Villages of CC P4-CS 930525COPPELL PUBLIC WORKS DATE: TO: FROM: RE: May 25, 1993 Garreth Campbell, Construction Inspector Howard L. Pafford, Utilities Superintenden~ Walk-Through Punch - List for ~Cgtton Wood Ch ~ek Estates Phase IV (Water/Sanitary Sewer) All problems have been corrected with the exception of the following: 1. Sta. 10 + 20.28 - No rise from cone top. 2. Sta. 0 + 00 Line B - No rise from cone top. 3. Sta. 0 + 00 Line C - Repair inflow into manhole invert. 4. Matheson Drive - Mainline valve under concrete. Additionally, there are two (2) manhole connections on this project that are improperly installed. All connections to existing manholes must be core drilled and sealed with cor-n seal and blocked with concrete. The two connections that were made on this project fall to meet these standards; therefore, it is necessary to excavate and pour in 3 feet x 2 feet concrete encasement on outside of connection. It will be necessary to stabilize this blockou, t and have construction inspector inspect the repair. Please ensure that each of these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP/dm cc: Steven G. Goram, Director of Public Works COTNWOD2HLP DATE 88/85 TIME 10:33 MESSAGE TX-TIME 00'4~" CONF I RMAT I ON DATE: 08?05×93 ID: DISTANT STATION ID MODE 214 ~9~ 8948 G3-S PAGES 002 TIME:lO:34 RESULT OK The City With A Beautiful Future P. O. Box 478 Coppell, Texas 75019 PUBLIC WQRK~ DEPT~ 732 DEFOREST RD. P.O. BOX 478 COPPELL, TEXAS 75019 FAX # (214) 393-7648 FAX MAIL COVER PAGE PLEASE DELIVER PAGES FIRM: DATE: FROM~ FAX ~ OUR FAX# 214-393-7648 TRANSMITTED BY: NUMBER OF PAGES (INCLUDING COVER SHEET). *If you do not receive all of the pages, please call back as soon as possible. Telephone No#(214) 462-8495 and ask for person sending this fax. COPPELL PUBLIC WORKS MEMORANDUM DATE: May 20, 1993 TO: Garreth Campbell, Construction Inspector FROM: Howard L. Pafford, Utilities Superintendent RE: Walk-Through Punch - List for Cotton Wood Creek Estams Phase IV (Water/Sanitary Sewer) As you are aware, staff performed a walk through on the above referenced project on May 19 and 20. Below I have listed the punchlist items identified for this project: * .-~. Sra. 4 + 64.60 - Manhole has no rise from cone top. ~ta. 0 + 00 Line D - Manhole lid stuck. ,-~.,--Sta. 4 + 41.81 - Manhole has no rise from cone top. ~ Fairview - Middle of Street - Flare leaking. --~e-,Sta. 2 + 47.61 - Manhole needs chimney seat. -6..- Matheson Drive - Meter setter leaking. - 7. Matheson Circle - Meter setter leaking. ~ Sta. 0 + 00 Line G - No rise from cone top. -~Sta. 8 + 12.90 - No rise from cone top. Sta. 10 + 20.,28 - No rise from cone top.-~ g.e.~ i'X~,~ ~ Middle of Graham Drive - Sewer cleanout needs t'~working. ~ Bfickell - Paint MCV cap. ~ Sta. 7 + 25.81 - No rise from cone top and no chimney seal. ~Sta. 2 + 95.12 - Replace meter can. Drexel Drive, near drain - Water service has no water~ ~- Bfickell Circle - Clean out needs to be reworked. 5 Sta. 0 + 00 Line B - No rise from cone tOl:~.-~c~ ~o~ ~, q-'e~ ~ 00 Line B - No rise from cone top. (~ Sta. 0 + 00 Line C - Repair inflow into manhole invert.- ~t[I ~ Fairview Circle - Need to replace meter setter. ~ Fairview Drive - Raise fire hydrant. * 4~. Sra. 4 + 52.92 - No rise from manhole cone. Make sure all cleanouts have plugs on end. Sta. 3 + 60.47 - Manhole chimney seal needs refitting. Sm. 3 + 16.37 - ManhOle needs chimney seal. Sheffield Court next to manhole - The sewer cleanout needs reworking. Sra. 0 + 00 Line J - Manhole needs chimney seal. Walkthrough PunchtistdCottonwood Creek Page 2 ~ Fairview and Parkway - Bring. mainline vaive~_e~tto grade~__~ Sta 0 + 00 Line D - Grout manhole ring,Cul~tall chimney seal and set rainp~-'~ Matheson Drive - Mainline valve under eonerete. -8-r. Sta. 0 + 00 Line tt - Grout incoming pipe. I had discussed these items with the contractor and these manhole rings can be sealed with ramneck seal and then grouted. Additionally, there are two (2) manhole connections on this project that are impwperly installed. All connections to existing manholes must be core drilled and sealed with cor-n seal and blocked with concrete. The two Connections that were made on this project fail to meet these standards; therefore, it is necessary to excavate and pour in 3 feet x 2 feet concrete encasement on outside of connection. It will be necessary to stabilize this blockout and have construction inspector inspect the repair. Please ensure that each of these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP/dm cc: Steven G. Goram, Director of Public Works COTNWOOD.HLP Phone ~,,m~er: (~) Activity Code: Personnel Reporting: "- Meter Leak . Meter to be picked up Locate Date/Time , Accuracy Test If Meter/Servi=e Leak: Classify - Ci=y: If City Leak - Describe Repair: Water Lost(Estimate): GPM Was Water Metered: Yes No Was Customer Notified: Verbally If Meter Change Out Old He=er 3: New He:er J: Old Reading: New Reading: Old Me=er Size/Type New Heter Size/Type Purpose for Changing Meter: Days To=al Gallons Door Knocker Vehicle/Equipment Used Unit $ Miles t HRS co~ents Fro~ Field: If mainline or deep service repair, describe type of pipe or service line condition~ Ha~hoursl Vehicle/E~uip.coet: List Materials Used: LabOr Cost: Material Cost: Total WKORDER