ST8201-CS 890203 GINN, INC.
uary 3, 1989
Mr. David M. Snyder, P.E.
L. H. Lacy Company
P.O. Box 541297
Dallas, Texas 75354-1297
CONSULTING
ENGINEERS
Re: Denton Tap Road Improvements from Belt Line Road to Sandy
Lake Road - McDonalds Driveways
Dear Mr. Snyder:
I am writing this letter in response to your January 20, 1989
letter concerning your paving sequence in this area. I do not
fully understand your letter, but I can address a couple of items
which appear to be pertinent. The driveways for McDonalds were
not shown on the Contract Drawings simply because McDonalds did
not exist at the time that the Plans were completed. As to
paving of the driveways, they are customarily paved in accordance
with the Drawings and Specifications as if they were actually
shown on the Drawings. Payment, of course, is to be in
accordance with the applicable Pay Items in the Contract, and the
final quantities will reflect an overrun accordingly.
In discussing your proposed paving sequence for this area, it
would be helpful if you would provide a sketch of what you
propose for our consideration. When proposing your sequence we
will require a Traffic Control Plan reflecting your handling of
the traffic with respect to the adjacent controlled intersection.
We also expect you to coordinate the driveway construction with
the affected property owner.
Please provide our resident project representative, Mr. Randy
Fleming, with a sketch and a Traffic Control Plan of what you
propose and he will begin our review and comment process for this
item.
Please call me if you have any questions.
Sincerely,
John C. Karlsruher,
Project Engineer
P.E.
enclosures
CC:
.cd- n , p' Z.
~X~, P.E.
Randy Fleming
File J - 378
a:j378mac
17103 Preston I,~¢~ad · gt~itc 100 · kit 118 · I)alk~s, To×as 75248 ~' I'llonc 214/24g~4900
TO:
ATT'N=
F'ROOECT:
DEAR JOHN,
(5].NN, INC.. CONSUL'~IN[5 ENGINEERS
17]i..)3 PRES]ON ROAD
SUITE :l. uO~ LB-118
· ')¢-~LL A~i, -i' E XA~ 75248
,][)HN KA[(L. SRUI-IEf:(, F'. E.
DENTON TAP ROAD IMPROVEMENT FROM
PROOECT 378
BELT L. INE -ro SANDY LAKE
IN REVIEWING MY F'LANS (CONTRACT - CONTRACT) SET, iT FIAS COME
TO MY AT']"ENTION THAT NO PROVISION HAS BEEN MADE FOR DRIVE
APPROACHES TO THE McDONALD'S RESTmRAUNT PROPERTY JIUST SOUTH
[)F SANDY LAKE ON THE WEST SIDE OF DENTON TAP. THiS 1S P!tASE 2
WORK, BUT AS WE HAVE TALKED BEFORE ~
POUR BACK ONE OF THE McDONALD'S DRIVES, AND TNREE LANES OF
PAVING PREVIOUS TO PHASE 2 F'AVING OPERATIONS TO HELP REDUCE
THE N'JMBER OF' BLOCKOUTS ]'0 ZERO. ONCE. WE SWITCH ]RAFF:I~]
THE PHASE ] SLAB WE WILL PROGRESS VERY QUiDK:L.Y Wli'~l -[WE PHraSE
2 I)RAINAGE ~ EXCAVATION AC:] iVI'['IES.
THANK-YOU FOR YOUR ATTENTION TEl ]'H]:S
RESPEC]'F dLL','.
DAVID M. SNYL>ERr
PRO~ECT M(-'~NA GER
L. H. Lacy Company
General Contractors
214/357-0146
"Quality Construction for over 65 Years"
10888 ShadyTmil
~O. Box541297
Dallas, Texas 75354-1297