MA 9601-CS 890224,4:22.;
Mop ~' Diagram) ~j~,~r.~
PROdECT JUSTIFICATION:
I. Right-of-Way '
Landscaping
4. Design, Inspectim,
~ L~ghting
Other
Notes:
Est Project Total:
Prepared B~/:
D~te:
GINN, INC.
CONSULTING ENGINEERS
December 21, 1987
Mr. Alan Ratliff, City Manager
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re: CIP Bond Program
Remaining Projects
Dear Mr. Ratliff:
In reviewing the status of funds remaining from the 1984 Bond
Program with Mr. Trando, we have determined that there is
approximately $485,000 Surplus Funds available for unspecified
projects.
After reviewing the City's needs and ~bligations, the attached
list was prepared showing the recommended priority and amounts.
Also attached are supplemental sheets providing additional
information about the projects.
Additionally, a list of traffic signal projects which are already
funded is included in the recommended list of projects for 1988.
Please advise if you should need any additional information.
Sincergl-Y'
H. Wayne Ginn, P.E.
ltWG/dsp
cc: Frank Trando
Steve Goram
17111t Ihcq,m R*,:td · .'4.itc D~O · I1{ lis · D;~lla~. Tcxa~ 7524~ · Phone 214,'24~-4900
Mop or Diagram) d~'5~"~uvz~c~:~'
PROJECT DESCRIPTION:
PROJECT JUSTIFICATION:
I. Right-of-Way.
2. Construction. ~ 50. o0o
3. Landscaping. '
4. Design: Inspectim,
I~ Teshr~ ~p ~J, oo0
G5 Lighting'_
Other _
Est Project Total:. $ ~ 000
Notes:
Prepared By:
Date: