Loading...
Creekview North-CS 890926COPPELL PUBLIC WORKS DATE: TO: FROM; RE: September 26, 1989 , Construction Inspector . Larry Davis Howard Paf. ford, Water Utilities Superlnte?dent~ I have assigned field personnel to perform a final end of maintenance bond walk thru on the above reference project. Below I have listed items that have been found to be deficient. Location Description 1. 24 + 9.79 Clean Out is Not Plugged 2. Lot 39/Penuel Drive Main Line Valve Needs to be Reset 3. Ail Manholes Need to be Grouted on the inside of the ring. Please make sure these items are addressed prior to end of maintenance bond. If you have any questions regarding this matter, please advise. HLP/bb xc: Steve Goram, Director of Public Works Ted Dutt, Water Utilities Crewleader CRKVIEW.HLP