Loading...
Creekview ll L3-CS001113 (2)DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NATION DATE: Creek View Phase II, Lot 3R, Block B Nathan D. Maier 11/13/00 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE L1/14/00 11/14/00 2/4% 11/14/00 Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection *Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $2,700.00 $45O.OO $2,588.46 $10,723.44 $150.00 $50.00 $26.57 $1,302.12 $35.00 $60.0O $50.00 Total Fees $18,135.59 $2,700.00 $45O.OO notify street dept. $2,588.46 $10,723.44 $150.00 $50.00 $26.57 $1,302.12 $35.00 $60.00 $50.00 Fees Paid $18,135.59 11/16/00 11/16/00 12/13/00 11/16/00 12/7/00 12/7/00 12/7/00 12/7/00 12/7/00 12/7/00 12/7/00 Amount Owed $o.oo NOTES ~ Roadwaylmpact Fee Assessed:$19,391.40-$8,667.96(credit)= $10,723.44 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.