MA 9601-CS 890223COPPELL PUBLIC MEMORANDUM February 23, 1989 ! TO: Alan Ratliff, City Manager ~t FROM: Steve Goram, Director of Public Wor~ RE: Warren Ct , DeForest Overlay Projectsv We have just received the estimate for the consultant work order to have the information released which had been previously gathered by Ginn, Inc.. The cost of $240.00 is the estimate which would have to be funded through the project which was approved by City Council for a total amount of $50,000.00. This information is required to avoid duplication of efforts and to enlighten staff on the details which had been investigated previously by Cinn, Inc. with involvement of Dallas County R & B Dist. 1. Questions which should be answered by this information are: 1) Has the necessary right-of-way been obtained to construct the culdesac at Warren Ct.?, 2) How will the court be drained/grade?, 3) Is the culdesac to be full depth asphalt or asphalt on a prepared subgrade?, 4) Will any grades need to be changed on DeForest or drainage restored or improved to insure the longevity of the rehabilitation?. The County could and has assisted in advisory capacities on several projects, but since they perform the aspects of rehabilitation, they do not have specifications .which we would require for bidding. With this information, we can procede to prepare specifications for bidding. The consultant work order will take one week to complete after authorization. SCG/bb cc: Frank Trando, Deputy City Manager/Finance Director Russell Doyle, City Engineer Per Birdsall, Street Foreman CITY OF COPPELL Co6sultant Work Order Date January 16~ 1989 TO: Consultant Ginn, Inc. Description O.[ Proposed Project: Locate and Submit any information previously compiled conc~rn~nq: The construction of a culdesac at the end of Warrent CourP and the placement of an overlay on DeForest Road. information is limited. Rc:ference or Purpose o[ Project: . Sta£f Contact: Per Birds~ll Authorization For Project. City Manager/Director Signature E'~;tlmated Project Cost As Follows: Number of ilours of Labor 4 c Material Cost $ N/A o N Comments: Docs not include rely mcetin,~s. u L Labor Cost $ 60.00/hour Total Estimated Cost $ 240.00 Estimated Time Required to Complete Project: 1 wock Project Manager: Kevin Peiffer, P.E. Telephone - Consultant's Authorized $.'i.~nature '~gt.~,~. . ~" 214 ) 248-4900 Project Number Assigned FundJ. n~ Source: Fund G/L Account No. Funding and Approval: Account Description Director ofF'..~nance, Date