Loading...
ST8201-AG 900612AGENDA REQUEST FORM CITY COUNCIL MEETING June 12, 1990 IT~NO. ITEM CAPTION: Discussion and consideration of approval fo L. H. Lacy Co.'s Application for Final Payment for the construction of the Denton Tap Road Improvements project from (D~Wr4~tor' s Signature) EVALUATION OF ITEM: STAFF REP.: Ginn, Inc. Consulting Eng. OTHER REP.: DATE: 5/29/90 Staff recommends approval of Final Payment in the amount of $230,989.10. An Executive Summary is included in the back-up material. If the Council should elect to discuss liquidated damages we recommend that it be done in executive session prior to consideration of this item. AppR OyVED cOUNCIL CiTY DATE BUDGET AMT.: $3,369,596.00 COMMENTS: ASee attached AMT. ESTIMATED: $3,337,038.96 AMT. +/- BUDGET:~ + $327557.04 FINANCIAL REVIEW BY: /~ LEGAL REVIEW BY: AGENDA REQ FORM.05$SDS REVIEWED BY 6~q: ~~ Date: June 5, 1990 TO: Frank Trando F~M: Misty Roper RE: Denton Tap Improvements AMOUNT ISSUED: 4,500,000.00 OTHER REVENUES: 2,299,769.81 TOTAL ~$ 6,799,769.81 PAID TO DATE ~hh~CE 6/5/90 6,112,196.31 687,573.50 A total of $362,437.59 has bean requested for final palment on the Denton Tap Road Improvements project from Beltline Road to Sandy Lake Road and from Sandy Lake Road to Denton Creek. The $36,000.00 change order is Included in the above amount. After ~aktng the final payment of $362,437.59 to L.H. Lacy, we will have a balance of $325,135.91 r~-~lntng in Denton Tap of which most is already ancumbered for lighting, irrigation, landscape, etc.. GINN, INC. CONSULTING ENGINEERS May 31, 1990 Mr. Steve Goram, Director of Public Works City of Coppell P.O. Box 478 Coppe11, TX 75019 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road Dear Mr. Goram: We are transmitting herewith the Final Application for Payment, Release of Surety, Waiver of Lien, Executive Summary and recommendations, and city Council Agenda Request for the project. At this time, the Contractor has completed all work on the project. They are in the process of correcting their as-built drawings as per our review and comments. We recommend that the request for Final Payment be placed on the June 12, 1990 City Council Agenda for the City Council's consideration. We recommend approval of the Final Application for Payment in the amount of $230,989.10 Please forward the Final Applications for Payment to the Finance Director with our recommendation. If you see a need for any revised or additional information, please call me. Sincerely, John C. Karlsruher, P.E. JCK/dsp enclosures cc: Frank Trandow/enclosures H. Wayne Ginn, P.E. Files 378 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 EXECUTIVE SUMHARY FINAL REPORT DENTON TAP ROAD IMPROVEMENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD May 31, 1990 PROJECT CHRONOLOGY The project was advertised for bidding during January and February, 1988 and bids were received on March 3, 1988. After a contract was awarded on April 26, 1988 to L. H. Lacy Company, in the estimated amount of $ 3,362,580.00, a Notice-To-Proceed for the 365 calendar day contract was issued effective June 15, 1988. During the course of construction of the project both weather and changes in the scope of work of the project brought about requests for extensions in contract time. The original contract completion date was June 14, 1989. The requested time extensions and their impact on the contract completion date are listed as follows: Time Contract Contract requested time date Original Contract 365 6/14/89 1. Change Order No. 2 14 days 379 6/28/89 2. Request dated 6/1/89 3 days 382 7/1/89 3. Request dated 6/13/89 60 days 442 8/30/89 4. Field Change No. 20 75 days 517 11/13/89 Total 152 days The Contractor claims to have reached substantial completion on September 20, 1989. Our research indicates that substantial completion was achieved on or about 10/25/89. In either case the time extensions requested by the Contractor will put the contract date beyond the date of substantial completion. From the date of substantial completion until the date of the final walk-through inspection, February 19, 1990, the Contractor completed his work on miscellaneous small work items and reD~r/replacement of defective work. Since .the date of the final ~nspection the Contractor has been workln~ on t~e punch list of items noted by ourselves and the City during the inspection. At this time the contractor is preparing "as-built" drawings and submitting contract closeout items including his application for final payment. Page i of 2 ~INANCIA~ This project began with an estimated Contract Price of $3~362,§80 based on the contractor's low bid of $3,369,596 minus a rebate of $26,000 and plus an additional cost of $18,984 for the addition of the Decorative Concrete Bridge Railing selected by the city Council in award of the contract. The rebate in the total amount of $40,000 was proposed by the contractor in the event he was awarded both projects and could work on them simultaneously. The contractor was low bidder on both projects and was awarded both Contracts and the rebate has been prorated to both projects as follows: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road @ 65% = $26,000 Denton Tap Road Improvements from Sandy Lake Road to Denton Creek @ 35% = $14,000 $40,000 These amounts will be deducted from the Final Contract Amount of the respective Contracts. The final analysis of the construction contract follows: Original Estimated Contract Amount Final Quantity Underruns Final Quantity Overruns Change Orders and Field Changes Final Contract Amount $3,362,580.00 (213,085.72) 53,439.22 134,105.46 $3,337,038.96 Reimbursement from Dallas County @ 65% of $2,600,000 from 1985 Bond Program Net cost to the City of Coppell Contract Retainage to Date (1,690,000.00) $1,647,038.96 $ 163,476.30 SUMMARY The project construction has been completed at a savings of approximately $25,541.04, while maintaining the original design intent and quality. A more detailed budget analysis of this and its companion project to the north reflects a substantial cost savings to the City for the entire Denton C.I.P. program. Despite delays due to weather and other causes, we feel that this is a successful project and recommend the City's acceptance. Should the City Council wish to discuss the matter of liquidated damages, we request that this be held in an executive session prior to the city Council meeting open session. Page 2 of 2 GINN, INC. CONSULTING ENGINEERS May 31, 1990 Mr. Steve Goram City of Coppell P.O. Box 478 Coppe11, TX 75019 Re: Denton Tap Road Improvement Projects Dear Steve: The Denton Tap Road Improvement projects are now complete. Enclosed is the final documentation required for the city to accept the project and make final payments to L. H. Lacy Company. This package contains three separate items which are: Change Order No. 5 and Final Payment Request for the north project and Final Payment Request for the south project. Attached is a final estimated summary of costs as of this date. With all things considered at this point in time, the city has realized an approximate cost savings to date in excess of $235,000.00 from the original budgeted amount (plus $125,000 transferred to Belt Line Road East/West). We are proud to have been of service to the city in the planning, design and project administration of the projects. We want to thank you, and all of the city Staff for their cooperation and assistance throughout the duration. Sincerely, H. ~a~yne Glnn, P.E. HWG/dsp cc: Frank Trando John C. Karlsruher, P.E. Files 378, 379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 GINN, INC. CONSULTING ENGINEERS ESTINATED COST SUNNARY DENTON TAP ROAD FROM BELT LINE TO SANDY LAKE ROAD AND FROH SANDY LAKE ROAD TO DENTON CREEK NAY $1, 1990 PREPARED BY GINN, INC. CONSTRUCTION C6 LANE W/ ST*D BRIDGE RAZL) RAILROAD CROSSING CONOCO PZPELINE STREET LIGHTS LANDSCAPING TRAFFIC SIGNALS RIGHT-OF-WAY ENGINEERING INSPECTION AND TESTING TRENCH SAFETY CORTINGENCZES ABQ DEV. REIHBURSENENT UNIVEST REI#BURSE#ENT OTHER ORIGINAL REVISED BUDGETED ANOUNT BUDGETED ANOUHT ANOUNT TO DATE VARIANCE $5,161,131.83 S5,161,131.83 $5,240,564.54 79,432.71 0.00 0.00 206,000.00 206,000.00 167,271.97 (38,728.03) 0,00 40,000.00 40,000.00 22,565.92 (17,434.08) 0.00 217,500.00 217,500.00 97,269.00 (120,231.00) 0.00 213,000.00 212,950.00 174,831.20 (38,118.80) 0.00 170,000.00 170,000.00 183,805.21 13,805.21 0.00 100,000.00 100,000.00 93,460.49 (6,539.51) 0.00 443,402.66 443,402.66 351,383.92 (92,018.74) 0.00 154,833.95 154,833.95 154,833.95 0.00 0.00 26,763.39 26,763.39 23,3?2.67 (3,390.72) 0.00 367,368.17 242,368.17 0.00 (242,368.17) 0.00 (29,254.21) (29,254.21) (9,547.60) (9,547.60) 250,6?3.03 250,673.03 TOTALS S7,100,000.00 S6,97&,950.00 S6,721,230.09 ($253,719.91) Page I of 2 17103 Preston Road · Suite 100 · LB 118 · D~las, Texas 75248 · Phone 214/248-4900 OTHER: SOUTH PROJECT NORTH PROJECT BOTH PROJECTS :TEN/DESCRIPTION I A#OUNT TO DATE IAH(XJNT TO DATE I TOTAL TO DATE 270 ASSESS#ENTS 280 CONCRETE RIPRAP #OOIF. 285 C.O. #& CNONTH PROJECT) 287 TRAFFIC SIGNS 315 ADH]N. BEYONO CONPLET]ON 330 INSP. BEYOND CO#PLETION 601 SURVEYING 602 TRAFFIC ENGINEER 609 OTHER CONSULT.- #YD. 610 ABSTRACT/TITLE 65O PRINTING 650 COURIER GTE RELOCATION EVALUATION ASSOCIATES S10,370.50 $0,655.75 $460.00 $26,999.50 S35,277.50 S18,246.64 $1,329.89 S8,138.54 S73.87 S258.&7 S2.94 S33,543.03 S21,000.00 $5,820.65 S15,327.00 S287.50 S428.75 S25,993.60 S22,288.75 S11,Z29.38 S~,325.83 S32.39 S580.97 Sl.58 $16,191.15 $23,982.75 S287.$0 $888.75 S52,993.10 S57,566.25 S29,476.02 Sl,329.89 S12,464.37 $106.26 S839.44 S4.52 S33,543.03 $21,000.00 TOTAL I S164,356.63 I S86,316.40 I S250,673.03 NOTES: 1. Contingency fund in the Revised Budget has been reduced by S125,000 vhich ~es transferred to BeLt Line Road 2. An estimated amount of $6,000 ~fLL be required to obtain a Letter of Hap Revision from FE#A for the Grapevine Creek Bridge mhd CbenneL improvements. 3. An estimated smount of $11,450.65 in additionaL sdminstration and inspection fees may be billed to the projects for services during Ney not yet accounted for or biLLed. 4. in Lieu of notes 2 snd 3 sbeve, the oversLl savings on the projects may be reduced from $253,719.91 to $236,269. Page 2 of 2 Appllca~kon for P( PAYMENT REQUEST NO. 21 SHEI FOR WORK COMPLETED THROUGH THE DATE OF : April. 8~1~ OF 1990 PROJECT TITLE: Denton Tap Road Improvements Prom Belt Line Road To Sandy Lake Road LOCATION: Coppell, Texas (From Belt Line To Sandy Lake) DESCRIPTION: Pavinq~ Drainaqe and Bridqe Improvements DATE: 05/85/90 OWNER ENGINEER INFORMATION OWNER: City Of Coppell Address: P 0 Box A?8 CITY/STATE: Coppell~ Texas 75019 Contact Person: Alan Ratliff PHONE NO: ~814) A68-0088 CONTRACTOR INFORMATION CONTRACTOR: L. H. Lacy Company ADDRESS: P 0 Box 54189? CITY/STATE: Dallas Texas 95354-1899 CONTACT PERSON: Curt Oerter PHONE NO: (214) 357-0146 ENGINEER: GINN, INC., CONSULTING ENGINEERS ADDRESS: 17103 PRESTON ROAD~ SUITE 100 LB-118 CITY/STATE: DALLAS, TEXAS 75~48 INSURANCE CO.: Fireman's Insurance Cc,. ADDRESS: 180 Maiden Lane CITY/STATE: NEW YORK~ NY 1~;038 BONDING AGENT: Collier Cobb Assoc. CONTACT PERSON: John Karlsruher~ P.E. ADDRESS: P 0 Box 8811R9~ PHONE NO.: (~14) ~48-4900 CITY/STATE: Dallas, TX ?5388 CONTRACT NO.: N/A CONTRACT DATE: May 84, 1988 PROJECT NO.: 3?8 TOTAL ORIGINAL CONTRACT AMOUNT: $ 3,36~580.00 TOTAL CHANGE ORDERS: R AMOUNT: $ TOTAL CONTP~ACT AMOUNT TO DATE: $ 3~360~16~.40 NOTICE TO PROCEED DATE: June 15~ 1988 COMPLETION TIME: 388 CALENDER DAYS CONTRACT COMPLETION DATE: July 8~ 1989 PERCENT TIME ELAPSED: 155.50 ~ PERCENT WORK COMPLETED: 1~0.00 PAGE 1 :TY DF COPPELL ,0, BOX 55 PARKWAY BOULEVARO ]PPELL, TEXAS ?SD19 L. H. LACY CONPARY 8~THLY ERT]RATE APRIL, 1990 ORIGINAL CONTRACT: 3,362,5ON.DO TOTAL CBAN6E ORDERS: (e,~ZS.BP) TOTAL: 3,361,164.4D PERCENT COMPLETE: 99.31% iD NARE: DENTDN TAP ROAD IHPROVE~ENTD FRON DOLT LINE ROAD TO SANOY LAKE ROAD 30 NONRER: 319 1 EOTIHATE t~ O! JSTD~R NONOER: 219D9 FRON FEB 1~ 199D TO APRIL 39, 1~90 ITEN PRO3ECT HDNTHLY WORK TOTAL WORK CONTRACT ~ONTNLY TOTAL I DESCRIPTION UNIT EOT. OUANTITY ON C~TRACT ON CONTRACT UNIT PRICE AHOUNT ANOUNT ~OE BID 6 LANE PAVING 109.DA PREP ROW 194,11 BANGUT IDa,Z! REND~ OLO CONC/ADPR 110.~ BENCHED EX ILO.19 ROADWAY EX 131,A9 90RRON 131.ID DELECT BONRDN 133.99 RHV RPL UNDTARLE HATL 16D.O9 TOPSOIL 16~,B9 OROAOCAOT SEEDING 2~9.ON FLEI BAOE B&D.09 LI~ TREAT 26~ooN LIHE DLURRY~ TYPE A 3SO,ID WHAC~ TYD~ CLA 3~9.Z9 NHAC, TYD CLA 360.10 8' CONC PAVE 36~,D9 6' CURD 369.39 HEARER 369,~9 8' CONC PAVE 360,59 BAILRDAD HERDER 59~.B9 FIELD OFFICE 51249 P~T CONC TBAFF BARR 51~,BD BARRIER (HAVE~RERET) 51E,3A BARRIER (RENOVE~ 539,19 6' DRIVE &HEO NOSE 539,11 6~ DRIVE BEYOND ROI{ 539.ED PAVERS (ONI-RECDR) 539.39 PAVERS (RDLLANG II 5~D.I9 TEONINAL ARCHUR 666o9~ RR X-ZNDB PAVE HARK 66649 lB" STOP BAR 672.9B 6'X6' 3166LE OAR 676.I9 ~' DUTTON~ WHITE 6?6.29 ~' SUTTON~ WRITE JBTDTAL 6 LANE PAVIN6 OTA 74.91 9.19 7~.91 ~Og.BA' O.90 LF l~O~O,P9 (117,99) 1~177.56 2.80' CY 5,~DO.D9 O.~ 5,2~.~0 1.69' ~.g9 B~3~O.P9 CY {9,115.99 9.99 I?,159.~g ~,49' 1.DO B~,391.36 CY 1,999.89 3,OB4.P~ 3~BB4.D9 1.09' CY 15~93D.R9 ~,OBI.D9 1B,1Bl,D9 3.49' CY 6~,D9 D,B9 493.O9 5.99' OY 1~,O22.99 B,gD 13,BB~.90 !.5D' 0.99 6,%9.D9 SY 33,732,D9 !.09 15~879.5B 9,42' D.DO DY 6I~611.BA (179.3B) 33~B5.58 0.99' TON 693,1B (1,93) 37~.27 61,D9' (117.73) TON B3~.BB O.DD 9,DO 45.D0' 9.D9 D.ON TON 9D~.DA ~.ON 56R.1~ 47,g~' OY 57,925.D9 ?ER.ON 5B,RE~.OB 13.89' 10,B~6.~D LF IB4.~ 29,BO ~3.~2 3.09' OB.g9 139.26 SY 1,647.A0 11~.90 1,?12.g9 I~.OD' I~635.~D LP I?1.89 9.99 191.D9 5.p9' LF 3,950.B0 B.99 e,?39.B9 15.99' LF 1,3OB.OB D.DD D.D! 5.3B* 9.~9 D.~D LF 3,DSO.OD O.D9 E,?30.DD 5,39' 9.PO SY 2,~9.BB 9.99 2~%?.37 25.09' B.99 73~OB~.D5 SY 295.~ 9.~ 333.16 l&.gg' ~.BA 5~33g.~ SY 1,585.~g 79.33 l~l~l.~g ~l.~{' 1~&5.93 ~3s961.~ LF 947.~ ~.{g 9~.{g ll,g~ ' g.~g 9~9~.~ EA E.Pg ~,{~ Z.$8 3Z75.~' g.~ 6~5~.ON EA l~.g~ l~.gg 1~35g.~ ~,~ · 3~.ON ~9?~.N e6,539.33 1,~B3,237.15 ONAINA6E RIP RAP CY 12.9g D.DD PAGE L. H. LACY CONPANY NDNTHL¥ EST]HATE APRIL, 199B :TY OF CDPPELL ,O. BOX 4?8 55 PARKRAY BOULEVARD ~PPELL, TEXAS ?SOl9 ORIGINAL CONTRACT: 3,3GE,DOe. OS TOTAL CHANGE ORDERS: TOTAL: PERCENT CONPLETE: 99.3l[ ]B NANE:.BENTON TAP ROAD ]NPRDYENENTS FRDN BELT LINE ROAD TO SANDY LAKE ROAD ~B NUHOER: 3ID ! EGTINATE I: e! USTDNER NUHBER: ~lPP9 FRDH FEB l, IO?D TO APRIL SD, ITEN PRD~ECT NDNTHLY NDRg TOTAL NDRK CDNTRACT HONTNLY TOTAL ! DESCRIPTION UNIT EST. OUANTITY ON CONTRACT ON CONTRACT UNIT PRICE ANOUNT ANDUNT ~GZ.le 6X6 RCOC LF 5E~.OR ~.g6 5eR.RD 136.BO ~ B.BR b~E.e! 6XID RCSC LF GR,PB ~6~.3~ TRANSITION lD 1.O0 D.~R I.DD 360~.DD ' g.gD ~.lg IS' RCP LF ~6~.~D El" RCP LF ~6~.3~ E~" RCP LF 1,DeS.RD D.DO I,q56.DB ~6.5D ' O.Dg 3B,DB4.DB ~6~.5D SD' RCP LF ~5g.gW O.BD BD).BB Se. RD ' g.D~ B~JOD.BD ~4.6D 36' RCP LF 1,~3.~ ~6~.?B 4~' RCP LF 5gg.Bg O.DO 5~.DG 51.OD ' ~64.8B 48' RCP LF ~64.90 5~" RCP LF ~,699.B0 B.BB 1,6?9.RB ?g. DD ' D.OD IS5,D?S.5~ ~64.1D 66" RCP LP lID.OD D.RB IlO.DO 183.BO- O.~D I1,33D.gD ~64.11 ?E" RCP LF ~64,1~ RMV I)ROP INLET LS 1.gO g.g6 1.~ 16%.~- B.P9 1,~%.~ q?5.1B 5' RCSSD INLET EA ~75.11 5' CURB INLET EA ~.OD A.gg e.RG 15OS.DR' D.00 3,1BO.DB 475.1e 5' CURB INLET MOA EA R.PR g.PR ~.gg I85D.DD- B.DB S,?ID.OR ~?5.eB 1~' RCSSO INLET EA 35.~ 475.~ ID' C~B INLET ~75.36 le' RCSSD INLET EA 5.Be ~75.5~ ~' DROP INLET TY ~ EA e.~ ~.~ ~.6~ I9~B.~- ~.~ 3,BI~.~ ~75.51 ~' DROP I~LET TY Y EA I.~J ~.P~ 1.P~ 1~%.6~' ~.P~ 1,~%.~ ~75.~ TY B SS RH EA I.~ ~.~ I.~P ele~.~- ~.~ e~l~.~ ~.~1TY ~ SS ~ ~ I,~ ~.g~ 1.~ 21~J.~- g.~g ~,1~.~ 475.7J 3~CTI~ BOX EA 1.~ g.gg 1.9g 316g.g~' O.g~ 3,1~.gg 475,71 NOD EXIST 3UNCT 80X EA 1.gO ~75.8g SS KH EA e.~ g.gg e.~ 15~8.~' 6.gO 3,1~.gg 4?9.66 AD3 SS NH EA 4?9.iA ADSUST STRUCTURES EA 58~.1g ADJUST WATER VAL~ EA 9.gO 6.~ ~g.g8 316.g6 ' 9.gg 6,369.~ 58~.~J REL AD3 NED flETER EA 5.6g ~.89 3.PS 4?7.gO- 9~.gg l,~3l.gJ 59e.~ REL AD3 FIRE HYDR~T EA 8.~ 58E.~ ~" STUBDUT/VALVE EA 58~.59 COMER 8' HeO LINE LF e~5.PP e.~ e3e. S8 al.~e - e.ee ~,B8~.~8 · ' ~ ~ PAGE 3 L. H. LACY CONPANY HONTHLY EST]NATE APRILf 199S :TY OF COPPELL .0. AOX 478 ;5 PARKHAY BOULEVARD 3PPELL, TEXAS ?SRI9 ON]6IHAL CONTRACT: 3~366,5OR.8! TOTAL CHANGE ORDERS: TDTAL: PERCENT COHPLETE= 99.31~ 29 NAHE: DENTON TAP ROAD ]HPROVENENTS FRON BELT LINE ROAO TO SANDY LAKE ROAD DO NUHSER: 316 I EST]HATE 6: Gl ~STONER NUNOER: E]669 FRON FEN ], 19SD TO APRIL 36, I996 ITEN PRO~ECT NOHTHLY NORK TOTAL WORK CONTRACT NONTHLY TOTAL ! DESCRIPTION UNIT EST. QUANTITY ON CONTRACT ON CONTRACT UNIT PRICE ANOUNT ANDUNT SOS.86 RELOCATE B' HeO LINE SBR.9R REL 16' NRO LINE 5OR.IS IRRI6ATION CONNECT 58~.11 R" SS 5BE.13 CDNC ENCASENENT 58E,14 EXTEND IR" SS AERIAL ~16,18 Z' PVC 618.~G 3" PVC 6e~.BD POLL BOXES 1ZG.H CHANNEL E~CAVATIDN 4SE.eD RIP RAP CHAN LININN 43e.38 IR' STDNE RIP RAP 16~.00 BROADCAST 9EEDIN6 ~TOTAL DRAINAGE LS 1.89 e. Og 1.89 6366.6~ ' 8.99 6,36G.SD LS 1.99 ~.~0 I.D6 11E36,66' D.8~ II,~36.SR EA I~.OD A.G8 7.R6 636,90 ' e. GP LF 35.DO 9.99 35.D0 E].6~ ' ~.De CY q3.~ 3.~6 ?.OB ~R.D~' 1~.08 LS I.DP ~.I~ I.DO ]?BBO.DR- l~?88.SG i?,RRR.DO LF ]%DIS.GO 45~.5~ IA,e~6.SB E.~4 - 1,16O.98 3~,7~5.6D LF 1,891.99 D.60 1,989.89 3.6~- ~.~R EA 78.86 6.~ BO.OD I~?.RS' ?62.Oe 1D,9~S.RD CY i3,777.6~ 6.8~ 13,???.8~ G.1B' R.RB 43~81{.86 CY 1B3.8~ 6.~ ~16.D6 ~lG.6~' D.OD CY 435.6~ 8.89 a35.8~ 161.SD - g.N8 ~3,735.88 SY 7,9~5.86 ?,985.~ ?~985.DD 6.5D' S,?5~.S~ 3,95~.5D S,?He. E8 837~063.8~ RENCH & SLOPE EICAVATIOR 15DS.I! SlflPLE SLOPE CLAY H=5~I! LF 15~0.66 SIMPLE SLOPE CLAY H=IP-15 LF ~5RDoSA SINPLE SLOPE CLAY H=15-E~ LF 1561.1~ SIHPLE SLOPE IN SAND & CLAY H=5-iD LF ]SOl.RD SINPLE SLOPE IN SAND & CLAY H=iB-15 LF !561.3S SINPLE SLOPE IN SAND & CLAY H=IS-e6 LF !56~.1R COflP PROTEC SLOPE CLAY COND H=5-10 LF ~566.R8 COHP PRDTEC SLOPE CLAY CDNO H=IO-I5 LF ]56R.3~ CONP PROTEC SLOPE CLAY COND H~IS-RD LF !~3.18 CONP PRDT SLOPE SAND/CLAY H=5-JP LF ~503.88 CONP PROT SLOPE SNNO/CLAY H~IR-~5 LF ~3.38 CONP PRDT SLOPE SAND/CLAY H~IS-.~ LF ~SP~.I8 SLOPE & SEHCH CLAY H~5-~8 LP ]5~.eS SLOPE & BENCH CLAY H~IS-t5 LF ~56~.3R SLOPE & SEHCH CLAY U=15-86 LF !5~S.Ig TINRER SHORING H---5-1S LF 1565.88 TlflOER SHORIN6 H~IO-IS LF 15~5.36 TIflRER SHORIN6 H=iS-eS LF iSiS.iS TRENCH BOX H=5-16 LF 1586.89 TRENCH BOX H=18-15 CF ;SA~.S~ TRENCH BO[ H=IS-EO LF JSTDTAL TREKCH & SLOPE EXCAVATION ~,RIR.RA O.RD ~?.OD 1.16 ' 6.0G 5I,?D ~85.~ 6.89 D.OP ~.88 ' 6.99 8.99 7OS.DR O.96 ~8.98 1.~P ' g. Sg AS.DO g.~6 D.RH 8.99 4.DO . D.OQ 8.NO O.DG 8.DO ~,?3g.~g 1.5~ - g.BO 4,9?5.88 P.O! P.88 8.O6 lO.g! - 8.8! P.g8 8.~ S.Hg 6.89 80.gO. 8.SD 8.89 6.86 S.68 ~56.89 R.86 ' O.O0 51~.8D PAGE L. H. LACY CDNPANY HDNTHLY EST]KATE APRIL, IVSP TTY OF COPPELL .O. BOX 478 55 P~KWAY BOULEV~D ~PPELL, TEXAS 75819 OR]6INAL CONTRACT: S~36E,SSe.&8 TOTAL CHANGE OROERS: {e,qlS.6B} TOTAL: 3,368,I~4.4~ PERCENT COBPLETE: 9g.31% ~B NffiE: DENTDN TAP ROAD I~RDVENENTB FRON BELT LINE ROAD TO SANDY LAKE ROAD 38 NUNeE~: 3]~ ! ESTINATE I: Et USTONER NUNDE~: EIDD9 FRDN FEB 1, 1998 TO APRIL 38, 1998 ITEH PRD)ECT HONTRLY WORK TOTAL WORK CONTRACT NDNTHLY TOTAL ! DESCRIPTION ~IT EST. OUANTITY ON C~TRACT ON CONTRACT UNIT PRICE A~DUNT ANOUNT RIDGE ~D8.8~ STRUCTURAL EX CY ql&.RD 18' 0/8 LF E3B.~8 8.~3 638.83 46.88- 19.78 1D,986.16 qi6.~8 38' DIS LF ~EI.D~ ABUT CDNC CY I~6.BD 4el,B! BENT CONC CY 1~,~8 B.D~ IgB.6P ~9?.~D' D.88 Eg,8?B.e8 ~el.eD APP SLAB CONC CY eae.3e D.B~ eSe. BP ~B.BD ' B.IB 5D,519.SB 4~5.P8 TV C PRSTRSSD BEANS LF e,~36.Pg 8.88 e,436.gP 61.58' g.gg I49,el~.68 4eR.Be CDNC SURF TREAT SY 1,9~8.BD 4DB.NB RIP RAP CY 4RS.BP BEARIN6 PADS EA 4~B.D~ RE STEEL LB IBI,16B.Bg B.DB I81,16U.g~ D.53- D.~D 96fADS.D4 ~.8! AR~R ~OINT, HYC LF q58.~ C-eel RAILING LF qSB.l~ RIPRAP HANDRAIL LF ]ZI.BB B.BD 1El.BO DB.P)' D.DB 3,3BB.DD 4gO.DR RHV OLD STRUCTURE EA 5~8.R8 NBBF LF 387.88 ~.PD aSq.SD 11.~)o B.BD ~,999.5N 5qB.ID TERHINAL ANCHOR EA 5OS.iR TENP RET NALL LF 5eS.B~ P.DB 5Al.OD ]B?.DD- B.BD 66,16?.DB 611.1D BRIDGE LIGHTINB LS I.R~ 8.85 1.~8 ?SGGB.~8' 3,763.~8 ?5~G6D.8~ 5~.~8 ALT DECORATIVE DROB RAIL LF 9Gq.D) 9~.4D 98~.88 69.PO- 6~BD?.68 6~,376.N) JBTDTAL BRIDGE ~ANBE ORDER ND. ! I CENENT TREAT SY S.DD B.~8 eB,Sl8.4~ 8.99 e CENENT SLURRY TN 8.e8 P.SD 3GI.96 5~.~8- ~,B~ 16,098,RD ~ANBE ORDER NO. R I CENENT SLURRY TN J.B! B.DB 182.36 II.BB' 1,1e5.% 1,125.% :ELD CHANGES E. IS' VCP S~ITARY SEWER '- ~ ~ PAGE L. H. LACY CONPANY NONTHLY ESTI~TE APRIL~ :TY OF CDPPELL .O. BOX 55 PARKHAY BOULEVARD ]PPELL, TEXAS 75619 ORIGINAL CONTRACT: 3,S6e,ODLB! TOTAL CHANGE ORDERS: (R,~15,68) TOTAL: 3,366,I6~A6 PERCENT CONPLETE: 99.31~ ]6 NANE: DENTON TAP ROAD INPROVENENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD ~B NUNGER: 316 I ESTIMATE !: 21 USTOMER NUNDER: 2]669 FRDN FED 1, I99g TO APRIL 3g, ITEH PROSECT MONTHLY NONK TOTAL NORK CONTRACT MONTHLY TOTAL 6 DESCRIPTION UNIT EST. OUANTITY ON CONTRACT ON CONTRACT UNIT PRICE ANOUNT ANOUNT ~. ADJUST NATER SERVICE EA 6.66 8.88 5.88 88LD8 8.88 5. 8' HATER VALVE EA D.Gg LD~ 2.8~ 775.D~ 8. BANRELL 6UARD RAIL LF 8.88 g.~ 1,347.86 9, 6' HATER VALVE EA 8.8D 6.68 1.86 715,8D 8.86 ?15.88 18. 2' NATER TAP EA 8.D8 8.88 1.66 ?. S' MATER LINE LF 8.8~ 8.88 223.8e 12. DDUOLE 3' PVC LF 8.88 18E.88 359.58 5.38 96q,6~ 1,985.35 13. ~' PVC IRRI6AT]ON LF 8.88 8.88 1~63.88 3.73 ~.86 5,~56,99 11. 18' RECEGSSED INLET EA 8,88 6.88 1.68 1~, 6' DRAIN CS 6.8g 6.~8 1.86 15. RAILROAD BARRICADES LS 8,86 LSD 1.88 16. IRRI6ATIDN REPAIRS LS 8.86 8,83 1,86 1% INTERSECTION ]MPROVENENTS LG 8.88 1.88 1.88 1,3 D.58 lB. MTGC LS 8.8D 1.88 1.DB ?,868A2 ?,36GA~ ?,36BAD 1% ADDITIONAL LEFT TURN LANE LS 8.~P 1.Sg I.SP lg,185.q~ 98. CONCRETE RIPRAP ~DDIFICATIDN LS 8.88 1.88 1.6g ~5~2~1.B! D8~5~9,~6 ATERIAL I. B, ON HAND DECORATIVE RAIL STEEL LD 8.88 L88 8.88 D.D2 PULL BOXES EA 8.68 8.88 g,8~ 69.D8 TOTAL ANDONT OF NORK PERFORRE~ LESG 8% RETAINANE NET AMOUNT PAYABLE ON CONTRACT LESS: SPECIAL DEDUCTIONS PLUS: EXTRA NONK NET ANOUNT DUE ON PRO~ECT LESS PAYMENTS RECEIVED TO DATE CURRENT ANDONT DUE ON PRO~ECT LACY CDNPANY NONTHLY EST]HATE APRIL! ]99~ ITY OF CDPPELL .U. BOX PARKWAY BOULEVARD 3PPELL~ TEXAS 75~I9 ORIGINAL CONTRACT: TOTAL CHANGE ORDERS: TOTAL~ PERCENT COMPLETE: 79.31X OB NANE~ DENTON TAP ROAD INPROVENENTB FRON BELT LINE ROAD TO SANDY LAKE RGAD 0~ NUNBER~ 3I! I EBTINATE t: Bi ~STONER NUNBER: ~I~e9 FRON FEB 1~ I99g TO APRIL 3D~ 199g ITEN PROJECT NONTHLY WORK TOTAL WORK CONTRACT NONTHLY TOTAL i DESCRIPTION UNIT EST. QUANTITY ON CDNTRACT ON CONTRACT UNIT PRICE AMOUNT ANDUNT ANOUNTS UNPAID FROM PRIOR EGTINATEB IP9,~31.S5 AMOUNTS DUE FRON CURRENT ESTIMATE IB1,35?.SD CURRENT ANOUNT DUE L, H. LACY CDNPONY PLEASE REFERENCE OUR JOB NUNBER AND ESTI~TE NUMBER ON YOUR REMITTANCE PECIAL DEDUCTIONS , FINAL DEDUCTION PROJECT: Denton Tep Road Improvements From Belt Line Road To Sandy Lake Road SHEET ? OF PAYMENT NO. Accompanying Documentation: GROSS AMOUNT DUE .......... $ 3,33?,038.95 LESS 0 K RETAINAGE ...... $ 0.00 AMOUNT DUE TO DATE ......... LESS PREVIOUS PAYMENTS ..... $ 3,106,049.85 AMOUNT DUE THIS APPLICATIONS REVIEWED BY: CHECKED BY: ............ ~ ................ DATE CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through 20 inclusive; and (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens~ claimer security interests and encumbrances (except such as covered by Bond acceptable to Owner). Dated May 85, , 1990 L. H. Lacy Company Contractor By ............ ,~'<~ Ngtm~/ Public ENGINEER'S RECOMENDATIO.: , ]~ ~.) ST~:TE 0F TEXAS , ~ My Comm. ~p. Sept. 18, 1993 This Application (with accompanying documentation) meet~ the requirements of the Contract Documents and payment of the above AMOUNT DUE THIS APPLICATION is recommended. ...................................... .............. T i ~ ~ ~ ___~Z~..~~ ........... OWNER'S APPROVAL: Pay request recieved ........................... _ __ by _ --~-Zr-- payment on __~_~___ day of ....... _~ ............... , 19~D. Approved for By ............... .......... ................ TITLE STATE OF TEXAS AFFIDAVIT AND FINAL WAIVER OF LIEN COUNTY OF DALLAS Scott Balch ....... of L.H. Lac~ ComEan~ , being of __~__~=__~_~D~ .... (hereinafter referred to as the "Company") and is familiar with the facts herein stated. That said Company performed work and labor and/or furnished material for use, in the construction of certain buildings, improvements and equipment on premises owned by _~_~__~E at That said Company has fully paid for all work, labor, material, machinery and equipment furnished by it or by its subcontractors or materialmen upon said premises, or furnished therefore. That the balance remaining due from _[~_~[~y_~[_~EE~[i_and unpaidto said Company is the sum of Two Hundred Thirt~ Thousand Nine Hundred Eighty-Nine Dollars& ~-~-~ ~ -~-~-~-~--~ waives all liens and claims against the said o~ner _Z~__~_~__~!i- and its premises and property~ and further, he represents that no other person or party has any right to a lien on account of any work performed or material furnished to said Company. Further affiant saith not. Scott Balch r~WORN TO before me and subscribedin my presence this ___~[~_ day of --~--/~Notary Public LETTER OF TRANSMITTAL L. I1. LIiC)/IDOIil~i~ 10;188 Shady Trail Dallas, TX ~ 1297 To: Ginn, Inc. 17103 Preston Road, Suite Lo~k Box 118 Dallas, TX 75248 WE ARE SE~IO#~I~ YO~: _X_ Attached Shop Drawinejs Copy of Letter P.O. Box 541297 (214) 357-0146 Under Separate Cover via Specifications Change Order DATE: April 9, 1990 JOB NUMBER: 310 ATTENTION: Mr. John C. KaHsurher, P.E RE: Denton Tap Road Improvements Beit#ne Road to Sandy lake Rr~d Sanely lake Road to Denton Creek The Following Items: Plans _X_ Other COPIES NO. DATE DESCRIPTION I 4/5/90 Consent of Surety Release-North Project I 4/5/90 Consent of Sure~ Release-South Project For Approval _X_ For Your Use _X_ As Requested Other For Bids Due REMARKS: Approved as Submitted Approved as Noted Retumed for Corrections For Review & Comment Resubmit Submit Retum ,19__ Prints Returned To Us After Loan Copies for Approval Copies for DistHbotion Corrected Prints Submitted in accordance with SECTION 1700-CONTRACT CLOSEOUT. COPY TO: SIGNED: 'Scott d. Balch, P.E.[ Senior Project M'anager CONSENT OF OWHeR [] ARCHITEC~T[] SURETY COMPANY CONTRACtOr[] SURETY [] TO FINAL PAYMENT OTHER OOCUMEm Cz07 BND1 12 76 78 PROJECT: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road (name, address) TO (Owner) F CITY OF COPP~rJ,, TEXAS P. 0. Box 278 Coppell, Texas 75019 / CONTRACTOR: L. H. LACY COMPANY P. 0. Box 541297 Dallas, Texas 75354-1297 ARCHITECT'S PROJECT NO: CONTRACT FOR: Construction CONTRACT DATE: May, 1988 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the FIR]~EN'S INSURANCE COMPANY OF NEWARK, N.J. Plaza of the Americas, 14th Floor , SURETY COMPANY, 600 North Pearl Street Dallas..Texas · 75201 L. H. LACY COMPANY P. O. Box 521297 , CONTRACTOR, Dsll~.s, Texas 75354-1297 hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not CITY OF COPPET,T,, TEXAS P. 0. Box 478 . OWNER, Coppell, Texas 75019 as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set ifs hand this Attest (Seal): 5th da~ of April 19 90 FIREMEN'S INSURANCE COMPANY OF NEWARK, N.J. Surety,/~pan) Si'~'nafur~ of_Authorized Representative Lind~ O' Nale Attorney-in-Fact Title NOTE: This form ,$ Io be used as a companion document to'AIA DOCUMENT C'06, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAi~.IS, Current [dmon AIA DOCUMENT G707 · CONSENT OF SL'RETY COMPANY TO FINAL PAYMENT ° ~'~;HL 19'0 EDITION · AIA~ ONE P&CE ~ 1970 · TH[ AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N'~'r ~: ~$HINGTO'~. D.C. 20(X)6 :. Fizemen's :[rm nce Company of Newm' New Jez'sey 80 Maiden Lane, New York, New York 10038 GENERAL POWER OF ATTORNEY Know all men by these Presents,That the FIREMEN'S INSURANCE COMPANY OF NEWARK, NEW JERSEY has made. constituted and appointed, and by these presents does make, constitute and aplx)int Jerry P. Rose or Linda O'Nale or Juanda J. Holmes or Richard D. Hansen, Jr. or Barry L. Crow all of Dallas, Texas, EACH its true and lawful attorney for it and in its name, place, and stead to execute on behalf of the said Company, as surety, bonds, undartaking~ ~ contracts of suretyship to be given to all obligees on behalf of L. H. Lacy Company provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the aum of Unlim~ ted Dollars. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Reso- lution adopted by the Board of Directors of the FIREMEN'S INSURANCE COMPANY OF NEWARK. NEW JERSEY at a meet- lng duly called and held on the 20th day of Febru~y. 1975. In Wlthasl Whereof, the FIREMEN'S INSURANCE COMPANY OF NEWARK, NEW JERSEY has caused Its official seal to be hereunto affixed and these presents to be signed by one of its Vice Presidents and attested by one of its Asistant Vice Presidents this 3rd day of' January, 1979 FIREMEN'S INSURANCE COMPANY OF NEWARK. NEW JERSEY Attest: By STATE OF NEW YORK. COUNTY OF NEW YORK, On this 3rd day of January, 1979, before me pemonally came M.L. Ford. to me known, who being by me duly sworn. did del~e and say that he resides in Summit, in the County of Essex, State of New Jersey, at 768 Springfield Avenue; that he is a Vice-President of the FIREMEN'~ INSURANCE COMPANY OF NEWARK, NEW JERSEY, the corl~orstion described in and which executed the above inatrumen~, that he knows the seal of the said corlx)retiee; that the seal affixed to the said instrument is such corDorete leal; that it was Io affixed by order of the Board of Directom of said corporation and that he ligned his name thereto by like order. CERTIFICATE EIHEL TAnANTO NOTNW PUBLIC, Stale of New Ymk NO. 24.4663t17 Qual. in I[inOs Cool~ Cemmi.ien Expire Ma'ch 30. 196B. I, the undersigned, an Assistant Secretary of the FIREMEN'S INSURANCE COMPANY OF NEWARK, NEW JERSEY, a New Jersey corl~orstion, DO HEREBY CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore that the Resolution of the Board of Directors, set forth in the said Power of At- torney, is now ~n for'ce. (lily of _~pril . ~ ~ Signed and sested at the City of New York. Dated the 5th lS 90. the professional services agreement in the amount not to exceed $?,100. Following discussion on this item, Councilman Smothermon moved that the above stated agreement be approved in an amount not to exceed $7,100. Councilman Morton seconded the motion; motion carried 6-0 with Mayor Pro Tem Wilkerson and Councilmen Weaver, Thomas, Morton, Cowman and Robertson voting in favor of the motion. Item 12: Consideration of a variance requested regarding parking lot paving at the School Mockingbird Lane site. from Coppell I.S.D. Coppell Elementary Mr. Larry Davis, representing the Public Works Department, Engineering Division, made the presentation to the Council. This request is the same as a previous request from the School District for the reduction of concrete paving from six inches to five inches in the parking lot and light traffic areas. During discussion on this item, staff was requested to review current ordinances for possible amendments of City requirements as opposed to variance requests appearing on Council agendas. Following further discussion, Councilman Smothermon moved that the variance request from the Coppell I.S.D. for reduction in concrete paving requirements from six inches to five inches in the parking lot and light traffic areas at the Coppell Elementary School, Mockingbird site, be approved. Councilman Robertson seconded the motion; motion carried 6-0 with Mayor Pro Tem Wilkerson and Councilmen Weaver, Thomas, Morton, Cowman and Robertson voting in favor of the motion. Item 13: Discussion and consideration of Change Order No. 5 for the Denton Tap Road Improvements project from Sandy Lake Road to Denton Creek and authorizing the Mayor to sign. city Consulting Engineer Representative John Karlsruher made the presentation to the Council. Mr. Karlsruher was recommending approval of Change Order No. 5 in the amount of additional costs for $36,000 and addition of 75 days to the contract. Following discussion on this item, Councilman Robertson moved that change order No. 5 for an additional $36,000 plus 75 days to this contract be approved. Councilman Cowman seconded the motion; motion carried 4-2 with Mayor Pro Tem Smothermon and Councilmen Weaver, Cowman and Robertson voting in favor of the motion, and Councilmen Thomas and Morton voting against the motion. Item 14: Discussion and consideration of approval of L.H. Lacy Co.'s Application for Final Payment for the construction of Denton Tap Road Improvements from Sandy Lake Road to Denton Creek. Consulting Engineer Representative John Karlsruher of Ginn, Inc. made the presentation to the Council. Staff is recommending final payment to L.H. Lacy Company in the amount of $131,448.49. Following discussion by the Council, Councilman Robertson moved that final payment in the above stated amount be made to L.H. Lacy Company for the construction of Denton Tap Road improvements from Sandy Lake Road to Denton Creek. Councilman Cowman seconded the motion; motion .carried 4-2 with Mayor Pro Tem Smothermon and Councilmen Weaver, Cowman and Robertson voting in favor of the motion and Councilmen Thomas and Morton voting against the motion. Ite~ 15: ~Discussion. and consideration of approval for L.H. Lacy *Co.'s Application for Final Payment for the construction of the Denton Tap Road Improvements project from Beltline Road to Sandy Lake Road. Consulting Engineer Representative John Karlsruher also made this presentation to the Council. Staff is recommending approval of final payment in the amount of $230,989.10. Following discussion, Councilman Robertson moved that final payment in the above stated amount to L.H. Lacy Company for construction of the Denton Tap Road ~ge 4 of 10 improvements project from Beltline Road to Sandy Lake Road be approved. Councilman Cowman seconded the motion; motion carried 6-0 with Mayor Pro Tem Wilkerson and Councilmen Weaver, Thomas, Morton, Cowman and Robertson voting in favor of the motion. Item 16: PUBLIC HEARING: To consider approval of a zoning change, Case $PD-112, Channel Pointe Addition, from (SF-O) Single-Family-O, to (PD-SF-O) Planned Development Single- Family-O, located at the southwest corner of MacArthur Boulevard and Parkway Boulevard, at the request of Mr. Rick Sheldon. Director of Planning and Community Services Gary Sieb made the presentation to the Council. Mr. Sieb stated the Planning and Zoning Commission is recommending approval of the zoning change with the condition that there be no front fences allowed and that the wor~s "Private Street" be stricken from i (A). The ~D designation has reduced .the total ,,mher o~ _lots in _t.hl~ development from the original 71 lots t~ 43 lo~st _Mrj. RiCK Sheldon, representing the ~pplicant, was a£s~ p~ese~=~o ulsters this item with the Council. Mayor Wolfe ~eclarea r_ne public hearing open and asked for those persons who wished to speak in favor of the proposed zoning change; there were none. He then asked for those persons who wished to speak against the proposed zoning change; again, there were none. The public hearing was declared closed. Following discussion by the Council, Councilman Cowman moved that the zoning change be approved with the condition that no fences would be allowed in the front yards and that the words "Private Street" be stricken from 1 (A). Councilman Robertson seconded the motion; motion carried4-3 with Mayor Wolfe, Mayor Pro Tem Smothermon and Councilmen Cowman and Robertson voting in favor of the motion, and Councilmen Weaver, Thomas and Morton voting against the motion. Item 17: Consider approval of a request to vacate the previously filed final plat for Channel Pointe Addition, and approval of a final plat resubmittal for same, located at the southwest corner of MacArthur Boulevard and Parkway Boulevard, at the request of Mr. Rick Sheldon. Director of Planning and .Community Ser¥ices Gary ie _mape .the presentation to the Council. The Planning and Zoning commission has recommended approval to vacate the previously filed plat and to approve the final plat as submitted with the condition that fences not be allowed in the front yard and that the words "Private Street" be stricken from i (A). Mr. Rick Sheldon, representing the applicant, was also present to discuss this item with the council. the Homeowners Mr. Sheldon indicated that he did not feel . Association for the Lakes of Coppell would approve fences.being built in the 15 foot rear yard easement and ~t sometime In the future the Homeowners A~sociation will maintain the lake ~,~,, a~,~,~,~on on this item, Councilman Robertsonmove~.~na~ · '~ ..... ~ ....... 7-- - · -- ..... ~-~- -~lon be the previously filed final plat zor cnannez moznu~ vacated and that the final plat .a? su]mmitted at this Council meeting be approved with the condition that front fences not be allowed in the ,front yard and that the words -Private Street" be stricken from I (A)..Mayor Pro Tem Smothermo_n se~_onded.t?emoti~! motion carried 4-3 w~th Mayor Wolfef Ma~or Fro Tem Smo~ne..r~on councilman co--n and RobeSon voting rton vo~ln a alns~ ~ coUncilmen Weaver, Thomas and Mo g g Item 18: Director presentation to the Council. Consideration of a request to change ~he name of SoUthwestern Boulevard to Gateway BouleVar~ along a portion oft he existingSouthwesternBoulevard, beginning at the intersection of Beltline Road and extending west to Freeport Parkway. of Planning and CO~unity Servl~ Gary Sieb ma~e t~e Santa Fe Paoific Realty, has