Loading...
ST8201-CS 890524GINN, INC. CONSULTING ENGINEERS Street Lighting Dear Mr. Doyle: We have been working with T.U. Electric for the last 2 1/2 years in developing and coordinating the design of the street lighting system for Denton Tap Road. The attached correspondence is the result of this effort. The information they have submitted is correct. By accepting T.U. Electric's proposal to use the G.E. Decashield Fixtures in lieu of the Kim Fixtures we will be able to save the City of Coppell approximately $112,647.00. As you can see from the attached "Proposed Budget" this item was originally budgeted for $217,500.00. We recommend that the city of Coppell respond immediately to T.U. Electric's letter by selecting the most desirable form of payment. This is necessary at this time in order to allow T.U. Electric to procure the necessary materials and hire contractors for the installation which hopefully can be completed by the fall of this year. For your information we have attached copies of some post key correspondence dealing with this project. Please call me if you have any questions. Sincerely, Karlsruher, P.E. Project Engineer JCK/dsp enclosures cc: H. Wayne Ginn, P.E. File 384 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 2141248-4900