CF-Cozby Library-CS051027 T H E , C I T Y · O F COl'FELL MEMORANDUM 'FO: FROM: DATE: REF: Sheri Moino, CFM Larry Davis, Construction Inspector ~7/~ October 27, 2005 Libra~' Acoustic Wall :% you know, there 'acre some existing underground utilities exposed during the pier drilling process, h appears that the 10" gravity flow roof drain was damaged and also an undetermined 4" PVC pipe `a. as cracked. It is nay onderstanding that the contractor `a'ill return on Wednesday November 2 to resume and complete drilling tbr the piers. The time between now and that date would be a good time to tmdertake repairs of the damaged utility lines so that the prqject can proceed. Call me if you have any questions. Kcith Marvin, Asst. City Engineer Project file