Copperstone-CS 940726COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
July 26, 1994
Engineering Departm~n~
Public Works Staff~5(~°
Development Fees for Copperstone Estates Revised
The following fees
referenced project.
Water Impact Fee:
130 - 5/8" X 3/4"
3 - 1 1/2"
Total 145
100% due prior to Council
should be assessed and collected on the above
Domestic Meter/s = 130 ESU's
Irrigation Meter/s = 15 ESU's
Fireline Meter/s = __ ESU's
ESU's @ $650.00 ea = $ 94,250.00
approval of the final plat.
Wastewater Impact (City)
130 - 5/8" x 3/4" Domestic Met_~JL~s = 13___~0 ESU's
Total 13~_ - ES U's ~ $~%q~r~Oea =~ $ ~,~00.--~0
100% due rior to Co
p uncil appro--g~fi--of the final plat.
Water Tap Inspection Fee
133 Connections @ $100.00 each = $13,300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
130 Connections ~ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final
13o lots
Inspection Fee (Ail Development)
$50.00/lot = $ 6,500.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
130 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 2.892.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
3 - 1 1/2" Irrigation Meter/s @ $ 129.10 ea = $ 387.30
- Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
ea = $
Water Meter Deposit (Residential)
130 Meters ~ $30.00 ea = $ 3,900.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
3 Meters @ $35.00 ea = $ 105.00
100% due prior to issuance of water meters.