ST9302-LR 990927ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
REPORT OF CONCRETE
COMPRESSION TEST
TESTED FOR:
CITY OF COPPELL
COPPELL, TEXAS
DATE OF iSSUE:
09/27/99
PROJECT:
SANDY LAKE ROAD PROJECT NO. ST 93-02 OUR REPORT NO.:
COPPELL, TEXAS
98881-83
LOCATION OFCONCRETEPLACEMENT
FIELD DATA
FOOTING AT STATION 15+00
DATE PLACED 09/27199
TIME N/A
SLUMP (ASTM C-143) N/A
AIR CONTENT (ASTM C.231 [] OR C-175 I-I)
NR TEMPERATURE N/A
CONCRETE TEMPERATURE N/A
DATE RECENEO NIA
FIELD DATA SUBMITTED BY CLIENT //
MIX DATA SUBMITTED BY NIA _~
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 UI' OR C-1231 []
PLANT NIA
DELIVER TICKET NO. N/A
MIX PROPORTIONS (SSD)
CEMENT N/A
WATER NIA
FINE AGGREGATE N/A
COARSE AGGREGATE
ADMrXTURE N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C-39)
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH, PSI
82 LAB 10/04199 7 94,240 28.27 3,330
83 LAB 10/25199 28 117,842 28.27 4,170
84 LAB 10/25/99 28 116,745 28.27 4,130
85 LAB HOLD H 28.27
REMARKS: CLIENT MADE CYLINDERS
[] O,/linde~ made by ALPHA
[] Cylinders delivered to ALPHA
applicable specil'mations.
[] Compresskm test results do not comply
with applicable specifications.
ri
ALPHA TESTING, lNG.
Geotechnical Engineering · Construclion Materials Testing · En~4ronmental Engineering · ~ttlng