Loading...
ST9302-LR 981104ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 1114/98 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-5 PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ SOIL ID ommuu MAX~UUU LAS ~N ;'t. ACE ~N ;'~.~CE PERCEm' NO. DATE NUMBER MOISllJRE DRY ~ ~ DRY O~NsrrY COMP~,cn(~ COMMENT* 3 11/4/98 FG 3 13.3 117.6 14.6 112 95 1-A 4 11/4/98 FO-1.5 3 13.3 117.6 1~3.8 114 97 1-A 5 1114/98 FO 3 13.3 117.6 13.9 115 97 1-A 6 1114198 FO-1.5 3 13.3 117.6 13.2 113 96 1-A TEST LOCATION: UTILITIES 3 RETEST OF TEST #1 FROM 10/30/98 4 RETEST OF TEST #2 FROM 10/30/98 5 STATION #94+00 RCP : 6 STATION #94+00 RCP 7 STATION #94+00 RCP 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED ~' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B, PERCENT COMPACTION DOES NOT COMPLY Wtlt'l SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOI=_~ NOT COMPt.Y W/TH SPECIFICATIONS D, RETEST