MA 9601-CS 890119 (2)COPPELL PUBLIC WORKS
MEMORANDUM
January 19, 1989
TO: Kevin Peiffer, Ginn Inc.
· FROM: Per Birdsall, Street Foreman~
RE: Major Projects
Please provide a cost estimate for our review to provide design
and bid specification for the following major projects.
Bethel Rd.
Thweatt Rd.
Southwestern
DeForest Rd.
Warren Ct.
Attached is a Consultant Work Order form
¢omplata ~ha consu~'~ant section. If you
formation, please contact me. Thank you.
for each project, ~lease
need any additional in-
PHB/bb
cci Steve Goram, Director of Public Works
CITY OF COPPF..LL
Consultant Work Order
Ginn Inc.
Description Of Proposed Project:
Desiqe and Bid Specifications for: A two~ inch overlay
Localized repairs prior to overlay in areas of sub~rade
areas susceptible to ~loodinq (provided funds will allow).
and fill correspondinqlv before and after the overlay.
of DeForest Road.
failure and possibly
Shoulder qradinq
Re. ference or Purpose of Project:
_To i nc~r~ase l-h~ functional life.
Staff Contact: Per Birdsall
Au J:hor:i. za l:ion l~or Proj eat:
City Mg~nauer/D:i.rector Signature
rideabilitv, and skid resistance for a
Flu I::i.ma t(.~d I'~.'ojecl: Cos I: As
Number of flours of Labor
Mcql:orJ_a]. Coal: $
Fo].].ows:
Labor Cost $
Total. Estimated
Cost $
Estimated Time Required to Complete Project:
Project Manager:
Consultant's Authorized Signature
Telephone I[ ( )
Project Number Assigned
I'd.nd (]/L Account No.
F'unding and Approval:
Account Descripl:J.on