Loading...
ST9302-CS 990613F'AX (214,) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 June 13, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project it: ST 93-02 Kimley-Hom Project #: 06940600 DWLI Project #: 98-311F Dear Mr. Griffin: We have completed the twenty utility locates on the DWU water line that were identified by Kimley-Hom. Enclosed for your review is the top of pipe elevation data collected by our field party. Additionally, our field party identified the offset from the centerline of the existing pipe to the back of curb on the median side of the westbound lanes and the depth from the top of curb to the top of the existing pipe. If you have any questions regarding this information, don't hesitate to contact our office. S~t~erely, h E~C~Tu~pany Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER 30" DWU Water Line P~ Coppell Sandy Lake Road Date: 4/27/99 . -. Prep'd By: MGD "-'-'"' Pothole # I STA I Reason ~ Le~/. -roe ~,'. 1 "-~ ~n+nn ~nernl Lncntion Verification s'o'7, z.~ I O~7~ ~z.~ 2~ 14+5~ Lig~oJe ¢.o.z~ 7. 3~ 15+65 ~torm Drain Inlet 4~8.~ 4~ 16+50 ~[ght Pole ~9, ~ .... .,~.1° ~.~ 5~ 21+00 General Location Verification ¢o~&, .... '~ ...... 6~ 27+75 Light Pole ~ ~ ~.. ~ 37.00 General Lo~tion Verification ~]k~ '- ~ 47+00 General Location Verification ~. ~ 9~ -56*00 Light Pole +~,'~o 1~ ~+25 Light Pole e~.7~ ~.,o 11~ 58+00 Light Pole ~I*..,. ,, ~.3o ~ ~'~l 124~. 65+30 Proposed 21" St0~m Drain Lateral ~0¢1~. 13~~ 68+50 Depth of Cover ~. ~ 4.~ 14~¢', 71+00 .Depth of Cover ¢oo. ~ ~.~ ~,~ 15'~. 74*50 Depth of Cove~ ,gz. ~¢ 16,~+~ 82+00 Depth of Cover ~z.~ 17~'; 85+50 Depth of Cover ~o, z~ + ~o ~7.~ 18 ~ 89+00 Southern Curb of No~hsid~ Paving 4~.z~ 19;~ 92+50 Southern Curb of No~hside Paving4~.4~ 20~ 102+00 General Location Verifi~tion ~4 t~ Note: Maximum distance between poth~)le locations is 1000'. 15 of 35 Bid pothole locations available for further investigation pending results of 20 intial potholes. Contractor to notify City and Engineer prior to performing pothole investigations. P:\06108700\wks\pothole xls