Loading...
Creekview North-CS 901205Re: Low Flow Erosion Control Wall/Grapevine Creek 224 Bethel Road, Lot 4 Block 'B' 228 Bethel Road, Lot 5 Block 'B' 232 Bethel Road, Lot 6 Block 'B' Dear Mr. Maier: Enclosed please find copies of documents we received from Mr. Ron K~ight, the contractor, for Staff's review and evaluation of his request regarding the above referenced erosion control wall, on November 28, 1990. We reviewed the submitted information, as per your request during our telephone conference on December 4, 1990. As you may know, this area of Grapevine Creek has experienced erosion, as identified in the Coppell City-Wide Storm Water Management Study. We, therefore, are in favor of any functional erosion control plan and have no objection to the above project, as long as the following comments are addressed. 1) Provide a grading plan showing the existing and proposed grades as they relate to the wall, sealed by a registered professional engineer in the State of Texas. The information on the attached grading plan can be used as a base plan, with some modification along with the engineer's seal. Upon completion of the proposed wall, provide the City with the As-Built grading plan(s), certified by the registered public surveyor. 2) Provide some details showing erosion protection along the edges and the bottom of the wall. Smooth transition is reconunended between the proposed wall and the earthen channel, by use of materials such as rock rip-rap or similar material. 3) The existing creek bed and creek slope must be maintained and the fill activity, must be kept to minimum, as it may become necessary for the proper construction of the wall. Letter to Nathan D. December 5, 1990 Page 2 Maier 4) Comply with the City of Coppell Floodplain Ordinance #87390. We recommend that the height of the proposed wall be above the two-year water surface elevation. 5) The City of Coppell be furnished with a "Hold Harmless" letter stating that the applicant(s) will assume all liabilities associated with this activity; and will indemnify and hold the City of Coppell harmless from any damages resulting from this activity. If you can facilitate the proceed of this project, please provide the above listed information, along with your written response and recommendation. Once again, please note that we are in support of these types of projects, as long as the City of Coppell's minimum standards are complied with, and a reasonable and sound engineering design criteria is being applied. We look forward to working with the applicants and/or their representative(s) on this project. Should you have any questions, please call me at 462-8495. Sincerely, M. Shohre Daneshmand, I~E~-- Acting City Engineer cc: Alan D. Ratliff, City Manager Steven G. Goram, Director of Public Works Ron Knight, J. Ronald Knight & Associates 'i L/ I December 5, 1990 Mr. J. Ronald Knight P. O. Box 202541 Arlington, Texas 76006 Re: Low Flow Erosion 224 Bethel Road, 228 Bethel Road, 232 Bethel Road, Con(r-o] Wal I/(;rapr3vine CrEEk I,ot 4 Ble(:k '1{' Lot 5 Block 'B' Let 6 Block '1{' Dear Mr. Knight: We have re. viewed tile dEcum(;nl:s y()u prov idt.M I:o ils ell Noveml)er 1990 (see attached docllmelll:s). ALs ¥()11 nla¥ kllow, this Grapevine Creek has experienced ocosLon, as ~dentifi.ed in tile Coppell City-Wide Storm Water ManagEmEnt Study. We, therefore, are in favor of any functi.onal Erosion (eel;roi plan arid havo no objection to the above projech, as long as LhE following comments are addressed. 1) Provide a gradlng pl. an showing the existing and proposed grades as they relate to the wa].], sEa]ed by a regJste~:'ed professional engineer in the State of Texas. The infomation on the attached gt~ading plan can be used as base plan, wi. th some modil:ir:al:ion along wil:h tile engint~f~l:'s seal. Upon cempletion of I.In~ pr{q)os(~(l wal I, provJd(~ t, he City wit. h l:he As-Bu.ilt gFading pl~nl(a), certi[Jed by I:ht~ registered public surveyor:. 2) Provide some (]eta:ils tihowin(_l (;]'()sit~n I)I-oLEcL.Jon alen%l I:h(~ edges and the bottom ef I:he wall. Smool.h transi. Lion i:~ [11/i I:eri a I.. 3) The existing creek bed atld (: (ck. slel)e must; be maint:ai u(M and the fill. act.'LvLLy, must bE kept Lt) mi. nimumt aa il. 111,~ become necessary loc I:ho ])F<)[}EI:' coI/sl::t?uc:l:ioIl OJ~ t,ho wall. 4) Comply w:Lth tho City el (;(q,l~(:ll Floodplain Or(iinance t1117390. We recommend that the he.i{.lhl, el! the Dreposed wa].1 be above tho two-year wa to( sur l!ac~ ~:'1 (~va t i on. Letter to J. Ronald Knight December 5, 1990 Page 2 5) The City of Coppell be furnished with a "Hold Harmless" letter stating that the applicant(s) will assume all liabilities associated with this activity; and will indemnify and hold the City of Coppell harmless from any damages resulting from this activity. Please provide the above listed information, along with your written response and recommendation of this proposed project. Once again, please note that we are in support of these types of projects, as long as the City of Coppell's minimum standards are complied with, and a reasonable and sound engineering design criteria is being applied We look forward to working with you on this project, and should you have any questions, please call me at 462-8495. Sincerely, ' ~./~ohre Daneshmand, Acting City Engineer cc: Alan D. Ratliff, Steven G. Goram, ~/Nathan D. Maier, City Manager Director of Public Works N. D. Maier, Engineering Consultant KNIGHTLT.MSD FP ~4.1 II ! II CONTRACT DOCUMENTS and GENERAL CONDITIONS OF AGREEMENT for Design, Permitting, and Construction of Low Flow Erosion Control Wall at 232 BETHEL ROAD for ROBERT W. BERNHARD in Coppell, Texas SEPTEMBER, 1990 CONTRACT DOCUMENTS and GENERAL CONDITIONS OF AGREEMENT for Design, Permitting, and Construction of Low Flow Erosion Control Wall at 228 BETHEL ROAD for PHILIP M. JEWETT CONTRACT DOCUMENTS and GENERAL CONDITIONS OF AGREEMENT for Design, Permitting, and Construction of LOw Flow Erosion Control Wall at 224 BETHEL ROAD for DON R. MEADOR iR Coppell, Texas SEPTEMBER, 1990