Loading...
Denton Tap 1A-LR051021ECS - Texas~ LLP 4950 Keller Springs Road, Sult~ 480 Addison, TX 76001 (972) 3923222 (FAX) 392-0102 Project Wachovia - Coppell Location Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Tolls/Parking* Chargeable Items Nuclear Gauge Rental Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 14 Day & Date Friday 10/21/2005 Weather 85°/Sunny On-Site Time 2.00 Lab Time 0.25 Travel Time* 1.00 Total 3.25 Re Obs. Time 0.00 Time of Arrival Departure ll:00A 01:00P * Travel time and mileage will be billed in accordance with the contract. Summary ofSen~ces Pedonned (field test data, Iocalons, elections & depths am estimates) & Individuals Contactad. The undersigned arrived on site, as requested, to observe the placement and compaction of soils for paving and utilities. Utilizing the Nuclear Method (ASTM D-2922) to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with project drawings and specifications with regards to lift thickness and moisture content. By Dwight Goldy, -- Senior Field Technician 700 70747 0 ECS - Texas, LLP 49E0 Keller Springs Road, SulM 480 Addison, TX 75001 (972) 392-~222 (FAX) 392-0102 Project Wachovia - Coppell Locati~ Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Chargeable Items Tolls/Parking* Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 15 Day & Date Friday 10/21/2005 Weather 70°/Sunny On-S~te Time 0.50 Lab Time 0.25 Travel Time* 1.00 Total 1.75 Re Obs.~me 0.00 Time of Arrival Departure 07:00A 07:30A * Travel time and mileage will be billed in accordance with the contract. Summary of Sewtces Performed (field t~st data, Iocalons, elewtlona & depths are estimates) & Individuals Co~tactad. Concrete Cylinder Pick-up: The undersigned arrived on site to retrieve concrete cylinders molded on a previous date. The test cylinders were found to be undisturbed and were returned to ECS for curing and compressive strength testing. 1 set of 4 cylinders was picked up on this date. By Louis l)eRossi 1800 70750