Loading...
Denton Tap L2R BA-CS010928 (2) MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To~ Date: RE: Larry Davis, Construction Inspector Engineering Avery Rodgers, Streets Division Public Works September 28, 2001 Walk-thru Everybody Fits 9/27/01 1. Grout box at RCP and box. 2. Lock broken on lids; bad patch on RCP that was broken, cardboard in concrete; grout box top, bottom & sides; grout RCP at box. 3. "Y" inlet grout at RCP's; grout bad joints in RCP's; need dp-rap or regrade for erosion at headwall. 4. Clear trash, debris, mud and dirt from all "Y" inlets and inlet boxes. 5. Bad connection at RCP and main - grout. 6. "Y" inlet not accessible, lock broken. 7. Forms left in inlet boxes. 8. Inlet box holding water, pour in bottom and grout at bottom of box. 9. "Y" inlet not accessible - full of mud. 10. Obstruction at RCP and box from the bottom being poured and leaked into RCP. PAVING 1. 2. 3. 4. Rout and clean and seal all cracks painted. Seal all curbs as marked. Replace traffle button as marked. ADA ramps are too small - replace. CITY OF COPpELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 09728×01 09:10 ID--CITY OF COPPELL DATE S,R-TIME DISTANT STATION ID MODE PAGES RESULT 09/28 01'09" 9?2 304 7041 CALLING 04 OK 0000 [ Julie Barnes- WALK-THRU fOE Denton Tap Dg~!0pmen,t ' Page From: To: Date: Subject: Development Rhonda Brothers walk-thru Mon, Sep 24, 2001 4:45 PM WALK-THRU for Denton Tap WALK-THRU for Denton Tap Development (Everybody Fits) and Fitness Court A final walk-thru for paving and utilities on the referenced project has been scheduled for Thursday, September 27, 2001 at 2:00 p .m. ! ,J, ulie Barnes. wALK-THRU for Denton Tap ~'elopment ,, Page From: To: Date: Subject: Development Rhonda Brothers walk-thru Mon, Sep 24, 2001 4:45 PM WALK-THRU for Denton Tap Development WALK-THRU for Denton Tap (Everybody Fits) and Fitness Court A final walk-thru for paving and utilities on the referenced project has been scheduled for Thursday, September 27, 2001 at 2:00 p .m.