Freeport NIP(7.7)-CS001031 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To-'
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Larry Morton & Avery Rodgers, Streets Division Public Works
October 31, 2000
Follow up Walk-thru Creekview Drive Extension (Freeport & Royal)
1. Paving O.K.
2. Drainage O.K.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
10/~1×00 12:40
ID--CITY OF COPPELL
DATE
18/~1
S~R-TIME DISTANT STATION ID
00~21" CITY OF COPPELL
MODE PAGES RESULT
CALLING 01 OK 0000
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
l~rom:
Date:
RE:
Larry Davis, Construction Inspector Engineering
larry Morton & Avery Rodgers, Streets Division Public Works
October 25, 2000
Walk-thru Creekview Drive Extension (Freeport & Royal)
Pavine
Creekview Dr.
1. , Clean & seal joints at curb patch on north end of Creekview.
2. Rout & seal random cracks.
Left Turn Lane on Royal
1. Both right signs need to be 24"X30" and bases need to be flush with ground (at
ground level.
Drainaee
1. Form board left in inlet box-needs to be removed. Pour inlet box on east side of
Creekview.
2. 21" RCP running east & west under new portion of Creekview-almost all joints are
bad.
3. Fa~t drive off Creekview-ponding on Creekview.
CITY OF COPPELL PUBLIC WORKS DEPARTMENI'