Denton Tap L2R BA-CS 980107 /~-') The City With A Beautiful Fut
Ro Box 4z8
COPPELL,
TEXAS 75019
PO. Box 478
Coppell, Texas 75019
972-462-0022
January 7, 3[998
Bill Anderson, P.E.
Dowdey Anderson & Associates
5225 Village Creek Dr., Suite 200
Piano, TX 75248
Denton Tap Development
Development: Fee A~essment
Dear Mr Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $15,136.06 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~j/~
K~'e'e~ m :-~if~a, 'P.E.
Director of Engineering & Public Works
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Denton Tap Developraent
Date: 1/7/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationJFireline) ' $1,107.75
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building PermiO
Utility Final Inspection Fee $50.00
(100 % due at Issuance of Building Permit)
' Park Fee $0.00 N/^
(100% due prior to Council Approval)
Roadway Impact Fee $8,386.06 $8,386.06
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100 % due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
tOTAL $16,738.19 1
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $15,~36.06
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Denton Tap Development
1/7/98
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Institutional
Land Use **
Bnildia~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee Per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
Nehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
Others/Not Specified 0institutional)
49,917
49.917
0.56
$300
$8,386.06
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
DEVELOPMENT FEE WORKSHEET
PROJECT: Denton Tap Development
DATE: 1/7/98
Water Impact Fee:
j~ <,/Domestic Meter(s): I - 1 1/2 inch =
",Irrigation Meter(s): 1 - 1 inch =
~'. ~r,i~' ~reline Meter(s): 1 ~A/inch =
~' ~t,~ ~'~ Total #: 10 ESU's @ $450.00 ea.
~0~'~'~ (1--~-% due prior to Council approval of the final plat)
5 ESU's
2.5 ESU's
ESU's
2.5 ESU's
$4,500.00
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due p¥ior to issuance of meter)
$150.00
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $144.38
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$144.38
$57.75
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: I Meter{s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$57.75
.$1 ,CCC.CC
$0.00 ,~. ,
$30.00
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
@$450.00 ea.
$2,250.00
$50.00
$50.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 3
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
{50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$8,386.06
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at ~his time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 4