July 20, 2001
Gerald White
Preston Engineering And Construction
6310 LBS Freeway Suite 208
Dallas, Texas 75240
Denton Tap Development (Everybody Fits)
Fee Assessment Le~er
Mr. White:
Enclosed is a copy of the revised City of Coppell Development Fee Assessment table that
includes the meter size changes as requested. A copy of the Development Fee
calculations for the referenced development is also included. The water impact fee
difference is $2,475.00, the wastewater impact fee difference is $1,350.00, the domestic
meter fee difference is $46.57 and the irrigation meter cost difference is $80.06. There
was a decrease of $84.26 in the cost of the 4" fireline meter on the new assessment.
However, the meter previously provided to you cost the City more so that savings cannot
be passed on.
Please make payment for the Impact Fees to the City of Coppell in the amount of
$3.825.00 and forward to the Engineering Department along with a copy of the Fee
Assessment table. This amount is a portion of the assessed fees that need to be paid prior
to Council approval.
The additional fees for water and sewer taps, water meters, and utility inspection fees
need to be paid by separate check at the Public Works Service Center, 732 Deforest.
Meters will be ordered when these fees are paid. . -
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Sincerely,D
Kenneth M. Griffin. P.E.
City Engineer
CC:
Sermifcr Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
G-reg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
Aug-Ol-O1 10: 30A
P.02
Project:
Date:
DEVELOPMENT FEE TABLE
Denton Tap Development (Everybody Fits)
7/20/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fcc $6,975.00 $6,975.00
(100% duc prior to Council Approval) ~i 2.At 7~', O~
Water Tap Inspection Fcc $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $189.37
(100% due. at Issuance of Water Meter)
Water Meter Fee (Irrigation/l"'ireline) $1,124.55
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance &Water Meter)
lrrigation/Firclinc Meter Deposit $60.00
(100% due at Issuance of Water Meter).
Wastewater Impact Fee $3,600.00 $3,600.00
( 100% duc prior to Council Approval) ~ I ~ 3~ O' O O
Wastewatcr Tap Inspection Fee $50.00
(100% due at Issuallce of Buildin~ Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $8,386.06 $8,386.06
(100% duc prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project I[
Street Sign Fee information not Available
(I 00% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
TOTAL AMOUNT DUE PRIOR TO COUNCIL A~PPI~
DEVELOPMENT FEE TABLE
Project: Denton Tap Development (Everybody Fits)
Date: 7/2o/20Ol
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee ~'~ $6,975.00
(100% due prior to Council Approval) ~ ~j+'/5-,~ P&.84)~oo.0o 5lz?~
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $189.37
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationfFire line) $1,124.55
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee ,v._ $3,600.00
(100% due prior to Council Approval) ~ I.~'~ 50.oO ~vt az?.~o, oo ~z~
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildinl~ Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee ,~ $8,386.06 '
(100% due prior to Council Approval) ~ ~'.oo
Street Light Fee Information not Available
(100% due prior to Acceptance of Project
Street Sign Fee Information not-Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL ,.
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
1
?Y
972 304 7041~ JUL-20-OI 4:57P~ PASE ~/3
DEVELOPMENT FEE WORKSHEET
/'~ OJECT: Denton Tap D~elo~ommt (Everybody Fits)
DATE:
Water Impact Fee:
Domestic Meter(s):
In'igetion Meter(s):
Fire#ne Meter(s):
1 - 2 inch = 8 ESU'a
I - I 1/2 inch -
= 5 ESU's
0 =~ 0 ESU's
1 - 4 inch = 2.5 ESU'e
O $450.00 ea.
Total ~. 15.5 ESU's O $45000 ea.
(100% due pdor to Council approval of the final plat)
Water Tap Inspection Fee:
Total #:, 3 Connections ~ SS0.00 ea.
(Single family due prior to Issuan~e of bui~lthg permit)
(All other developments due prior to iSsuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) ~ $189.37
(Single family due prior to issuance of building permit)
(All o~her deve~pmenta due prior to issuance of meter)
[mgation/Firclinc Water Meter Fee:
Total #: 1 Irrigation Meter(s) ~ $137.81
Total #: 0 Additional Irrigation Meter(s) ~ $0.00
Total #:., ,,, 1 Flrellne Meter(s) ~} $986_74
(100% due prior to issuance of water meter~)
~)omesfic Water Meter Deposit Fee:
Total #: I Meter(s) ~ $35.00 ea.
( 100% due prior to iSsuance of water meters)
rrigation/Fir¢ Meter Deposit Fee;
Total/k. 2 Meter(s) ~ $30.00 ea.
'~r'~"~ue prior to iSsuance of water metarl)
~Vastewater Impact Fee:
Total Domestic Meters ESU's: 8
Vastewater Tap Inspection Fee:
Total #: 1 Connections ~ $50.00 ea.
(100% due prior to lesuenue of ~uJlding permit)
Jtility Final lnspectiou Fee (All developments):
Total ~ 1 Lots ~) S50.00
(100% due prior to issuance of building permit)
$o.oo
~,74
(For Residential Developments Only):
Page 1
Aug-Ol-O1 10: ~OA
PROJECT:
DATE:
DEVELOPMENT FEE WORKSHEET
Denton Tap Development (Everybody Fits)
7/20/2001
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
__ 1 - 2 inch = 8 ESU's
1 - 1 1/2 inch - = ' 5 ESU's
_ 0 = 0 --ESU's
1 - 4 inch =" 2.5 EE, U's
Fireline Meter(s):
Tol:al #: 15.5 ESU'a {~ $450.00 ea.
(100% due pdor to Council approval of the final plat)
Water Tap lnspcction Fee:
Total #: 3 Connections (~ $50.00 ea.
ngle family due prior to issuance of bufJding permit)
other developments due prior to Issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) (~ $189.37
'(Single family due prior to issuance of building ~ermit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Totat #: 1 Irrigation Metor(s) ~ $137.81
Total #: 0 Additional Irrigation Meter(s) ~ $0.00
Total #: '~1 Fireline Meter(s) ~ $986.74
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) ~l $35.00 ea.
~100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 0: _ 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:.. 8 ~ $450,00 ea,
Wastewater Tap Inspection Fee:
Total #: I Connections ~ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: 1 Lots ~ $50.00 ea.
(100% due prior to Issuance of building permit)
$6,975.00
$150.00
$189,37
$137.81
$0.00
$986.74
$35.00
$60.00
$3,500,00
$50.00
$50.00
Park Fee (For Residential Developments Only):
Page 1
Aug-01-01 10: 30A
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
_ 0 Single-family ¢~ $0,00 per lot
-, 0 _ Multi-family {~ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid et issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way,
This fee Cannot be assessed until after T.U, Electric submits
the lighting plan for the proposed development,
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(Sea attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contrac~ should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0.00 --
-- $0.00 --
__ $8,386.06
Information not Available
Information not Available
Information not Available
Page 2
Aug- 0). - 0). ).0: 30A
PROJECT:
DATE:
ROADWAy IMPACT FEE CALCULATIONS
Denton Top Dtvelopmenl (Everybody Fi~)
7~001
P.05
ROADWAY IMPACT FEE:
' (Figure 2 - Roadwa.v Impact Fee Sludy)
"(Table 3 - Roadway Impact Fee Study)
'~'* (Schedule 2. Page 3 - Roadway Impact Fee Study,)
~ AMOUhrl~DUE: $8,386.0~