Copperstone-CS 950911COPPELL ENGINEERING
MEMORANDUM
DATE
TO:
FROM
RE:
September 11, 1995
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintendent
Development Fees for Copperstone Estates Third Revision
The following fees should be assessed
referenced project.
Water Impact Fee:
129 - 5/8" x 3/4" Domestic Meter/s
3 - 1 1/2" Irrigation Meter/s = __
__ - Fireline Meter/s = __
Total
144
100% due prior to Council approval
and collected on the above
129 ESU's
15 ESU's
ESU's
ESU's @ $450.00 ea = $64,800.00
of the final plat.
Wastewater Impact
129 - 5/8" x 3/4" Domestic Meter/s =
Total 129 ESU's @ $450.00 ea =
129 ESU's
$58,050.00
100% due prior to Council approval of the final plat.
water Tap Inspection Fee
132 Connections @ $100.00 each = $13,200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
129 Connections @ $100.00 each = $12,900.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
129 lots @ $ 50.O0/lot = $6,450.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
129 - 5/8" x 3/4" Domestic Meters @ 22.25 ea. = $2,870.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
3 - 1 1/2"
(Irrigation/Fireline)
Irrigation Meter/s
Fireline Meter/s @
@ $129.05 ea
$ ea
Total
= $387.15
= $
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
129 Meters @ $35.00 ea = $3,870.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
3 Meters @ $35.00 ea = $105.00
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
Development Fees
Page 3
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 4
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the city of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
UNIT PRICE
$53.1o
$63.54
$58.56
$65.12
$11.6o
$96.85
QUANTITY
EXTENDED PRICE
OTHER
Cost breakdowns may be
request.
TOTAL
obtained from Public
Works by written
DEVFEES.HLP Revised 5/26/95
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
September 11, 1995
Copper Stone Estates
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 64,800.00 64,800.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 13,200.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 58,050.00 58,050.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 12,900.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 6,450.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 2,870.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 3,870.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 387.30
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 105.00
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.