Loading...
MA 9601-CS 890119 (2)COPPELL PUBLIC WORKS MEMORANDUM January 19, 1989 TO: Kevin Peiffer, Ginn Inc. · FROM: Per Birdsall, Street Foreman~ RE: Major Projects Please provide a cost estimate for our review to provide design and bid specification for the following major projects. Bethel Rd. Thweatt Rd. Southwestern DeForest Rd. Warren Ct. Attached is a Consultant Work Order form ¢omplata ~ha consu~'~ant section. If you formation, please contact me. Thank you. for each project, ~lease need any additional in- PHB/bb cci Steve Goram, Director of Public Works CITY OF COPPF..LL Consultant Work Order Ginn Inc. Description Of Proposed Project: Desiqe and Bid Specifications for: A two~ inch overlay Localized repairs prior to overlay in areas of sub~rade areas susceptible to ~loodinq (provided funds will allow). and fill correspondinqlv before and after the overlay. of DeForest Road. failure and possibly Shoulder qradinq Re. ference or Purpose of Project: _To i nc~r~ase l-h~ functional life. Staff Contact: Per Birdsall Au J:hor:i. za l:ion l~or Proj eat: City Mg~nauer/D:i.rector Signature rideabilitv, and skid resistance for a Flu I::i.ma t(.~d I'~.'ojecl: Cos I: As Number of flours of Labor Mcql:orJ_a]. Coal: $ Fo].].ows: Labor Cost $ Total. Estimated Cost $ Estimated Time Required to Complete Project: Project Manager: Consultant's Authorized Signature Telephone I[ ( ) Project Number Assigned I'd.nd (]/L Account No. F'unding and Approval: Account Descripl:J.on