ST8201-CS 880927.(;INN, INC. Septe~ber 27, 1988 CONSUIiI'iNG ENGINEERS Mr. David M. Snyderj P.E. L.H. Lacy Company 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 Re: Denton Tap ~oad Improvements from Belt Line Road to Sandy Lake Road from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Snyder: The purpose of t~is letter is to update the status of Field Extras for the project. For this purpose we are attaching a Project Field Cha~lge Sulamary which lists each Field Change, its cost, pertinent drawings, and general status of the item. Forths record we would like to address the following items: This item consisted of replacement of 73.66 Lf of the existing 12# VCP sanitary sewer (crossing the project centerline at approximately station 114+38) with 12# DIP. The replacement of the existing pipe was necessary due to the poor condition of the pipe. We have requested a breakdown of the $ 6,240.00 L.S. price quoted in the July 13, 1988 letter from L. H. Lacy Co., copy attached. To date we have received no response. This item has been established to eliminate any splices in existing water services which would be located under the proposed pavement. We have no objection to L. H. Lac~ Co.'s proposal for~ithis item which is contained in the July 13, 1988 letter,~copy attached. This item consists of the installation of an S" valve in the existing 8# ~ater line, at paving station 97+30, in order to eliminate night lowereings of the existing 8" water line at several stor~ sewer laterals. Because of the fact that the st~bsequent water line lowerings were accomplished during the day the Citybenefits from a better quality of installation and the elimination of several line shutdowns requiring attention of City personnel. L. H. Lacy Co.'s August 9, 1988 proposal for this work, copy attached, is acceptable. 17103 Prt~'~lon R~mtl · ,%uilc I110 · I.B I Ig · Dallas. 'l'cxa~ 7524~ · Phone 214/24~-4')(X) This item was generated by our field representative's observation t~t one of the proposed pipe supports for the proposed exten~ion of the existing 12u Sanitary Sewer Aerial Crossing might be eliminated by repositioning the other five proposed pipe supports. To date we have not received a response to OUr letter of 8-18-88 requesting a proposal from L.H. Lacy Col for a reduction in the L.S. bid price for Pay Item 582.14. This ite~ originated with L. H. Lacy Co.'s discovery that the existing SS water line was not located where indicated on the plane, but instead was in conflict with storm Sewer line ubs. We rejected L. H. Lacy Co.'s original proposal in this matter, due to technical reasons, and we have not received a new proposal at this time. In order to ~acilitate a slightly different construction sequence than:~that originally suggested in the bidding doctuaents, L. H. Lacy proposed an alternative plan for the use of portable concrete traffic barriers and barrel guard rail in the letter of August 16, 1988, copy attached. We have no objection to this proposal. This field cha~ge consists of the addition of a 6" valve in an existing Wa~er line in a location where "as built" plans indicated one would be located for isolation and repairs. Installation of the valve as proposed is necessary for the proper installation of the improvements proposed under the Contract. This item is addressed in the August 29, 1988 letter, copy attached. We have no objections to this item as proposed. This ite~ was ~proposed in the letter of September 2, 1988, copy attached. It provides for the installation of a 2" water service tap on the existing 16" water line located on the east side of Denton Tap Road. This proposed 2" service replaces a poorly installed existing water service which is composed of four 1" services which are combined into a manifold at the service end. We have no objection to this item as proposed. We trust that the above accurately reflects the state of Field Extras associated with this project. We ask that you respond promptly to those items identified above as needing a response. If you have any questions pertaining to the above, please call me. Sincerely, John C. Karlsruher, P.E. Project Engineer jk/JCK attachments cc: Russell Doyle, P.E., City Engineer, w/attachments H. Wayne Ginn, P.E., w/attachments Randy Fleming, w/attachments J378 (j378fcap) NO. DENTON TAP ROAD IMPROVEMENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD CITY OF COPPELL, TEXAS PROJECT FIELD CHi~NGE Description/Status Miscellaneous drawing revisions Dwg.(s) Est. Cost See ($56,648.29) 6-16-88 Contract Set 2 4 Repair of existing 12" S.S. at St~. 114+38 Status: Awaiting breakdown of costs. Work is complete. Realignment of storm sewer "A" to avoid conflict with 8" water line. Status: Work is Complete. Relocate water services (up to 50' in length and up to 2" in diameter, matching existing materials) Status: None required to date price is acceptable. Installation of one 8" valve at paving station 97+30 to isolate the water system and allow the water line lowerings for storm sewer laterals A-4, A-5, A-6, A-7, & A-8 to be done during the day. Status: Installed at station 97+30 +/- on west side. Price acceptable. Reduction of pipe supports from 6 to 5 for the extension of the 12" S.S. aerial crossing at Grapevine Creek. Pay Item 582.14 Lump Sum. Status: No response to 8-18-88 letter requesting price reduc- tion. n/a $6,240.00 proposed 42/102 per unit marked prices in Contract n/a $800.00/EA n/a $775.00/EA 57/102 rev. 1 8/18/88 7 8 9 10 8" water line relocation from sta. 121+50 to 123+50 to resolve conflict with storm sewer line "B". Status: Initial proposal from L.H. Lacy Co. rejected; no new proposal received as of this date. Reduction of 320 LF of portable concrete traffic barrier (Pay Items 512.1 and 521.3); and replacement of 1300 LF of move and reset portable concrete traffic barrier (Pay Item 512.2) with 1525 LF of Barrel Guardrail. Status: Acceptable. Work in progress. Installation of one 6" valve at Meadowcreek Dr. to isolate the water line lowering for storm sewer line "B" and help resolve a conflict with the 8" water line in Denton Tap Rd. Status: Price acceptable. Work complete. Installation of 2" service tap on the 16" water line in order to eliminate the four 1" manifold services for the Baptist Church. Status: Price Acceptable. Work Complete. n/a n/a n/a n/a $51.00 $715.00/EA $1,400.00/EA LETTEF; 3F TRANSMIT] AL DATE: TO: ATTN: RE: PROJECT: JULY~.'~' 1988 G1NN. iNC., CDNSULTIN6; ENGINEERS 17105 PRESI'ON ROAD SUITE ]00. LB-118 ~ ~',,.- ~..i:~ .~, .... ' * . JOHN C. KARLSRUHER? P.E.? RANDY FLEMING FIELD CHANGE # 4 ~Er~TON TAP RDAI~ IMF'RDVi'MENT FROM f';ELT ,...IN,. T[' SANDY LAI":E q'>" "'-' OR SANDY LAKE TO DEI4TON CREEK (t..)l.~)" ~' L. H. LACY WILL ANY RELOCATE ANY WATER SERVICE AS REQUIRED TO AVOID STORM SEWER CONSTRUCTION INTERFERENCE AT THE FOLLOWING PRICE: RELOCATE WATER SERVICE PER EACH $800.C)0 PER EACH THE "'"~"- ' ..~,O..E PRICEW.~"~' ~DVEE THE F'DLLO~CIN~: 1; -O,N ..... O,q,=, WILL NOT BE MADE UND~.R ~'"P- 2) M-,,IMUM PI~E ~OR RELOCATION TO BE = ['='~ cr~ .., ' ~U, , ~I~ IS 5C ' ~ ANY F IPE MATERIAL MATCHINS EXZSTIi'4G ~AT[,-qlAL UF' ~'D AND INCLUDING 2" SER~;ICE SIZE ~A,i, M SNYDER,-.:'.E. PR[:JJ E£:T MAr,Ao=R CHECKED JUL ! L H. Lacy Company General Contractors 214/357-0146 10888 Shady Trail AO. Box 541297 Dallas, Te~l~l '75354-1297 REPORT OF FIELD CHANGE INSTRUCTIONS SPECIAL REPORT NO. .AGE .~OF / "AGES DATE CROSS RE~ERENCE TO DALLY REPORT NO REFERENCE DATA SPECIFICATION SECTION No PAGE NO DRAWING NO EhTITLED SKETCH No.. DATED ENTITLED PARAGRAPH NO. DESCRIPTION 1. DETAILED IDENTIFICATION OF THE PROBLEM 2. DETAILED SOLU¥10N PROPOSED OR ACCOMPLISHED IS THE PROBLEM AN ISOLATED CASE OR GENERAL;' SUBMIT SKETCHES AS NECESSARY , TITLE DATE: TO~ ATTN: RE: 3ULY 1~, 1~88 LETTE~ OF T~AN~M!TTA% 8INN, IN=., CDNSULTINS ENGINEEHS 17105 PRESTON ROAb SUITE 100~ LB-11B 3DHN ~. I(AR|..SRLIHE. F~., P.E. SANITARY SEWER IMPORVEMENT AT APPROXIMATE STATION 11~+50 DENTON TP.P ROAD IMPROVEMENT FROM BElT L~'NE TD ~AN~¥ LAI:E L. H. LACY NILL IMPROVE THE SANITARY SEWER PER THE FIELD CHANSE ATTACHED AT THE POLLOWINB PRICE: IMPROVE SANITARY 8EWER LUMP SUM $6240.00 PF:OJEE~'T MANAGEr,~ L H. I-nay Coml~ny General Contractors 214/357-0146 10888 Shady Trail P.O. Box 541297 Dalla~Te.X.~l~75354-1297 :" : L~ATION:';' ~.~. ..:';-'d~ .'~.' DATE ~ ......... , ~, . ~OSS ~E E~ENC~ TO ~ DALLY REPORT NO. .- 2. The ~u~: ~l~. ~ ~H. ~ wMd M M ~ ~ ~ mW, ~ REFE~ENCEDATA , '~ ~.~ .,. -: · - · . .. ~ .~'! - ~: ::~ . .,* .- . * SPECIFICATION SECTION N0, ~GE NO. · , ....... PARAGRAPH No. "' ' ' DRAWING No. .* ~'; *': - ENTItLeD" '-: ' · '-: "' 'SKETCH No. , ',~ -: ~ 'DATED .... · DESCRII~TION,; '..., , , ~ '~,..~' . . . 1. : . O~TAILED IO~=NTIIIIC~Ti0N 0~.THI~ PROIII. i~M "'- .~':v-(~/M :;/~ ~ ~. ~ ~ /~,~, .~ .:~ ~,~ .... .. ....... ,.. ,-~';, ..,.* . ~.. , , . , . ..,: . · .~ ... ._. . ~: ...... ~.., ....... 2. ~ . OE~AIL~O~LU~ON ~OSEDOR ACC~PLISHEO' ' :, .*~;~*, '* :,;, :" , ,', , . . . , ..... "" '('e '" ,~..-, ..... ~ . , · .,$ / - ~, ,, , .. ,~, ,:,,. ., ~ , ~ '1 DAlE: I'0: IRANSMI]TED: Al'IN: PROJECT: C£~NTRAC TOR: RE: LE1TER OF TRANSMII-'IAI_ BY L. H. LACY COMI:"ANY AUBUS'I 9? 11~8~ iiJlt'xlN~ ll~q. ? CON'~ULFING SU~ f'E 10£)~ LL~~-i 1~ DALLAS ~ ~EXAS 75248 TO GINN~ /NC, FIELD OFFICE RANDY F'LEM~N~ DENTON TAP ROAD IMPROVEMENT FROM BELT L.INE 30 SANDY LAKE PROPOSAL ¢0Q12~ L. H. LACY COMPANY REQUESF FC)i~ FIELD CHANGE T'O INSTALL AN 8" VALVE [U IS[IL. AI'E WATER SY~I'EM 'TO MA~:tE NAIER LINE L.OWL:RINGS Al- CONF:LiCI LOCATIUN~ WITH STORM SEWER LATERALS A-8, INSTALL ONE 8" VALVE lEA ~775.0(.~/Ei.A THIS VAI.VE ]'O L{E LOCAl'ED ~ PLACE Dt:-I"ERMINED LcY THE AND [HE OWNER' S REPRESENYATIVE. 'THANK-YOU ~OR YOUR CONSIDERA'~ION IN THiS RESPEC' I"FUL.LY , DAVID M. SN¥'uER~ F'.E. PROJEC F MANAGER L. H. Lacy Company General Contractors 214/357-0146 "Oualily Conslruclion lot over 65 Years' 10888 Shady Trail P.O. BOx 541297 Dallas, Texas 75354-1297 ,q T 'I'N: t-:'[:(0,:,1 [Z C 1 .: TOP: L..I£TTER OF: PF<OP(:JSF&_ L. t"1. L~'-~[;Y COMI':'ANY AUGLIS'I 16, 1 JOHhl K~4F(L.'LiRLIHF-iq ~ F::'. E. I)EIxlILJN IFil:' t-kLI¢~D ]:MPI:<OVEf'iE:N-I' I-:.'H~OM Lqi:.Ll' L...IIxlE:: ICI S¢~NDY Ll.:li:.L. H. LACY COl'IF'ANY S'fAG-'INU) OF F'ORFABL. E Eu-:fi-dRIEIR FOR F:'HAE~E I WI.]~-,:I<. L_. H. L_¢.~I]Y PROP(]ESES THE FOLLOWING IN [JRDE[< IO F:'ROV]:DE' ~.'~ PAVING OF'EI~¥1'IIjNS 'f'HE FULL LENGII.I OF THE OCJB: 13t:( I iS I Ni4L [;ON[ RISC I' -ICITAL iN C)I:~IEJ]:Iq¢~L_ CONfRAC;T ~i :} &. 1 ,'::':S. Oi.) [-'F(tJF'CJSE: D 2'730 LF PORTAEIL. E: BI:~RRIER ~ 2730 Lf: I:,:E:FILiVE BAF,:FC[ER ;]) '[[ll"Ai_. F.'ROF'CiSISD ~d_TEfkNATE $15.90/LF :ii 5. :],()/LF s~ ,?. OQ/L.F 407. L H. Lacy Company General Contractors 214/357-0146 "Quality Construction for over 65 Years*' 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 THE F'R[)F'OSED I~ARREL GUARDR('~IL WIL. L I4~:i: PU'f ,6/1' 'THE: I:::[.)L. Ltit',l[l',lG SI'AT'IONS: 1:2;05'00 fO 151425 152+50 TfJ 145+50 1594'00 78 'T'HE£ PORTABLE BARRIE;R WILl_ DE PUT A"I THE FOI..LON:[NG SIA'IlONS: 89+82 TO 97.+.62 1()0+50 t'[) 1()5+9~.! 1 ~.24'00 'tO 126+10 I)A] I-: [ L): A] 1N: PROJEC1: [;ONTRA[:T rdF~: dOHN t;..ARL~RUHER~ F'.E.~ RANDY FLEMINM DENT[IN -JAP ROAD 1MPROVLMENI F'MUM BELl LiNE lb SANDY LAK. E PROPOSAL ~. H. LACY COMPANY HEQUES'T FOR FIELD CHANGE TO INSIALL. ~ ~." VALVE: TD 1SOLAI-'E ]"HE WA]ER SYS'i'[_:.f'I 'lO MRi::.E. WA"iE.I-,: i..],NE L_UWE~-<iNG ~:-~] [.UNFLi[;'i L. UCAT'ION WiTH STOR~ SEWER LiNE B [)F'F:'OS]]'E MEADC)W~REEE.. AND TO PIELI:' PROSE[JUl'E: THE: LAYING [)F -If-iE ¢:,* X o* B(]X CL~L',2E[Ci ]N ]HIS AREA A-I- -[HE FDLLO~IN6 PRICE: HE f~JYJl~JEl:(" i:, FEEH:<E.E;E.I,4 i A; i VE_. L. H. Lacy Company General Contractors 214/357-0146 "Quality Construclion lot over 65 Years" 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 LCY J .... H. Lt4L;Y LJLJI~Ii"I~NY DEN 'II.)N 'l I"'I',:I.)P L]t~ A'~L L. H. Li-~L2T' L~LJr'H-'ANY I:: NI31 ?. ~::. ~ I-<,qNI.)Y J- L.kil]-llNIJ II'ql.'l..,:lJVEFil-:.l'.tl I:.I'<LJI'q LIJ~EI._I LINL: ILJ ',UI:-'d,IDY h.:L:.t~l-'J::iL: i I-:LJL L.Y ? L)iaV~D Iq. t:~lqyI)l::.J-% L. H. Lacy Company General Contractors 214/357-0146 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 TO Coppell, Texas 75019 ~" Coppell, Texas WE ARE SENDING YOU ~ Attached vio~t~,g~,~;~the following items: [] Shop drawings [] Prfots [3 Plans [] Samples [] Specifications ~ffi Copy of iMter [] Cl~n~e order iq coM~s ~t .o. ~scm~,o~ 1 9-27-88 n/a L~tJ~r fro~ Ginn. Inc. to L.H. lacy CO. THESE ARE TRANSMI1TED as checked bMo~: ;-I For approval ~(For your use [] As requested [] For review 8nd comment [] FOR BIDS DUE. r~ Approved as submitted [] Approved as noted i-I Returned for corrections [] 19 [] Resubmit [] Submit [] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US REMARKS .~,a~O~ Of this letter is forwarded hermeith for your inFnrmtion: files: there iffco ne~d for any acti. on your~part9 Call nm if .v~ have questions. $ohn C. Karlsruher, P.E.