Loading...
MA 9601-CS 890413COPPELL PUBLIC WORKS MEMORANDUM April 13, 1989 TO: Steve Goram, Director of Public Works FROM: Per Birdsall, Street Foreman' RE: Major Projects SUBJECT:Asphalt Overlays - Deforest. Thweatt, Tickler 4/11/89 Bethel, Southwestern Contingent of the County Commissioner Court's approval of the court order, which would allow the County to perform the overlays proposed, the County should begin work on April 19th, 1989. Mike Sharp has indicated that the order of overlays (Deforest, Thweatt, Bethel, Southwestern) can be implemented. Deforest Road has no problem with beginning, Thweatt Rd. (at Royal Ln. Extension) will be off of the roadside by the 19th according to Steve Morton, Bethel Rd. has two projects that call for trucks (Bethel box culvert and the Post Office) primarily concrete, Southwestern Blvd. will have the waterline coming through in May (?). PHB/bb cc: Ail asphalt overlay major projects