Loading...
ST8201-CS 881107GINN, INC. Project: Date: CONSULTING ENGINEERS UTILITY LINE Area: ~ Line: Diameter: J~"F.~, ~.a:~ Length: .3'~Zz~.~. Plan Sheet No: ~z~,~'M,- PRESSURE TEST START Time: /~wf ,M~l Time: Pressure: /,fS-,~j~ Pressure: Allowable Leakage Per Day: (23.$ gpd) X (./f$~miles of pipe) X ( ~ inch Gallons Lost Per Day: ( ~ Gal. Lost) ~ ( Passed: /~-~ FINISH Diameter) Hrs. Tested) X 24 Hrs. Rejected: INFILTRAT ION/EXF I LTRATION TEST START FINISH Time: Time: Allowable Leakage Per Day: (250 gpd) X ( miles of pipe) X (__ Gallons Lost Per Day: ( Gal. Lost) ~ ( Hrs. Tested) X Passed: Rejected COMMENTS: inch Diameter) = 24 Hrs. = Tested Performed By: Passed or Rejected By: 13740 Midway Road · Suite 502 · Dales, Texas 75234a Phone 214/3~11