Loading...
Copperstone-CS 930204COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM RE: February 4, 1993 Engineering Department Public Works Staff Development Fees for Copper Stone Estates The following fees referenced project. Water Impact Fee: 130 - 5/8" x 3/4" Total 130 100% due prior to Council should be assessed and collected on the above Domestic Meter/s = 130 ESU's ESU's @ $650.00 ea ='$ 84,500.00 approval of the final plat. Wastewater Impact (MUD) 130 - 5/8" x 3/4" Domestic Meter/s = 130 ESU's Total 130 ESU's ~ $225.00 ea = $ 29,250.00 100% due prior to Council approval of final plat. Wastewater Impact (City) 0 - Domestic Meter/s = ESU's Total ESU's @ $450.00 ea = $ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 130 Connections ~ $100.00 each = $ 13,000.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee 130 Connections ~ $100.00 each = $ 13,000.00 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Dvelopment) 130 lots @ $50.00/lot = $ 6.500.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 130 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 2.892.50 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 0 - Irrigation Meter/s @ $ ea 0 - Fireline Meter/s @ $ ea 100% due prior to issuance of water meter/s. = $ = Water MeterDeposit (Residential) 130 Meters ~ $30.00 ea = $ 3,900.00 100% due prior to issuance of building permit. Note: This assessment does not include water impact, water tap, water meter, or water meter deposit fees for the irrigation meters. No sizes were available at this time for calculation. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 130 Residential Lots at $150.00 each = $ 19.500.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building official Development Fees Page 5 STREET SIGN ASSESSMENT for Copper Stone The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. S~GN UNIT PRICE No Parking $53.~0 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER No outlets f30"; $58.56 QUANTITY 27 2 EXTENDED PRICE $1.715.58 23.20 871.65 117.12 TOTAL $2,727.55 DEVFEES.HLP/COPPER.HLP