Loading...
Copperstone-CS 940726COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 26, 1994 Engineering Departm~n~ Public Works Staff~5(~° Development Fees for Copperstone Estates Revised The following fees referenced project. Water Impact Fee: 130 - 5/8" X 3/4" 3 - 1 1/2" Total 145 100% due prior to Council should be assessed and collected on the above Domestic Meter/s = 130 ESU's Irrigation Meter/s = 15 ESU's Fireline Meter/s = __ ESU's ESU's @ $650.00 ea = $ 94,250.00 approval of the final plat. Wastewater Impact (City) 130 - 5/8" x 3/4" Domestic Met_~JL~s = 13___~0 ESU's Total 13~_ - ES U's ~ $~%q~r~Oea =~ $ ~,~00.--~0 100% due rior to Co p uncil appro--g~fi--of the final plat. Water Tap Inspection Fee 133 Connections @ $100.00 each = $13,300.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 130 Connections ~ $100.00 each = $ 13,000.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final 13o lots Inspection Fee (Ail Development) $50.00/lot = $ 6,500.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 130 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 2.892.50 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 3 - 1 1/2" Irrigation Meter/s @ $ 129.10 ea = $ 387.30 - Fireline Meter/s @ $ 100% due prior to issuance of water meter/s. ea = $ Water Meter Deposit (Residential) 130 Meters ~ $30.00 ea = $ 3,900.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit 3 Meters @ $35.00 ea = $ 105.00 100% due prior to issuance of water meters.