ST8201-CS 900222COPPELL PUBLIC WORK~
~ORANDUM
February 22, 1990
John Karlaruher, Project Managek-~ Ginn, Inc.
Dana Kamp, Signs/Signalization Technician~.~..
Denton Tap Walk Through Punch List Items
The following are the list of items needing to be addressed:
{Dairy Queen North to R X R Tracks)
5.
6.
7.
Clean epoxy right lane Mobil car wash drive.
Clean epoxy 8th skip line north of Belt Line~Belt Line intersection
northbound left land Ist button.
Clean epoxy 9th skip line north of Belt Line intersection northbound left
land 4th button.
Clean epoxy between 9th and 10th skip line same as #3.
3rd 6" jiggle bar let turn lane has broken corner northbound.
Clean epoxy after lOth skip lines all lanes northbound same as #4.
Check ap,o's on R X R R's for size TMUTCD requires minimum 6' 6"- 5'
installed.
Tracks South to Dairy Queen)
4.
5.
6.
7.
8.
Clean epoxy/concrete from button 2nd skip line south of R X R tracks right
lane 4th button. Reflector covered.
Clean miscellaneous temporary yellow type markings 13 to skip lines south
R X R tracks right lane.
Missing two buttons 22nd skip line south from R X R tracks.
Broken jiggle bar 4th in turn lane at Belt Line & Belt Line.
8th jiggle bar broken.
10th and llth jiggle bar broken.
Level traffic pull box middle median southbound side.
Add more gravel pull box middle of median Belt Line & Belt Line.
{Bridge South to R X R Tracks}
13th skip line south of bridge right lane southbound two buttons broken.
(Replace).
Check spec's on R X R R markings for height TMUTCD requires minimum 6' 6" -
5' installed.
Raise both pull boxes south end median south of Bethel
Raise pull box (2nd) south of Bethel in median southbound.
(R X R Tracks No~-thbound to Bridge)
Broken Jiggle bar Ist turn lane south from tracks 4th one.
Epoxy did not harden at same location %1 Redo jiggle bars.
Broke jiggle bar let bar on at Bethel - Replace·
Add gravel pull box by bridge southbound next to gusrdrsil.
(Bridge to Bethel School)
2.
3.
4.
5.
6.
Put gravel in pull box northbound bridgo median next t~ guardrail.
Put gravel in pull boxes (2) median north o~ Meadowcreek.
Broken button northbound 18th skip line from bridge right lane.
Broken button northbound 24th skip line from bridge right lane.
Raise and level pull box center of first median north of bridge.
Broken pull box south end 2nd median from bridge.
(Bethel School South to Bridge)
1. Remove epoxy 31st skip line south from Bethel School next to bridge, right
lane.
2. Remove epoxy 32nd kip line south from Bethel School next to bridge, right
lane·
3. Broken jiggle bar 1st bar 2nd median turn lane southbound.
4. Redo epoxy on buttons circled on diagram 20 in all.
(Bethel School North to Braewood)
Raise and level pull boxes 1st median north end.
Raise and level inside pull box 2nd median south end.
Raise and level inside pull box 2nd median north end.
(Braewood SoutJ~bound to Bethel School)
2.
3.
4.
5.
Remove epoxy Ist skip line left lane·
Remove epoxy 2nd skip lane left lane.
38th skip line from Braewood southbound broken button, right lane·
Remove epoxy 47th skip line southbound from Braewood.
Last jiggle bar north epoxy did not set-replace, turn lane Bethel School·
(BraewOod Northbound to Sandy Lake)
I. let skip line broken button, right lane northbound.
2. 3rd skip line broken button/reflector right lane northbound.
3. 8th skip line broken button/reflector left lane northbound·
4. 12th skip line broken button/reflector right lane northbound.
5. 14th skip line broken button/reflector right lane northbound.
6. 17th skip line broken button/reflector right lane northbound.
7. 20th skip line broken button/reflector right lane northbound.
8. Remove epoxy 27th skip line center lane northbound·
9. Raise and level pull box ist median 2nd from north end.
10. Raise and level inside pull box 1st median south end by Braewood.
11. Broken jiggle bar 4th from turn lane start at Sandy Lake
(Sandy Lake Southbound to Braewood)
No Deficiencies
If you have any questions or need further information, please contact me at
462-8495.
DFK/bb