Loading...
Copperstone-CS 950911COPPELL ENGINEERING MEMORANDUM DATE TO: FROM RE: September 11, 1995 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Copperstone Estates Third Revision The following fees should be assessed referenced project. Water Impact Fee: 129 - 5/8" x 3/4" Domestic Meter/s 3 - 1 1/2" Irrigation Meter/s = __ __ - Fireline Meter/s = __ Total 144 100% due prior to Council approval and collected on the above 129 ESU's 15 ESU's ESU's ESU's @ $450.00 ea = $64,800.00 of the final plat. Wastewater Impact 129 - 5/8" x 3/4" Domestic Meter/s = Total 129 ESU's @ $450.00 ea = 129 ESU's $58,050.00 100% due prior to Council approval of the final plat. water Tap Inspection Fee 132 Connections @ $100.00 each = $13,200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 129 Connections @ $100.00 each = $12,900.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (All Development) 129 lots @ $ 50.O0/lot = $6,450.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 129 - 5/8" x 3/4" Domestic Meters @ 22.25 ea. = $2,870.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 3 - 1 1/2" (Irrigation/Fireline) Irrigation Meter/s Fireline Meter/s @ @ $129.05 ea $ ea Total = $387.15 = $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 129 Meters @ $35.00 ea = $3,870.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 3 Meters @ $35.00 ea = $105.00 100% due prior to issuance of water meters. Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Development Fees Page 3 For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN No Parking Speed Limit Yield Stop Street Name Stop & Street Combo UNIT PRICE $53.1o $63.54 $58.56 $65.12 $11.6o $96.85 QUANTITY EXTENDED PRICE OTHER Cost breakdowns may be request. TOTAL obtained from Public Works by written DEVFEES.HLP Revised 5/26/95 CITY OF COPPELL DEVELOPMENT FEES Date: Project: September 11, 1995 Copper Stone Estates TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 64,800.00 64,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee 13,200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 58,050.00 58,050.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 12,900.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 6,450.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 2,870.25 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 3,870.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 387.30 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 105.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed.