Loading...
ST8201-CS 890615GINN, INC. CONSI!I;I'ING ENGINEERS June 15, 1989 Mr. Scott Balch, P.E. L.H. Lacy Co. .. ~;.....__~ ~ P.O. Box 541297 Dallas, TX 75354-1297 L Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road Dear Mr. Balch: During the Wednesday, June 7, 1989 thunderstorms in Coppell, our resident project representative noticed that an earthen embankment constructed by your bridge sub-contractor in Grapevine Creek, downstream from the east bridge structure, had not been removed as previously requested. You are hereby directed to have this obstruction to the flow of Grapevine Creek removed as soon as possible unless you can demonstrate that it is still vital that it remain in place for further use in construction of the Grapevine Creek bridge structure. In its current condition, this embankment poses a threat to the property adjacent to the creek due to its aggravation of the current flooding. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer JCK/dsp Larry Jackson, City Attorney H. Wayne Ginn, P.E. Randy Fleming File 378 171031hcst[m Road * Suite I1)0 · IBII8 * I)all:*s,-lcxas75248 · I'h(mc214'248-'190(I