ST8201-CS 890511"~IELECTRIC l~trict Manager May 11, 1989____~~ Mr. Alan ~a~tliff City o f/tfoppell P.O~ bO/x 478 Cop~l I, Tx. 75019 Dear Mr. Ratliff: Please call Our Customer Services Department has completed its design to provide street light service to your Denton Tap Road Widening project. It is proposed to install double fixture Gg Decashield street lights on 66-Union Metal poles with TU Electric provided foundations- The street lights will incorporate a customer provided and installed conduit system. TU Electric will install the street lights and the foundations for $88,440.00. This represents the difference in cost between the underground facilities you requested and our standard overhead facilities. Please indicate your preferred method of payment for this installation. Security can be provided by offering either Cash in Advance, Escrow, Bond, or a Letter of Credit. Tim Brancheau at 323-8910 if you have any questions about this project. Sincerely, Thomas G. Parsons T~P/TD: rh cc: CI?Y MANAGER John I~arlsruher - Ginn Inc. GINN, INC. CONSUiiI'ING I£NGI. NEEIlS DRAFT PROPOSED PROJECT BUDGET DENTON TAP ROAD IMPROVEMENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD; AND FROM SANDY LAKE ROAD TO DENTON CREEK CONSTRUCTION (6 LANE w/St'd. RAILROAD CROSSING CONOCO PIPELINE STREET LIGHTS LANDSCAPING TRAFFIC SIGNALS RIGHT - OF - WAY ENGINEERING INSPECTION & TESTING TRENCH SAFETY CONTINGENCIES Bridge Rail) 161,131.83 * 206.000.00 40 000.00 217~500.00 213 000.00 170 000.00 100 000.00 443 402.66 154 833.95 26,763.39 367,368.17 * $ 5, $ $ $ $ $ $ $ $ $ $ TOTAL $ 7,100,000.00 (-) TOTAL AVAILABLE CITY FUNDING ($ 4,500,000.00) (=) NECESSARY FUNDING FROM DALLAS COUNTY $ 2,600,000.00 TOTAL AVAILABLE DALLAS COUNTY '85 BOND FUNDS $ 4,250,000.00 (-) NECESSARY FUNDING FROM DALLAS COUNTY ($ 2,600,000.00) (=) REMAINING '85 DALLAS COUNTY BOND FUNDS $ 1,650,000.00 REVISED APRIL 6, 1988 * REVISED APRIL 18, 1988 The estimated construction costs have been revised to include the only TOTAL BASE BID (6 LANE) for each project. Initially this item also included the. Contractor proposed $ 40,000.00 reduction in estimated Contract Price; the alternate bid item for a retaining wall (which is no longer needed); and the additional cost of the Contractor's proposed Alternate Trench Safety System. After further consideration, these costs have been deleted from Construction and added to the Contingencies. 1710.1 I'rt.~lo. R{md · Suite I(X) · I,B 118 · I);dlas, Tcxa.~ 752414 · PI,mc 214/248-4900