deposit $105.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee $22,869.95 $22,869.95 Street Escrow -0- -0- (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2 % of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $185,502.35 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 145,719.95 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. 11×08~95 14:48 001 NE~ORANDU~ DATE; TO: FROW: September 11, 1995 Mike Martin, E.I.T. Howard Pafford, utilities Superintendent Development Fees for CopRerstone Estates Third Revision The foll~wing fees should be assessed and collected on the above refere~Ged project. Water Impact Fee= 129 - _~19~_3~--~-~D°mestic Meter/e ~ - i ~/~" Irrigation Meter/s ~ 15_ ESU's Firelins Neter/s = Total ~ Esu's ~ $450.00 ea - .~64~800.0O 100% due prior to Council approval of the final plat. Wastewater Impact _~ - _ ~/8" x $/~" Domestic Mster/s = ~29. ESU's Total iZ~ ESU's ~ $450.00 ea= ~ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 132 Connections ~ $10o.00 each = ~ 100% due prior to issuance of bulldtng Rermit for residential. (or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee I_~ ConneCtions ~ $1o0.00 each - $~ 100% due prior to issuance of building permit. (Residential only) 11×08×95 14:49 002 ~a~e 2 U~i~tZF~fla~ ~nspe~tion ~ee (~,J.~ D~ve~o~n~) i~glOCS ~ ~ -- ~6.4~0.00 100% due prior ~o tsmuance of building~rmit. Mater Meter Fee (Domestic) lZ~ - . $[8~' X 3/4" Domestic Meters ~ _~=~_~_ ~ ~ 100% due prior to issuance Of building permit for residential only. Ail ocher development fees are due prior to issuance of meter/s. Water Meter Fee 3 - - Fireline Meter/s ~ $ Total 100% due prior ~0 issuance of water meter/$. Water Meter Deposit CWulti-F~mily or Non-Residential) 129 meters ~ 835.00 ea = ~ 100% due prior to issuance of water meters. (Irrigation/Fireline) 1 " = $387.15 ~ Irrigation meter/s ~ ~ Irrigation Hater Deposit $ Meters ~ _~~ = $105.00 100% due prior to issuance of water meterB. For those developments having preliminary pl~t approval prior to June 23, 1992 the following assessment is de~ermaned~ Remidential Lots at $150.00 each Units (multi family) at $75.u0 eauh 50% of the a~ount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining ~hall be paid ~y the Builder at such time as a building permit is issued. Page 3 For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined~ Residential Lots at $$50.00 each .. Units (Multi-Family) at $350.00 each 50% of the amount specified above shall be paid by the Developer prior to Council approval of finel plat. $0% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after october 26, I~$ the following assessment is de~ermined= Residential Lots at $1,285.00 each ... units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Develo~r prior to Council approval of final pla~. Please advise the Developer of these fees and due dates. If yOU have any questions regarding Chess assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $z92.60 per li~t will be assesse~. Street signs Fee see at~ached Street Sign Assessment sheet. 100% due prior to final acceptance of project. l~velolx~n~ Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A. Chapter VIII A. Th~ following cost of those sign materials reguzred are based on c~rrenc pricing which is reviewed on a regular basis. SIG~ ~o parking speed ~imit Yield stop Street Name Stop & Street Combo ~ TE DP COSt breakdown~ may be request. TOTAL obtained from Public Works by written DEVFEES.HLP Revised 5/26/95 COPPERSTONE ESTATES PARK FEE CALCULATIONS Areas Block A, B, C (north of Parkway Blvd.) Block D, E, F (south of Parkway Blvd.) Coppell Streets & Alleys Square Feet 1,254,340 + 727,647 1,981,987 428,408 1,553,579 Block F, Lot 8 Common Area + 438,849 1,992,428 Private (not conveyed to City) As per Univest Agreement at $500 per acre 1,992,428. x $500.00 $ 22,869.95 * Areas calculated by Dowdey, Anderson & Associates COPPERSTONE Coppell, Texas AREA SUMMARY Lot 46, Block A Coppell Dedication Block A, B, C (north of Parkway Blvd. Parkway Boulevard Block D, E, F. (south of Parkway Blvd. Lot 8, Block F Common Area 99,216 s.f. (2.278) ac. 1,254,340 s.f. (28.796) ac. 209,450 s.f. (4.808) ac. 727,647 s.f. (16.705) ac. 438,849 s.f. (10.075 ac) 4-o 5 s.G