Loading...
Freeport NIP(7.7)-CS001031 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To-' From: Date: RE: Larry Davis, Construction Inspector Engineering Larry Morton & Avery Rodgers, Streets Division Public Works October 31, 2000 Follow up Walk-thru Creekview Drive Extension (Freeport & Royal) 1. Paving O.K. 2. Drainage O.K. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 10/~1×00 12:40 ID--CITY OF COPPELL DATE 18/~1 S~R-TIME DISTANT STATION ID 00~21" CITY OF COPPELL MODE PAGES RESULT CALLING 01 OK 0000 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: l~rom: Date: RE: Larry Davis, Construction Inspector Engineering larry Morton & Avery Rodgers, Streets Division Public Works October 25, 2000 Walk-thru Creekview Drive Extension (Freeport & Royal) Pavine Creekview Dr. 1. , Clean & seal joints at curb patch on north end of Creekview. 2. Rout & seal random cracks. Left Turn Lane on Royal 1. Both right signs need to be 24"X30" and bases need to be flush with ground (at ground level. Drainaee 1. Form board left in inlet box-needs to be removed. Pour inlet box on east side of Creekview. 2. 21" RCP running east & west under new portion of Creekview-almost all joints are bad. 3. Fa~t drive off Creekview-ponding on Creekview. CITY OF COPPELL PUBLIC WORKS DEPARTMENI'