Creekview ll L3-CS001113 (2)DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
OR G NATION DATE:
Creek View Phase II, Lot 3R, Block B
Nathan D. Maier
11/13/00
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
L1/14/00
11/14/00
2/4%
11/14/00
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
*Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
$2,700.00
$45O.OO
$2,588.46
$10,723.44
$150.00
$50.00
$26.57
$1,302.12
$35.00
$60.0O
$50.00
Total Fees
$18,135.59
$2,700.00
$45O.OO
notify street dept.
$2,588.46
$10,723.44
$150.00
$50.00
$26.57
$1,302.12
$35.00
$60.00
$50.00
Fees Paid
$18,135.59
11/16/00
11/16/00
12/13/00
11/16/00
12/7/00
12/7/00
12/7/00
12/7/00
12/7/00
12/7/00
12/7/00
Amount Owed
$o.oo
NOTES
~ Roadwaylmpact Fee Assessed:$19,391.40-$8,667.96(credit)= $10,723.44
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.