MA 9601-CS 890602COPP~LL PUBLIC gORKS MEMORANDUM June 2, 1989 TO: Fl',( M: RE: Steve Goram, Director of Public Works Per Birdsall, Street Superintendent Bethel/Thweatt/Deforest Asphalt Condition Besides the surface abrasions which are not aesthetic, I have found only one location on Thweatt Road which should be addressed. This location is several hundred feet west of State Road on the south side. I spoke with Mike Sharp who said that the abrasions could not be addressed without making them even more noticable but this one location can be addressed with a skin patch to make it smoother. Minor abrasions exist on both Bethel and Deforest (Bethel shoulder work not complete yet) but non detrimental to the rideability of the pavement. The street and right-of-way crews are just now catching up on their routine duties due to the flood conditions that had existed. I will be scheduling them to smooth out the shoulders on Deforest next week. Status report June 9, 1989. PHB/sm