Loading...
ST8201-CS 890601GINN, INC. June 1, 1989 Mr. Tim Br~cheau T.U. Ele~ric 14400 J~sey Lane P.O. ~Ox 819061 Farmers Branch, TX 75381-9061 CONSULTING ENGINEERS Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road; and from Sandy Lake Road to Denton Creek Coppell, TX Dear Mr. Brancheau: We received a letter from L.H. Company, partial copy attached, requesting our help in expediting the relocation of T.U. Electric's facilities which are in conflict with the construction of the abovementioned City of Coppell Capital Improvement project. As the Project Engineer for the City of Coppell on the subject project, we request that you proceed with the necessary relocations as soon as possible. As in our past experiences with T.U. Electric, we are confident that you will once again put forth your best effort in helping to bring about the successful completion of another city of Coppell Capital Improvement project. If we can be of assistance in matters concerning this and other C.I.P. projects, please call me. Thank you. Sincerely, John C. Karlsruher, P.E. Project Engineer JCK/dsp cc: Russell Doyle,' P.E. w/enclosure Scott Balch, P.E. H. Wayne Ginn, P.E. w/enclosure Randy Fleming w/enclosure Files 378/379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 MAY 24, tg~a GINN. INC. ~ CONSULTING ENGINEERS 17105 PRESTON ROAD SUITE lO0, LB-118 DALLAS, 'TEXAS 75248 ATfN: JOHN C. KARLSRUHER, P.E. RE: DENI'ON rAP ROAD 1MPROVEMENES PROJECT'S ;378,.~ 579, T.U. ELECTRIC'S POWER POLES IN GRADE DEAR JOHN, L. H. LACY COMPANY YHE FOLLOWING LiSI OF PHASE FROM HIGHEST TO LOWEST PRiORI]Y): REQUESFS OINN, iNC. 'S 1NFERAO]ION WI]Il T.U. EI_ECYRIC ON [I POWER ROLES IN YHE GRADE, ([HESE ARE LISTED APPROXIMATE S;AIlON 118+85 122+00 191~00 116+50 98+50 DESCRIP] ION OF WORK MOVE POLE IN DRAINAGE iI'.ILE[ MOVE POLE IN DRAINAGE INLET MOVE POLE IN MIDDLE OF PARKWAY [*lOVE POWER TO NEW SEI4VICE POLE REMOVE POLE IN NORTH APPHOACH SLAB MOVE POWER '1'0 NEW SERVICE POLE REMOVE POLE IN MIDDLE OF GRADE DOWN GUY IN PAVEMENT POLES & ANCHORS IN SOU'II4 RADIUS POLES POLE POLE 1N DRIVEWAY NEEDS POLE IN DRIVEWAY NEEDS POI_E IN DRIVEWAY NEEDS & ANCHORS IN BOTH RADIUS' IN SOUTHEAST RADIUS TO BE MOVED FO BE MOVED I'D DE MOVED 40+00 DRAEWOOD VANBEBBER FHEL SCHOOL 32+ 89 24 ~00 02+00 BE DONE BLVD APPROACH lO BE MOVED TO BE MOVED L. H. Lacy Company General Contractors 214/357-0146 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297