Copperstone-CS 930204COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM
RE:
February 4, 1993
Engineering Department
Public Works Staff
Development Fees for Copper Stone Estates
The following fees
referenced project.
Water Impact Fee:
130 - 5/8" x 3/4"
Total 130
100% due prior to Council
should be assessed and collected on the above
Domestic Meter/s = 130 ESU's
ESU's @ $650.00 ea ='$ 84,500.00
approval of the final plat.
Wastewater Impact (MUD)
130 - 5/8" x 3/4" Domestic Meter/s = 130 ESU's
Total 130 ESU's ~ $225.00 ea = $ 29,250.00
100% due prior to Council approval of final plat.
Wastewater Impact (City)
0 - Domestic Meter/s = ESU's
Total ESU's @ $450.00 ea = $
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
130 Connections ~ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
130 Connections ~ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit. (Residential only)
Utility Final Inspection Fee (Ail Dvelopment)
130 lots @ $50.00/lot = $ 6.500.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
130 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 2.892.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
0 - Irrigation Meter/s @ $ ea
0 - Fireline Meter/s @ $ ea
100% due prior to issuance of water meter/s.
= $
=
Water MeterDeposit (Residential)
130 Meters ~ $30.00 ea = $ 3,900.00
100% due prior to issuance of building permit.
Note:
This assessment does not include water impact, water tap,
water meter, or water meter deposit fees for the irrigation
meters. No sizes were available at this time for
calculation.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
130 Residential Lots at $150.00 each = $ 19.500.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Development Fees
Page 4
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building official
Development Fees
Page 5
STREET SIGN ASSESSMENT
for Copper Stone
The following assessment is being made in accordance with the city of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
S~GN UNIT PRICE
No Parking $53.~0
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
OTHER
No outlets f30"; $58.56
QUANTITY
27
2
EXTENDED PRICE
$1.715.58
23.20
871.65
117.12
TOTAL
$2,727.55
DEVFEES.HLP/COPPER.HLP