ST9302-CS 990613F'AX (214,) 352-3201
TELEPHONE (214) 358-6581
ED BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540787 10605 HARRY HINES
DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220
June 13, 1999
Mr. Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019-4409
Re:
Sandy Lake Road Reconstruction
Coppell Project it: ST 93-02
Kimley-Hom Project #: 06940600
DWLI Project #: 98-311F
Dear Mr. Griffin:
We have completed the twenty utility locates on the DWU water line that were identified by
Kimley-Hom. Enclosed for your review is the top of pipe elevation data collected by our field party.
Additionally, our field party identified the offset from the centerline of the existing pipe to the back of
curb on the median side of the westbound lanes and the depth from the top of curb to the top of the
existing pipe.
If you have any questions regarding this information, don't hesitate to contact our office.
S~t~erely, h
E~C~Tu~pany
Robert D. Weber
Project Engineer
xc:
Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100
Fort Worth, Texas 76102-6803
AN EQUAL OPPORTUNITY EMPLOYER
30" DWU Water Line P~
Coppell Sandy Lake Road
Date: 4/27/99 . -.
Prep'd By: MGD "-'-'"'
Pothole # I STA I Reason ~ Le~/. -roe ~,'.
1 "-~ ~n+nn ~nernl Lncntion Verification s'o'7, z.~ I O~7~ ~z.~
2~ 14+5~ Lig~oJe ¢.o.z~ 7.
3~ 15+65 ~torm Drain Inlet 4~8.~
4~ 16+50 ~[ght Pole ~9, ~ .... .,~.1° ~.~
5~ 21+00 General Location Verification ¢o~&, .... '~ ......
6~ 27+75 Light Pole ~ ~ ~..
~ 37.00 General Lo~tion Verification ~]k~ '-
~ 47+00 General Location Verification ~. ~
9~ -56*00 Light Pole +~,'~o
1~ ~+25 Light Pole e~.7~ ~.,o
11~ 58+00 Light Pole ~I*..,. ,, ~.3o ~ ~'~l
124~. 65+30 Proposed 21" St0~m Drain Lateral ~0¢1~.
13~~ 68+50 Depth of Cover ~. ~ 4.~
14~¢', 71+00 .Depth of Cover ¢oo. ~ ~.~ ~,~
15'~. 74*50 Depth of Cove~ ,gz. ~¢
16,~+~ 82+00 Depth of Cover ~z.~
17~'; 85+50 Depth of Cover ~o, z~ + ~o ~7.~
18 ~ 89+00 Southern Curb of No~hsid~ Paving 4~.z~
19;~ 92+50 Southern Curb of No~hside Paving4~.4~
20~ 102+00 General Location Verifi~tion ~4 t~
Note: Maximum distance between poth~)le locations is 1000'. 15 of 35
Bid pothole locations available for further investigation pending
results of 20 intial potholes. Contractor to notify City and Engineer prior
to performing pothole investigations.
P:\06108700\wks\pothole xls