Loading...
TexasBank 2R-CS051026October 26, 2005 Chris Ripke Workman Construction Fax:,~.°'"~':',,o,,. ,~,,,,~,'°~° q?g/7qr-7/4g RE: TexasBank Addition, Lot 2R Block A (Creme de la Creme) Dear Mr. Ripke: Please be advised that a walk-through inspection is scheduled for Thursday, October 27, 2005 at 1:30 p.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, Rick O' Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CC: Keith R. Marvin, P.E., Asst. City Engineer Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal PARKWAY ~1~ p.O,BOX 9478 ~ COPPELL tX 75019 ~ TeL 972/462 0022 ~ fAX 972/30d 3673