Copperstone-CS 940211The City With A Beautiful Future
February 11, 1994
Dowdey, Anderson and Associates, Inc.
16250 Dallas Pkwy Suite 100
Dallas, Texas 75248
RE: Copper Stone Estates
Development Fee Assessment
PUBLIC WORKS
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Dear Sir::
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Copper Stone Estates.
Please provide a check made payable to the City of Coppell in the amount of $123,500.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment
List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
February 11, 1994
Copper Stone Estates
TOTAL AMOUNT DUE
ASSESSMENT PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $84,500.00 $84,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $13,000.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee (MUD) $29,250.00 $29,250.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $13,000.00 -O-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $6,500.00 -0-
(100%due at Issuance of Building Permit)
Water Meter Fee (Lots) $2,892.50 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Irrigation & Fire) -0- -0-
(100% due at Issuance of Water Meters)
Water Meter Deposit $3,900.00 -O-
(100%due at Issuance of Building Permit)
Irrigation Meter Deposit -0- -O-
(100%due at Issuance of Water Meters)
Street Sign Fee $2,727.55 -0-
(100%due prior to Accaptanee of Projec0
Street Light Fee * -0-
(100%due prior to Acceptance of Project)
Park Fee $19,500.00 $9,750.00
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL $175,270.05
TOTAL AMOUNT DUE PRIOR TO $123,500.00
COUNCIL APPROVAL
+ Construction Inspection Fee
(2% of Project Cost due prior to
preconstruction meeting)
This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
February 4, 1993
Engineering Department
Public Works Staff
Development Fees for Copper Stone Estates
The following fees
referenced project.
Water Impact Fee:
130 - 5/8" x 3/4"
Total 130
100%
should be assessed and collected on the above
Domestic Meter/s = 130 ESU's
ESU's @ $650.00 ea = $ 84.500.00
due prior to Council approval of the final plat.
Wastewater Impact (MUD)
130 5/8" x 3/4" Domestic Meter/s = 130 ESU's
Total 130 ESU's @ $225.00 ea = $ 29,250.00
100% due prior to Council approval of final plat.
Wastewater Impact
0 -
Total
(City)
Domestic Meter/s =
ESU's @ $450.00 ea =
ESU ' s
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
130 Connections @ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
130 Connections @ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit. (Residential only)
Utility Final Inspection Fee (Ail Dvelopment)
130 lots ~ $50.00/lot = $ 6,500.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
130 5/8" x 3/4" Domestic Meters @ 22.25 ea = S 2.892.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
0 Irrigation Meter/s @ $
0 - Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
ea
ea
= $
=
Water Meter Deposit (Residential)
130 Meters @ $30.00 ea = $ 3,900.00
100% due prior to issuance of building permit.
Note:
This assessment does not include water impact, water tap,
water meter, or water meter deposit fees for the irrigation
meters. No sizes were available at this time for
calculation.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
130
Residential Lots at $150.00 each = $ 19,500.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid
prior to Council approval of final plat.
by the Developer;
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Development Fees
Page 4
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, chief Building official
Development Fees
Page 5
STREET SIGN ASSESSMENT
for Com~er Stone
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 27 $1,715.58
Yield $58.56
Stop $65.12
Street Name S11.60 2 23.20
Stop & Street Combo $96.85 871.65
OTHER
NO outlets (30"; $58.56 117.12
TOTAL $2,727.55
DEVFEES.HLP/COPPER.HLP